You are on page 1of 65
HIMACHAL PRADESH POWER TRANSMISSION CORPORATION LTD. (A State Govt. Undertaking) Regd. Oltice: Hinfed Bhawan, New ISBT Rosd,Panjar, Shimla-174005, Phir 0177-2891283, 2831264 FAX:-0177-2691266 (Gin): veososHp2008s6C030950, (GSTINO2AACCHISAEM1ZP ‘Gre IF&AIRECIKarian & Phojal/ 2019-20- Dated: 19 | ac /2 |4 To The Chief Project Manager, MIS Rural Electrification Corporation Ltd. Pt, Padam Dev Complex, Ph-2, the Ridge, Shimla-1(H.P.) Subject: CONSTRUCTION OF 220/33 KV GIS SUBSTATION AT KARIAN AND PHOJAL ALONG WITH ASSOCIATED LINES. Ref; 1. Scheme Code REC/PO/HP-TD-TRM-295-210-3781. 2.No. RECIPO/HP-TD-TRM-295-210-3781/2013-14/1385-91 Dated: 11.03.2014. Dear Sir, Refer to above, the revised scheme for the construction of 220 KV DIC Transmission Line from Phozal to Pattikul along with 220/33 kV 80/100 MVA GIS Sub-station Phozal, Distt. Kullu and construction of ‘220KV DIC Transmission Line from Karian-Rejera and 220/33 kV GIS Substation at Karian against the original scheme code: 3781 is enclosed herewith for seeking the additional loan of Rs 40 Cr. from M/S REC Lid. This is for kind information and necessary action in the matter, please. ce: 4.P.S.to the Managing Director, HPPTCL, Himfed Bhawan Shimla-05. 2.PS tothe Director (Projects), HPPTCL, Himfed Bhawan Shimla-05. 3. General Manager (Projocts), HPPTCL, Himfod Bhawan Shimis-05, 4.Dy. Genoral Manger (Projects), HPPTCL, Kullu & Chamba Zono. } Dy. General Manager (Finance) HPPTCL, Shimia-05 H.P Power Transmission Corporation Limited (A State Govt. Undertaking) Regd. Office: Hifed Bhawan, New ISBT Road, Parjar himla-173005 Phone-0177-2831283, 2831284 FAX-0177-2831284 Web-wwrw.hpptdicom uPPreL (Cin: vaotosnrz0osssco309s0 (GSTIN}o2aaccHisestaize IPPTCL/Revised Scheme/KAR/AN/F-35/2019- 2692-76 Dated:- 7S Joy Dory NO To «the Rural Electrification Corporation Ld. Pt, Padam Dev Complex, Ph-2, The Ridge, Shimla-01(HP). Subject:- Revised Schemes for the C/O 33/220 KV GIS. sub-station Karian along with 220 kv s/c Transmission line Karian to Rajera in Distt. Chambaamounting to Rs.52.37 crore. Scheme Code REC/PO/HP-TD-TRM-295-2010-3781. Reff: No. REC/PO/HP-TD-TRM-295-210-3781/2013-14/1385-91 Dated: 11.03.2014, Sir, Revised scheme for the construction C/O 33/220 KV GIS. sub-station Karian along with 220 kV S/C Transmission line Karian to Rajera in Distt. Chamba against the original scheme code : 3781 is enclosed for obtaining the revised sanction of the competent authority please, DA. Two No. Schemes. Yours faithfully, ely. Projects), HPT, Himfed Bhawan, Panar, Below old MLA Quarters, ‘Shimla-05, (H.P.) Copy forwarded to the following for information:- 1, The PS. to Managing Director HPPTCL, Himfed Bhawan, Shimla -05 for kind information of worthy Managing Director pleas, 2 The Sto Director (Projects), HPPTCL, Himfed Bhawan, Shimla 05 for kind information of worthy Director (Projects) Please The AGM, HPPTCL Transmission Line Design Office, Anu, Dist. Hamipur HP 4. The OGM HPPTCL, Chamba & Kullu for information, at Projects), Himfed Bhawan, Panjari, Below old MLA Quarters, Shimla-05, (H.P.) H.P. POWER TRANSMISSION CORPORATION LTD. REVISED SCHEME FOR THE CONSTRUCTION OF 337220 KV GIS SUBSTATION AT KARIAN & CONSTRUCTION OF 220 KV SIC TRANSMISSION LINE ON DIC TOWER FROM 23/220 KV GIS SUBSTATION KARIANTO 490 KV PGCIL POOLING ‘SUB STATION CHAMERAI ( RAJERA IN DISTT. CHAMBA (H..) DEVIATION OF SCHEME asper | AsperRevised | oierence( | Proposed StNo Description Schemo{ Amt. | Scheme( Amt. in] jeer ay | deviation (Amt.| Remarks ‘in Lakh) tan) | Amt in lakh) | 220KVSIC Transmission Line From Karian to Rajera. Jc10 220 Kv sic Transmission line on DIG Tower trom 33/220 ‘As per General KV GIS substation Karian to 400, AA" IY paca mornin 555.16, 757.38 202.20 20020 | abstactatached IChamerail( Rjere) in Dist. Ne! [Chamba [Aah cont charges 0.00, BT Pa 2272 otal 355.16 760.08 224.92 22692 lad 11% Departmental Charges | 0.00 85.81 e581 8581 [Add 12.36% Senice Charges on A 0.00 1061 1081 1081 [Sub-Total 555.16 37650 32138 32134 [cio 2nd Circuit on existing DIC ltowor from 33/220 KV GIS |substation Karian to 400 KV Proposed Fooder A2 pci pooling substation oo. in tee: aes P.No. 21-8 Ichameracil( Rajera) in Dist. Ichamba. [Aas 396 cont. charges 0.00 539 5.38 5.38 [rota (0.00 76521 13521 10521 [ada 1196 Departmental Charges pee 0.00 1978 2037 20:37 Labour Coss @ 1% on 179.82 0.00 180 180 180 [aad 18% GST Charges on Rs. aad ee 0.00 3237 3237 3237 [Sub-Total 0.00 230.6 230.46 23946 [Grand Total) 555.16 1118.66 560.50 560.50 eS 331220 KV GIS Karian ‘General (C10 33/220 KV GIS substation at abstarctattached Bis eo ere 2620.48 3025.42 195.94 195.94 aes P.No. 31 82 _|Recommisionig Charges. 