You are on page 1of 2

LIST OF UPCOMING MAJOR PROJECTS IN KUWAIT

Sl. No. Projects Description Plant Capacity Client Type of Project Project Cost Tentative Schedule of Tender

Infrastructure Projects
1 Kuwait National Rail Road 411 KM Length. KAPP / PART BOT 8 B US$ 2022
The Rail Road system will serve freight and
passengers and will have a 120 km/hr
regional lines speed and a 200 km/hr high
speed.
2 Kuwait Metropolitan Rapid Transit System 160 KM Legth, 68 Stations KAPP / PART BOT 18 B US$ 4th Quarter 2020

3 Mubarak Al-Kabeer Port Development Dredging, Port Development, Container MPW EPC 10 B US$ 4th Quarter 2020
Terminal & related infrastructure facilities

4 Silk City, Sabiya 250 Sq. KM Area MPW / PAHW BOT / PPP 86 B US$ TBD
175,000 Residential Plots, Roads &
Infrastructure, Olympic Stadium & various
commercial centers
5 Bubiyan & Failka Iosland Development 530 Sq. KM & 43 Sq. KM Area MPW / PAHW BOT / PPP 9 B US$ TBD
Residential Units, Jetties, Hotels & related
facilities
6 Wastewater treatment plant in South Al- 400,000 Cu. M/Day MPW DBO 600 M US$ 2nd Quarter 2020
Mutlaa
7 Fahaheel Expressway (Elevated) 36 KM (Al Ahmadi to Kuwait City) MPW EPC 4.4 B US$ 4th Quarter 2020
22 Interchanges and 16 Pedestrian Bridges

8 New Entertainment City, Doha Area - 2,570,000 Sq. M Amiri Diwan DBFOMT 2.6 B US$ 4th Quarter 2019
Ride Based Outdoor Theme Park, ndoor
Theme Park, Aqua Park, Gaming Arcade,
Show based area, Snow/Ski Park,
Multiplex/Drive in theatre/Open Air
Theatre, Sperts Center,
Museum/Entertainment/ Cultural Center,
Hotel/Resorts/ Villas/Service Apartments,
Retail Mall/ High Street Retail etc.

9 South Sabah Al-Ahmad City Project Area - 6150 Hectares PAHW Projectrs Under Planning & Design
No. of Residential Units - 20379 Stage
Unit Space - 400 Square Meters
10 South Saad Al-Abdullah City Project Area - 61442 Hectares PAHW Projectrs Under Planning & Design
No. of Residential Units - 25000 Stage
Unit Space - 400 Square Meters
11 East Sabah Al-Ahmad City Project Area - 124.22 Hectares PAHW Projectrs Under Planning & Design
No. of Residential Units - 1000 Stage
Unit Space - 300 Square Meters
Oil & Gas Projects
12 Jurassic Production Facility 6 & 7, North Kuwait 50,000 BPD of Oil & 150 M SCF of Gas (each KOC BOO 450 M US$ (Each) 4th Qarter 2019
facility)
13 Al Zour Petrochemical Complex Package 1: Gasoline Unit, Aromatic Unit, KIPIC EPC Package 1 - 4 B USD 3rd Quarter 2020
Services Utilities Unit Area B, Outdoor Package 2 - 4 B USD
Facilities for units Area B. Package 3 - 1.5 B USD
Package 2: Olefins Unit, Services Utility &
External Utility Unit for Infrastructure in
Area D1.
Package 3: Export Port Utilities, including
Ground & Sea Pipelines & Export Port.

Power & Water Projects


14 Az-Zour North Phase 2 + 3 IWPP Power - 2700 MW KAPP / MEW BOOT / PPP 3.5 B US$ 2nd Quarter 2020
15 Al-Khiran IWPP 1 Water
Power --165 MIGD
1500 MW KAPP / MEW BOOT / PPP 2.5 B US$ 3rd Quarter 2021
Water - 125 MIGD
16 Al-Khiran IWPP 2 Power - 1800 MW KAPP / MEW BOOT / PPP 2 B US$ TBD
17 Doha Phase 2 RO Desalination 60 MIGPD MEW EPC 450 M US$ Under PQ, 1st Quarter 2020
18 Doha East (Rebuilding) Power - 2400 MW MEW TBD 3 B US$ TBD
Water - 100 MIGD
19 Shuaiba South Power - 1800 MW MEW TBD 2.5 B US$ TBD
20 Nuwaiseeb Phase 1 Water
Power --50 MIGD
3000 MW MEW TBD 4 B US$ TBD
Water - 75 MIGD

You might also like