DPR 23042018
DPR 23042018
Total Scope
Sl. No Item Description UoM for the Scope for Scope Achieved for the day
project the available
Contractor before tree Night
as per LOA cutting Day Shift Shift Total
Manpower status
RBR Pioneer
Sl. No. Manpower
Day Night Day Night
1
Project Manager 1 - 1
2
Engineers 6 - 3
3 Supervisors 4 3 5
4 Foreman 5 2 1
5 Surveyors 2 - 1.00
6
Operators 11 4 23 2
7
Drivers 9 7 15
8
Eletrician - -
9 Mechanic -
10 Welder - -
11 labour 9 6 7
TOTAL 47 22 56 2
Airport Project Dt 23.04.18
rom ch 3000 to 3750 ) Pioneer Global Projects Pvt Ltd( From Ch 2000 to 2200 and Ch 2600 to 3000 )
Cumulative
achieved by
Achieved for the day
Cumulative Scope for Scope available Cumulative both the
the contractors
Achieved Till Contractor before tree Achieved Till
Date cutting Night Date during the day
as per LOA Day Shift Shift Total
42,750 380,000 - - - - - -
121,840 2,600,000 260,000 1,968 1,968 30,620 7,504.00
WIP 2,000,000 - - - - - -
Equipment status
RBR Pioneer
Sl. No. Equipment
Day Night Day Night
1 4 2 4
Excavators
2 4 5 2
Dozers with ripper
3 Dozers 2 2 2
4 Tippers 9 7 13
5 Grader 1 1
6 1 1
Vibromax Roller
7 6 2
Water tanker
8 1 1
Tower lights
Cumulative
achieved by
both the
contractors till
date
42,750
152,460
96,616
WIP