0.00 13570 13870 1387 [rota 2620.48, 3161.12 33164 331.64 [Ada 39 cont charges (exe pe 0.00 9076 90.78 e076 rota 2628.48 3251.88 422.40 42240 [Add 17% Departmental Charges (| lexcluding B2}ie on Rs3116.18 0.00 34278 342.78 323.19 eh [Ads 12.35% Servies Charges on pone 0.00 6170 6170 52885, ‘Grand Total (6) 2029.48 3656.38 826.88 22688 ‘As per General abstarct attached cc lextracivi works aan [CIO of Rest Camp Cum testing 1 |Laboratony at Karian in Dist ° 46.02 48.02 46.02 Po. 46 [Chamba (HP. i |C/O Type-Iil & Type-ll & Type -IV_ w C2 {quarters and ste development ° 4282 a292 asze2 Proposed hereof Providing Protecion work at laiterent tower locations. Due heavy ash lod some tower 3 Jrocetion become sliding zone so, °, ey, rae me Pe the protection of towers urgently required [CIO Accommodation for sesuriy 34° fat33/220 KV GIS substation ° 1145 1145 1145 Pio. 68 karan [Fencing around the 387220 KV Gaya lrowee eran tect ° 3.95 395 395 Po. 63 rotat ° 526.93, 526.83, 526.93, [Ase3 % Contengencies Charges pets Gs 0 16.81 15.21 otal o B27 ZT [Aad 171% Depanmental Charges aes ° 57.98 57.96 |Add 18% GST on Rs 626.93 ° 9485 94.35 [Grand Total (©) ° 695.55 695.55 GRAND TOTAL(A+B+c) | seae4 | 5467.57 | 208293 | 2082.93 Cost of Sanctioned Scheme =Rs 3384.64 Lakh Say Rs. 33.85 Crore Cost As perRevised Scheme =Rs 5467.57 Lakh Say Rs. 54.67 Crore 's 2082.93 Lakh Say Rs.20.82 Crore Deviation Amount (A State Govt. under taking) HPP'TCL Zone . Chamba, Distt. Chamba ( H.P.~176318 Tel fax n0.01899-220830 E-mail:—demchamba@hpptcl.in No.HPPTCL/IDGM/Rev. Scheme /2018- S4S-YR Dated:- g-Jo~298 To eo GM. ( Projects), HPPTCL, Himfed Bhawan Panjari, Below Old MLA qurs. ‘Shimla-5 ( H.P.) Subject:- Deviation of Scheme for the construction of 33/220 KV GIS sub Karian along with 220 KV SIC Transmission lino Karian to Rajera in Distt. Chamba. ‘Scheme code REC/POIMP-TD-TRM-295-2010-3787 Sir JALHIND With reference to above cited subject the revised scheme for the construction of 33/220 KV GIS sub Karian along with 220 KV SiC Transmission line Karian to Rajera in Distt. Chamba, Scheme code REC/PO/HP-TD-TRM-295-2010-3787 is enclosed herewith after attending the observations raised vide your office letter no. HPPTCL/Proj./F-35/2018-19-7107 dated 11" September 2018. The detail of deviation of scheme is given below. SNo. | Particulars | Asper | AsperRevised | ~~ Proposed | | } | "Scheme Deviation, | Fae ree en mere te a i I | 4. CiO 220 KV SIC Transmission | 555.76 Lakh | 876 50 Lakh | 321.34 Lakh } | Linefrom Karian’ to Rejera in | { Distt. Chamba ‘Karian in ioe 48 akh [3686.36 Lakh "626 66 Lakh 3 Tra civ works —— 170583 Caen 7os es a Total ‘or 5236.68 Lakh or! 185204 Lakh or) | {33.86 crore | 82.37 cr _| 18.82 crore ! “Therefore, It is requested to kindly take the necessary action for obtaining the necessary approval from the competent authonty please DA- As above jects) HPPTCL, Chamba Zone Copy to 1. The PS to Managing Director, HPPTCL, Himfed Bhawan, Panjari Shimla-6 for kind information of Managing Director please. 2. The PS to Director ( Projects). HPPTCL, Himfed Bhawan, Panjari Shimla-S for kind information of Director ( Projects) please 3, The GM ( C&D) HPPTCL, Himfed Bhawan, Panjari Shimia-5 DGM (Projects) HPPTCL, Chamba Zone Fai a ’ Annenure "AY H.P. POWER TRANSMISSION CORPORATION LTD. 7 REVISED SCHEME FOR THE CONSTRUCTION OF 33/220 KV GIS SUBSTATION AT ’ KARIAN & CONSTRUCTION OF 220 KY S/C TRANSMISSION LINE ON DIC TOWER FROM 32/220 KV GIS SUBSTATION KARIANTO 400 KV PGCIL POOLING ‘SUB STATION CHAMERA.II (RAJERA JIN DISTT. CHAMBA (HP) [MAIN ABSTRACT FOR 33/220 kV GIS Sub-Station foal sen [4s per sanctioned] As por Revised £ Descrntion scnome nee)’ | cekemeaney [Ditorencetin Rs) Remarks | ; As per Annexure 1+, ost of supply 23040730800 | 240569814.00 | 107231000 Cancion pan D% 1 ‘AS per Annexure | 2 fooster erection 7 1318867600 | 1325073300 | 7105500 pe eS logs 2 Joost of cal works oast696.00 | 30261696.00 0.00 9 be Aroeraa i | tached. Pinte ZO | {Statuary Variation due to Changes T 4 |inexcise Duty and Service Tax of Cv 0.00 9866170.00 | 380611000 land ETC. 30 Foc roving 250KvA New Transformer As per Ste & Jar Suostaton Ste oy ‘perecoco | ‘eTo00cn | open 6 [Eniry Tax Paid on Supply 0.00 12000000.00 | 12000000.00 7 [Tender and Advertisement Cost 0.00 179656.00 | 179858.00 8 |suney expenses | 0.00 27mni00 | 2rri11.00 i I | 9 {Testing crarges 0.00 6700000 | 367000.00 | 10 [besion an Drawing Carges 000 | aeszs000 | 46s2¢0.00 i TOTAL 2ensa7e7a | sonsiz0ao | 19534402 Junie Engineer (E) Jy. Manager Circte Heat-traughtsman ‘earsmssion Division wer Trans.corp Lid. HPPTCLPIUChamba — oprce Neate Creme? ae ge HPPTOL Chamba Zone HPPICL Mugio.Chamba Hp Ott Chamba (HP) ee BH r We eB UIRYD “e/6ny) Jebeuey hoy PMUEUD Ald TOyddH (3) oak i slais) | | als s lg i T Le TT Lelel iu Uy Si lie si sls lee sles gH OqUIDYS'DIONA TOlddH cary) equreNd WSO euoz equeus TOLddH =~ goad ano ew) vawens ata pridiog'suesy samodiy' weg eISNW IDide pirdiepemaL owed Seg uosaueue,, “EO Mle Toke ork saBevey AO (a) seourbus {Rune waa vt f "| eamme P-26A HIMACHAL PRADESH POWER TRANSMISSION CORPORA C (A State Govt, mler exhingy above, and DGM 6 rsd 1 a by a this sn Rayer auto ower above ers je euay FH Se. Manager Yeanmonon Divisio, WPVATEL sgl, ¢ IAP 70318 and bintne n Tieharier eerie nae Cham : >.G.M1. 4), othe MD. HPOTCE, Barowaias House, Khan, Shinn? fo nk patho et But BOk eee . pPysorn h oy) NaS Scanned by Cam Seon 2 - ~ SSS — b-R e ae INP, POWER TRANSMISSION CORPORATION LiNtTED fis, 1 Soe Govern Unraing) BAROWALIAS HOUSE, KIALINI SHIM? Pho Qh 7T 2606384, FAK 2620227 so ira TEL Toa Rar noe 5110-1] Backs hy eS SHeMUNS LID for sa, secran MANU INDUSTRIAL AXE Whons, GURGAON. T2015, ais Kune Sigh Pret Manager pamee Award for Suppies asian Tender Na, DOMORARIAN StMW STATIONOR200) x wing, Te x oF einen, leat ah Lanta & Cail ahs an Dist Cha Am SH2RHRY GIS $e Sen at ont in Quart etreces Yous oie Boer a 04 0808 iABSPP TCLS NRE eS 2 28 ad STESINTEL RAR Sie aguas abo award athe some Rats Tung wpe | Gamay Amer] es | Tae faegom ve {eso [oa] seve fans Cetin wt ‘peered wih yao dc 29662014 rs ects) HPNTEL. Basomtios ha 3 ra ject) HUPPTCL, anomtas Mens, HOST mete ac ana rt tet Tea Ser theess PPE # Scanned by CamSeaner eles Limite 2 Madr. Sector ag O38 MFchase OFiler far the sy ily * SSIC2009-1, Trivecty 2s, Fiease arrange to supply Voitee ch, packing DRORPORATION Listen AEM SHIMLA. 47 1009 BSGCHION59 Web pee Patou ns Satetkctronic ABE ann tt BeDirectional Ener sy Meier 2 SUT and BUMS corp fer sans ar Conditious of yee Scanned by Canseco tc. The Bill be deawn on Addi G wal Mawa, ee Mansging iaucets tumour due Deseryeson oy Fe sminder tf pout Tares, Duties p fetal of station feo (Face, 0-0 te Man agin? ts pesipMient Rhafint husky : swoice should be a3 (0 the koncenied censigne 1 my ‘ encsried eeasignes, 26 well 3649 General Manager it . neh, Hare sar Kbaitsi Shits together svi ispaich Nine, Chatan creme an inwof wager, trantber OF pocknges, Special ishing thereon maa eee BLA FRY PERIOD: . crs of te spudpntent shall Ye comple within ane menu fio the Tas tance Order is places on the srict ucderstaniny that anne work of vasnufecnne net ay eee ne cage Nnation shall be competed witht dcivry period agresdta,subfext vay Aujewe ns per clause ‘tall be seni by Kegistered Post and delivery period will be counted fora th © Order, A period of 7 days front the issue of purchase order will by allowed tie ese siomnent shall bbe considered 0 have been delivered nly. lien alt dhe componenis! pats delivered at the Consignee Store ‘ove ol teceipt of the cavipmentsat destination store wil be reckoned as the date of delivery sietiwery period 18 subject to stipulation uncle clause No.2.08 (Delivery) of General Tein Couditans of the Paehase Order Force Majeure 2 ‘dams ae Wy lay exon tact hom a Contos weasaoaler etedst wesludng but + compliance vith egulations, ordeis oF instructions of Aki an) Canmicsion, eto € Sittnce Authorities, fires, strikes, factory shut dosins 1 alleeations, iwvasiog, war, 1 wm essary Inbou ig fueties oF inabilty 19 obtain arate © oa silability oF sae muzttal ond Raiuteiesinetion ef power suprly Mekis in (eu od Damustes For Desay dn Canpletion «and eats stipulated ia the sigyply onder for delivery oF ihe equipments anus compietaoy st ‘oo to the soutractor shalt be deemed to be rive contract, The contracts ‘annssiow af the drawings and other requisite techaicalinonstecha‘eat data $0 that the equi case the supply is delayed beyord the stipulated time period. liquids $i per week or pari thereof subject to aasimum of $4 OF the bs excluding all taxes, duties, trnnspoittion and insurance) of the equipment, shall he recos 3.9 evdktecmined toss ess ‘zation due to delayed supply as a sum presently |, Mesos trance othe Couns atbraton or Achaea ae cai hemes be Radcewoner LicepucnaNetuant Treoeric mata feria ied #t be dae be ech oe UN ono eo eth amstances of the case withouk any ott Go SCEOUGE OF DISPATCH: we CONSIGNEE 7 eae ST Shivanigie CS wt Voiage [CT Ratio TS | SrManager, 7 Sr t | PLU. Pu. J opie | Binvamre | Chama a Seanned by Cn Scotin sry CHICATION: hc nee Meter shall eos per Spee so AC i Site fe GU ARANEER Mn Mo: CE (ES 2014, ant sult contorm to les ECUNICAL PARTICULARS: shall anes to the technieat Pans jv, He eomtetor shall supply att the G fea! spevitication of Seaie bes a5 Supplied an tender EP's of the equipment BY conptisnt a poe Hach fr Oto Thay ye iene IS per Armen EAB AIS INSPECTION CALL veel type. Fou quahnt, He fatbed 3 stein wat ws) with iil ae leetranic A\ wilalls for 3 phase fy wecuraey oF Oto 30 dys advance nti et ce HOW the supp cted and issue dispar othe for mayee eh authorization witha 20 days fren a tins Ottices notice, at the suppl nolise given by is fOr such ingpection wil ie d “iil it shall be cause “ipipatent. iy case, the in 1. oA vat vendy foe inspection and that te eve este by the purelise-cerang Ponies t's 9 fetter OF warning shal be ise ae Bae ease The Supplier shal be responsible to paver ind ie ike inspection call hes been made or the ing testing / uspection by oll He parcheee ete STAKE punceact Thit penshiy woeld bee addition t© the expe Webra tt seputing che Inspecting Oaticer. easy ou IRIS AND INSPECTION: wetwons oh lebited 10 the suppier ace ed towards SERS. 10,004 Iniietial is rejected IF each acca, vial will be chp heal subject to inspoction preseninive of the toad 4 esteaateg ee ntetEh SM ghee ail ei Ta curt eate lng eee ve divcered The Punch Porte ed ee ameH IabRTbaK ai mcks tele wpepted ne sc eh smtstied ay lsiok complete with ace Me all espe sth te pray.siogs at Save Sanh sues Natige / tininigtian welt shall be complete a KOULINE ASD ACCEPTANCE TESTS: # Acveprimce Tests shall be ¢ presence of he rey wen reyarding date of tuipection’ Teste iow SHHied Out iy pet aetevant stamhues These Tes seseutatives i the Vurehaser iil te Test Report will he ar ‘cae ahell be supplied along with tuspectian Cal) SL SIM deposit peefotnance guaraiee equal wy 10 % of the toll value of Pinch a shah aacise Duty, C'S-1, FAS Charges ete) forthe pes formance ofthe ey thee shige ot toll, within one micnth eF the issue of te ps the Haime UF Aecanant Osticen, Get 8). HPSERG.. Hansiepur, ar Rint: Ghuanege tira, eeu both fer fe Hertonia sce dlain: of extra: c ‘coe substation it was discussed that ifthe ent 8 work is done after “' Fecummendations of report by IIT Roorkee and is Not a part of the contres @ post tender development, then only the claim is Isle. It was decided th: “U Bhabanagar shall check the claim and process the same, 42.3 For the claim f dference in seope of work om M20 lo M25 for concrete Mis Siemens Lid. informed that tis is due to instucions from HPPTCL for the same and are Stpporied through offal communications. was discussed that since as per conkact, M20 grade of contract was to be used, the dim for any change in specification in grade Of concrete is juttied end after record verification PIU shall process the case accordingly. 424-For te claim of constuction of tonal taining walls Mis Siemens informed there are {wo components for this claim 1 component is the recommendation by IIT Roorkee wtich was duly approved by Engineering and 2nd component isthe retaining wall onthe West S@ (near HPPTCL Store) and in 220 kV yard, it was agreed upon inthe meeting dt & December 2014 that the same shall be execuled by other agency, tut at later stage, Siemens was asked to execute the work. It was discussed nd decided that PIU Bhabanagar shall check the claim and process the same 42.5 -For the dlsim of RR masenaory works for slope protecton it was discussed and decided that this was part of the contact and shall be deleted from the Glaim. Mis Siemens 426-For the claim of earthing behind retaining walls it was iscussed that this was part of ‘Ne coniract and shal be delete from the claim, M/s Siemens concurred, 413, Ilwas futher discussed and decided that forthe verification of measurement of items/works which are not possible at present due to itemsiworks being hidden in constructed substation, PPowen Taawsassion Powe sie Ns joint measurement/checking of measurement at random shall be done by digging or other ‘measures at several points with videography and pictures of the same, measurement committee of the level of DGM shall be formed with representative of Mis Siemens. It was further discussed and decided that arrangement for videography and photography along with digging random measurement verification shall be done by M/s Siemens at their own cost. Mis ‘Siemens agreed for the same, Issue of settlement of Bench of 66/220KV Transformer at Bhokioo substation was then discussed 5.1. HPPTCL informed that Prof. Valdikar of IIT Roorkee has submitted his report for the prevention of settlement of bench and suggested immediate driling of weep holes at the ‘bottom portion of the retaining walls where weep holes could not be provided at the ime of construction 5.2. It was further discussed and decided that M/s Siemens shall dril the weep holes in the felaining walls as recommended by IIT Roorkee at their own cost. M/s Siemens Ltd. agreed for the same. ‘The Chairperson thereafter declared the meeting closed as all the business had been transacted and the meeting ended with a vote of thanks from & tothe chai [ HPPT Mis Siemens India | Sign. {tid ‘Vikas Kapoor Et. RK. Sharma | Managing Director Er. KS. Atti, Director L(P&C) _ — Er. Kaushlesh Kapoor GM(C8D) Er. Anoop Kumar Ohiman Use Git (Project) ser | Er OF. Singh DGM (Projects) VEC KN. Sharma DGM(Contracts) Er. Vikalash Chand Sr Manager (Projects) PIU Bhabanagar_ : = Er. Devesh Sharma Dy. Manager( Projects) PIU Bhabanagar (Civil) Er, Aman Choushary St. | Manager (Contracts) [ex Sani Verma Dy, Manager (Contracts) Er. Parikshit Pal Dy. | Manager (Projects) -_ SIEMENS iA 4AL PRADESH POVIER TRANSMISSION CORPORATION LTD 7 NOMBER DATE Isazz0 x GIs S/S at Karan [E675 anar/REWORK RA.OY 0709018 .0 nardaspura Vilage MugaL.Chamnba list. cram Himachal Pradesh-176316 [ani . Desh Raj TheioriSr Manager) [tin. Me Er. KN Sharma(OGM-Contract) aoiozert_| “62053003 [SUENT RG, FC ore PAGE wei [YOUR ORDER WPPTCLICONTRACTSIKARIAN/2010.6057-62 Dated 04.03.2011 [YOUR ORDER HPPTCUCONTRACTSIKARIAN2010-7045-46 Dates 07 09.2018 DESCRIPTION QUANTITY (Oaivors RIT PRICE DISCOUNT Price % TOTALNETT PRICE ‘Ex Wons Price [Ga trae ETSTHPPTCURAR TST G51 08 OTR ‘restion Wooks recon Wer er Karan Subtaton hse eben &corererca costo 3/22NV G's (DaaisArRaITeT aac) Aedes cost of emusic or 3/2208 (Deas Annexe atache) us eS) eS) 742,728.00 ware | Pa freon 4 i cosas rexso0e | ise 135000 i ane Taptin OST 13570000 \ 4 fren ot Payment + [lone rogwssv Payment ater wrk } \completion & certified by HPPTCL_ hora. ear . j fone cree iy Fe Lath Tre Sve Those ny i i 3 Deze 5 SIEMENS LTO, GSTIN Ne, : AAACSOTOALIZ1 ee Siemens Lt (Sen TO: anehandaCategs, Opp. GME Cage, mH ‘L-Marchanda Cotage Opp HG Collage. Shins-171001 HP Ayer $0 Fegsteec Off ria Aurora Level 21 no #080, Or Amie Besant Road, Work, Bombay - 400 090. Bombay, Cava, Macrae, New Ooty, Branch Ofice Armada, Bangal ‘nol, Gard, Shop, Ghudaneswa, Crandgath, Ou, Emasur, Guat, os, Jap, Kanpur, Lcknow 9. Hycorabad (lana Madura, Negour Nathk Pain, Pe, Rajat Rourels, Sanagar Varanas! Vihakapainam Gio jon vy Circle Milt ecan sma Transmission OMISK H Power Tren om ed. anager Cham UPPTCL, Mugla PIU Chamba (1, P) s.Corp.Ltd, Transmission DMision PPICL Mugic,Chambu HP de M. (Projects) HPPTCL Chamba Zone: Distt. Chamba (HP) H.P, POWER TRANSMISSION CORPORATION LIMITED (A State Govt. Underteking) WR! No.HPPTCL/CBA/DB-20/2012-13-°2 1G Dated: ||] 2s) 10% The GM (Contracts), 0/0 Managing Dicector Barowalia's House, HPPTCL, Khalini,Shimis-2 Sub: Submission of bill for supply the ABT meters. Sir, JAI Hind Enclosed please find herewith the First & Final bill of supply the Static / Electronic ABT and OLMS complaint Category ~8 metere duly checked and verified In respect of SECURE METERS LIMITED Unit ~11 vilage Pamowala Near Haripur Road , Solan ( H.P.) PO no. HPPTCL/F-8/2016-7726-31 dated 23 Jan.2016 The necessary action in the matter may be taken accordingly. DA:-Bll in Duplicate ‘Yours faithfully, \ recat (E40. Thakur) ‘Sr. Manager (Projects) © HPPTCL, PLY. Chamba. Copy of above is forwarded to, SECURE METERS LIMITED Unit Il village Damowala Near Harpur Road , Solan {H.P.) forintormation piease : : , ((EF. D.R. Thakur) __ Sr-Manager (Projects) ol® wept, e1U chamba MITED SECURE se lg rt Yat | Avot onager 5 onumiesion Dvn os Mugig,Chomba HP ee erufus Jamdatifona ka Bulpuna| ‘sores eae ping | 00009226 ‘onrqoeaece ooo aoyo fesois ajqnog a1] panoiddt vod sy euhis Meth (Na fq (yo om Saye) CONE YL 070001499, Oorovor ras oo: ) sou y semenb r-edki ojo)” panoxidesad sy eqs GMddH ‘ONa Aq) (sxp01g om, Saye) BAIR YUN Oorooosers (Oo'00sere: 090 ) Sou » sesend 11-904] 0/9! 3 panoidde rod sy emus Md ‘ONS Aq) Gmatatt "ONS 9! oo. o0008s9 | 00 000089 000 sou z sainend AredAL ovo] z ponaidde jed sy Sinpubae ‘eve ye Koves0ge1 pape sisy | oozsioer | 00zz6109% ov0 Cr sed sapere Kiva auoyos spewoy sousroyla i pauonoues uopdusseg onus pasmeyiod sy | Pawn WHOM IAD WUIX HOF DWUISEY 'H) VEINVHO “LLSIC NI VHarVH ) I-VeaINVHO NOLLV1S €ns ONMOOd 199d AY 007 OLNVRIVH NOLLVLSENS SIO AM Ozz/EE MONS. 4YS3MOLL 9/0 NO 3NI NOISSINSNVUL 9/S AM 027 40 NOLLONYISNOD ® NVI LY NOLLVISANS SIO AW O2Z/EE JO NOLLOFINLSNOO SHL YO SWSHOS GASIASY anxeuuy “G11 NOILVYOdAOD NOISSIWSNVUL YIMOd ‘d'H 5 mauuy yi Fea ary DquDUD‘/ONN Todd yopsinig wOrssHUst el qwoug e160 & voisinig O0'svEozers “sy ‘oe0L625 ‘SpeOL6eS 0 aWwioL eve, uoneisans| ‘sae ‘unoas oo oon1se+ 000001981 000 Sid. Ay Ozeiee 18 A 6 popieme sod sy Jo} uonepouiuiocoy OF9| sayes ever voneisans Sia] g popreme sod sy | 90 29997 a on, pot ozeree 8M punone BurDUa ae erareeerre| es oozwasze. oozvessee 000 cou oneso) 2 pojeunsa sed sy somoy ye HOM uONDaIOAa| “uayenb Jo voHFaNAsve9| sais ooovoore: | 00 00000re+ ooo Seer rieien oys| 2 HH ed $e Sk WONG Uo[ss;USUO A, a 1 DaWOYSOI6NW TOldsH aH) vqweny mia ue prrdiog'suery, 194K aureyg 'e)6NWIOLddh 4” yoising uoissmuisuest ssoeuer ( age" t ) ors : ooeuey4 40 TeS68S9 Tesi) TazEEe ToNeeSES 900 HOS TT PPV oszasos $29595 TOR FeIBUI SUIDaTI IO HOS TE PPVIE $29595 ‘wone/eiSUrISBSM 70) KOS ZT PPV |Z SINT ‘008757 e101 Tong a ‘oo0sesy wos | core | osz ‘Wwedkijssves eave yung] he 304 se ssayenb jenuapises yo uoHIn21SU0D| qunouuy] nl area] A way jo wonduasea] ONS ANOZZ/EE TDddlt 40 Saakojdw9 ay) 104 AUojO3 [ennUapISa: jo UONINASUOD 104 aLeWIISy ALeUIUFaId:~OM auN Jo aLEN, equidiy sia ur ueDey 1e UONeSGNS 1509 40 ID vuLsaY SF gH DqUIDYD'OIGNN TOldaH AC UOISeIUSUONL quipug ‘e161. BY vossing vorssnusu. sebeuew AC - ave my ) equeys Mid [oosvers Ta10]| joosbert soHreyD UORe|esa 8900 KOSOT PPV ‘oo0ovee 00#2e Tome HEIST SuIIa|I 10) HOS eI PPV|E ‘oooree Toneyfersur SEM 104 HOS'TT PPY|Z ‘se01N5| oooz6cs [__=1e204| wonoa Buipiina| ‘ooozezs| ws | corer | oze ‘adhi)s0303} eave yyuiid amd Jad se ssayend yuromy] wun ane RO] ‘ONS| 32 vonesqns my0zZ/EE TOLdaH 40 saaAojduto aun 40} AUojOD Ie equiey> sa Japisai Jo uonanaysuOD Jo} aLewinsy AAeUILUN|aLg' AON AUN JO WEN | ree 1509 40 DvuISeY £2 gy pqweud'orA TOLdH LOSING WOISSHUISUO!L sabeupyy ety SC aE9009S To (888862 SaHimp uoneTe2s0 and OTST PHY] osztvav sctvey Toe HeIsUI DAIL 104 HOS TT PPV sctvey 1 ISESM 705 OS'CT PPV| =m FaDIAI9G Oovezae =m] wojvog Supra eee ‘oovecae tubs | oorer | vie TN adhy)sares ease yuyd ama 190 se| Tammy] wala] On| SquveU “HsIO wy UeUTEN We UORESITS MOTTE TOLdaH Jo saakojdua ayn 40) Auojo> enuaprsas yo uON2NNSUOD JO} 2.ewIsY ALOUILFaAI HOM 24 JO WEN, 1509 30 VUISOY BE @'H OQWDYD'OIGNN TOlddH prydioy'sin WoRING Uo!ssISUD A =a mene O seu) ‘yoIsinig voisstts noone [vreseee [veSOOET OSLaT6z SZBT6L SZET6L ‘DOOSEES =e101 | ‘000s ws oorsr Ose eave yunid anid sad se ssauen Tunowy| wan| ae | wait jo vonduaseq] ‘ON5| equeyd isIG uy UeTey Ie UORESGnS 9022/€€ 1OLddl Jo saaAojduua ay 40} Avojo> jenuapisas Jo woHIN.ISUOI 40} axeWs; AseUIUN|a44:>H0N BYR Jo 2WEN 150330 DvuISev us cro fesse | ecsine |. see | sooo] seat , es fur op wig ccooes | ovo | sastane | antssror | cero v9] aes Sapeaien een t sewn yo pearsu seq] EO" 7BEOL TTPO soso eprRiez] sy'oEe ay] z Sere iota eine cewsor | orzvocer | reoeceer | coves 1 wg ' eel : = abr aT : Twniavwnase | ronvmy wey Rare aa suv] souiviasa cout annonev as uo us sau 40 Nouaraassa ovs (aH) equeya neg tequiey Ald PUN GuspHNG S15 IEF Noe) HELEN ye KaopEAOqEI BuHSa) WN duse pat Jo wondnsysuo9 20} 40M JO PALAY-"MYOM AO TINVN, bE INGWALV LS NOLLVIATG (Guprer spun -yno9 93695 v) NOILVYOdOD NOISSINSNVUL Y3MOd HSAGWd IWHOVINIH over oro ooze oe cri] son usorces | oR 001z97 owt oz} eet wn ozove oo0681 arssi] sessi] us| wwessre ac usee oorest crows! | ucrer | ws o9'699 ovrowsi | cre] us Os pu Sapis uh iow 9 wezvoor weoizorl SY SszoR wate wees! os| pes Senate PD ju pu sans ¢ prose iperee oossee ove eeouz| — svoi] us| sozst oe z9es os ose oot] yea] reo wrses eo s008 ower croc] eter ocr e098 or oars, one ore] 9 wh peeice esocget or ezooe sett] cess ide Jo uid sad. pu 1980 3S UDND UE osucse | opuzezor 9sonce6 one lore] 99'89] us| 9 (yun gz) sonny jo sane, ‘uo su30u94 258) ure spueg $8019, ovssior | Leoizee urscoue S602 oxo] ott] bs] Shum Susann ad 00% py SSH patiog yaoyg Jo 2109 “> I ecco oF 110901 oo sore scl Habs tony 98008 24m uprscual ow 227024 ovsiee | seoxoane svoueore owrcous svis| us| et -auyoo oorverer ovo ooo} ozee ¥z ssuyoos} 10} assnn jo ulsap| seroore | oLsoaere ce TeOOOT 6 zt6 uwosz| 9st ‘ug 380009 2 auyoo) so bs yo usisop zricect | coereez ‘ox ons scor] ost] sw ‘ay sa8ueyp on sworzocr | scxecces LELooIE Do L666 scus] zy] ze t0562 zs6uty weReclL ‘L608 oozoi] oo'ret soypuey seq pays xo sor wuseee presoee acres ozs] one] 3 (cago arydiuoa a19 swans yun] & nF 1489 Suny pur Fuprrodg| san joaquin 3 ane 4 ki a eek ox'son61 | 09 t68eL os zeae so 167 cost] ogi] wea x soasnerog eete i oe isss! ooze] oor] ea jz Giz] sn sotuew> on} ae vrez ooo ooreet oovee q of soni nos on gone onsort 0 662 q sn oo'snts onrosts ores fl son "S805. st 0 sc667 Doswos 3} s| ve on 0068 g s[ sen sone ‘00 0065 0 0068 g s[__ sn] | srqyng sagqms pur saul] gg oo ses9e s| s| sn re 000 oo0e6r ooost6r A s| sent ee su 783906 pouses col v6 son -sato pur syoou] ZE fag Buy pur Surprrosl (ayonb pasoude oooiesz oo vacee rr oc] NI yduuoo sna swas2s Azvssooou yin) HE pur 50] pu yp] 201019 sseiq poustuyy aa Huy pe Surpracsl apeus pau oeweee e619 eeusel wus aytni| sever] wbs| ied Romesspmear opens ums om auld enon oc sumsoynuus pur puesg poroudde jo med xtusspeas -suyoo} so asa yo 09 ovzore oosestz ov e8061 oor] acts} sit 6 ‘nose E sees] ap unui og ured and Busy puw Suypracsa| ES onocece | 9) stung up ug (00 060° oree| oc] say ap anu sodid 3 pur odds and aunssaud yi ‘ovosze ‘ors 4 “| weal ss over ol olf we vs «| cz. &s oorens9z oo ensor oo'1988 q s] weg] (soni zs ‘Qo 1)syuE afes01s seven ZurNy pur Buyprso4d| wo oases oo'seas oorst ze ze] woes suowun] 1s sseiq ts uoninouuos and Bunny pure pupyrorg| st © pe on'spss 00's 5 s| wes Te eK pees ou surat RS ooorser of ze] wor * uy Buse9 10 Aa ye ajdue sseae Auyny pu Tuspisenal © oossver | 000 oosor oooseri olf wea nus )peay wesdea| gy ¥ \dsseq 9) oor0ese oozrsor 022081 osost 4 zl weal u ): dy aug ss 000 oorsere oorseve vos s s| wr ag a!) furig pue Supraoig| OF 00 00 ores ooosee 3} 9] yeea| engal| SP Lseig a2 ane ap dos “a9 Bunny uw Suupsro4g| c oot i 0s em 000 wo w'st9r ost w s| s] a] po soc ond pa sania AT 969 000964 4 s| wed sow 98p9] gy poyraaag wos XuNt9g9 BUY o wo over ooverr oon s| s| weal (wuipexemnsa)] cr ue Buiprnou oo ore 00 08 oo 0r9z a vif eera| iP ‘oo o0se s| s[ wes ig xwwwoLT 4) 3 Ovs8Le bo 5 s| en 06x tart) equeus BIG ‘auoz eqweyD 1OAddH (spoford) At @'H OqWDYD DION TOiddH UO; HIG UOISSIWSUDR pr (qa) equreyp nia “prrdiog’suziy omega H uewsigneiq peayy 9419. FS aweyo eiGNW"IO1ddh & yoswig uoissiusues, Sr Naw OF SP OOEIRS NOLLVIAAG TVLOL saveaesre| eocavsox | rezzotosr | otzissior wi0L ovrorzoz avez ovo w'ssoe 8 of es 9 _| sry | srini9 ovo exerci s of wea 1 teu anor yioows paraded pues sioneu conus ish ovo v0] tubs |e pue sevarew asooirsnp ‘oop sevou wos] ¢9 391 a2epne aya Buyysnag AYBNONA ye Dens eeess or tess oo vo zon] tbs 2 =swayt ea wo wo 1 ‘or 00081 oo 00051 1 i ees io mea pov 019 oo tss0t ssa oo v0ees onissrt s of weal aun pure Suprsoial ovo oaosez ovoosez ec os wo wo 09H wore osi9 | +e as (ee) 000 oro, zt ‘wsozt s| s|__ weal ‘yp unue| 46 POWER TRANSMISSION CORPORATION LIMITED (Stato Govornmant Undertaking) Rog, Olfco: inle Bhan Tut Pooja Shen 5 " (CIN):U491011IP20085GC030050 é / vppret Pl: 0177-2831400, Fax. 0177-2032384 Wob: WWW hpptel com ne NoHPPTCL/DGN Projocto! 12017- 4/45 ee Datodl- happy Ho f WES. “upp why Tho Dy.General Managor, HPPTCL,Chamba Subject- Estimate for construction of flold Camp cum Testing Laboratory at arian under HPPTCL PIU Chamba. Ref- Your letter No. BGM/Chamba/Camp-1 dated 2.08.2017 gir, In this connection, | have been directed to convey the approval for Hloating the tender against the subject cited work, however the award be placed only alter approval of the revised scheme in corporating the above work, _e__ Thanking you. Yours faithfully, Dns) 5 pee ad eae HPPTCL, Shimia-S Scanned by CamSeanser HP Power Transmission Corporation Ltd. (A State Govt. Undertaking) Regd. Office: Himfedshawan, New ISBT Road,Panjari, Shimla-171005 PPTL Ph 0177-2631263, 2831284 FAX-017-2831284 Webs vow hpgte!com (cin): uao1014P200856c030950 Office Order In exercise of the powers vested in me vide serial number 9.1 2(b) of Delegation of Financial Powers 2012, approval for (+) 14.60 % variation of overall value of the contract against the award amounting to Rs 40,15,672/- vide DGM (Projects), Chamba Zone, Letter No. HPPTCL/DGM/DB-7/2017-753-61, Dated-29/09/2018, for the work of ‘Construction of Field Camp cum Testing Laboratory at 33/229 kV Substation at Karian above 33 kV GIS Building’, is hereby accorded, vine Bebe ice) - o Jarret stim, NomPPrcL/Projf-3872018-19- PKS 7 ~ 96° pares: 0 /y/p, ‘ce: 1. P.S to The Managing Director, Himfed Bhawan, HPPTCL Shimla-05. 2. P.S to The Director (P&C), Himfed Bhawan, HPPTCL Shimla-05. 3. The General Manager (Projects), Himfed Bhawan, HPPTCL Shimla-05. 4. The General Manager (C&D), Himfed Bhawan, HPPTCL Shimla-05. 5. The Deputy General Manager (Projects), Himfed Bhawan, HPPTCL Shimla-05. 6. The Deputy General Manager (Contracts), Himfed Bhawan, HPPTCL Shimla-05 to issue necessary amendment in the award. we Deputy General Manager (Finance), Himfed Bhawan, HPPTCL Shimla-05, 8. The Deputy General Manager (Projects), HPPTCL Chamba Zone, Distt-Chamba, 9. The Senior Manager (Projects), HPPTCL. PIU-Chamba 10. Sh. Subhash Kumar, Govt. Contractor, R/O Village Durgethi, Tehsil Bharmaur, Distt, Chamba(H.P.) \¢ HPPTCL,Shimla, é vireG hoje 41 if as H.P. POWER TRANSMISSION CORPORATION LTD. REVISED SCHEME FOR THE CONSTRUCTION OF 33/220 KV GIS SUBSTATION AT KARIAN & CONSTRUCTION OF 220 KV SIC TRANSMISSION LINE ON D/C TOWER. FROM 33/220 KV GIS SUBSTATION KARIANTO 400 KV PGCIL POOLING. ‘SUB STATION CHAMERALI( RAJERA JIN DISTT. CHAMBA (H.P.) Providing Protection work at Tower Location No.2,2,8,78.3.12.1719| SR seo Deseo pa ee Ditterence | Remarks Providing protection work to 220 KV S/C Teansmission line lon O/C Toner from 33/220 Ky Gi substation Karin to 400 * Jv pccit peoing substation Chamero (Rajra)in Ost. am eae gi Pesce: [Chamba Tower No.2) Providing protecion work to 380 KV S/C Transmission ine 2 |" 0/CTower from 33/220 KV GIS substation Karan to 400 nt Sates 068 | acto V PGCIL pooling substation Chamerail(Raler} in Dist [cramba. Tower No.3), Providing protection work to 220 KV SC Transmission ine lon D/C Tower trom 33/220 KV GS substation Karan to 400, > fev PGC pootng substation Chamera-i(Rajera} in Ost. oe ea | cae [chamba.( Tower Ho.7), Providing protection work t9 220 KVS/C Transmission ine lon D/C Tower trom 33/220 HV GS substation Karan to 400, * lev pect pooting substation Chamera-i( Rajera}in Dist. one Pe eee {cramba.( Tower No.8) ding protection work to 220 KV S/C Transmission Tne lon 0/¢ Tower trom 33/220 Kv GIS substation Karin 1 400 5934 3934.00 © Tev Pci pooing substtien Chamero Rajera} in Dist ae ee ae chomba. Tower No.8) Providing protection work 220 RV SIC Transmision ine ln o/c Tower trom 33/220 KV Gs substation Karan to 400, a ea © ev ect pooting substation Chamero aera} in Dist Bs ee eo {Chamba (Tower No. 12) Providing protection work to 220 S/C Transmission ine lon D/C Tower trom 33/220 KV GS substation Karan to 400, 7 025 9625.00 kv Pci pootng substation Chamera Roe) in Ost. ad seeiee |e [Chamba Tower No.7), = Providing protection work to 220 KV S/C Transmission ine 5. om 0/C Tower from 33/220 KV Gis substation Karan to 400 “ebb: ienarllpagens kv Pct pooling substation Chamero (Rajera) in Dist |Cuamba Tower No, 19) Providing protection werk to 220 KV5/C Transmission ine |. . feno%c rower from 33/220 Kv Gis substation Kain 0 400 | | © Jawecct peoting substation Chamero (Rajera) in st a ence) | (aaaennD Chamba, Tower Wo, 8) | | yorat ° sese7e2 sassree nager Trengmission OMION ¥ — Circief ead Braughtsman Sie (Projects) 4PPTCL, Mugla, Cham" H.PPower Trans.Corp.Ltd- smission Division HPPTCL Chamba Zone PIU Chamba (H.P) Distt. Chamba (1.2) HPPICL Mugia, Chamba H.P Sb aH oquioys orn TOlddHt Uvorsin UOIssiuIstHL oe ~yrieay TaeL, oeezte wwout | oor | uno ve ooise 1weeot | sez | uno tyem Burweyes puryoa Bumy aU01s yom Buruieyas ut (pues| 9 wowed | )¢:1 s2uOW wuaur99 ut | 921 euLON ws lesezese weesse | 90z98 | wna | — z1 pues givawen |) Z1-9:1 duce aww yu do ¢ lowe vontepunoy w Ayjenb proidde jo 2uois prey wan (Sas.n09 0} 14609 pesinooun } Aieuosew ojagru yeu0Bsjod) Aeuosew ayaa woPUed| ‘Hom uno) Jo y809 BuprygXa ajaydwwea BUND es ze089 so9are | zve | uno | uonepunoy w Buuonnys pue Busua® jo 809 BuIpNoKe ’ nu o be om pepe pure ¢MeUD® |) 94 mu wats Ya ‘sem se yans Seoepns jeN9A Ul LH GROEKOE aUNe, UI UO ou'e08 wrizz | 00% | 4S | aoue yum papiem youn wl Se sme aoI8 UA HOM NO} HuprADiA © ‘suoneayoods ‘G'Md dH 394 se wus 006| tung | ©1084 Ost 29 Aensn yous wind Jo 22 oun He oe ee og raeae Ora 101809 Burpnioxa ayojduioo Buuno pwnd ‘ ‘r B6e auois popes6 01 pues g wawaD ue ‘yoBe 405 YOM raduing” ld Ut si Es Aare. Be ad ‘02,0 peat & 0} dn ques payeneoxe jo jesedsip pue Hom wiies urBuND) | (gu )iunonry wy [ao | aun ‘pomp won ie sequen nig Dud span que) AOU! (eke) sAUND HORESAN AaoOs uopexsens 51 Ax oat wo smo, 3/049 Du UOISIUSUE 3/5 ANOLE CHEM HoK>nONg Dapnord TON waMOT NAME OF WORK :- Estimate for providing, Protection work to 220 KV SIC Transmission arian to 400 KV PGCIL pooling sustation Chameract( Raja ) in Distt. Chamba under HPPTCL PIU Chamba. ‘on DIC Tower from 35/220 KV GIS substation . = TOWER NOS ea tom tor vot | ary | rates | Amount tn ney Cuting in earth work and oisposal of excavated earth up to aed of 20), a = 1 rns in Pick Jumper work 50% each. pane as lpn. Cement cone, 1:6 (1 cement 3 gand 6 graded stone agg 40 rm 2 |rominal size) excluding cost of centing and shuttering in oundation | cum | 2.005 | 700» 20008 and plinth & curing complete excluding cost of frm work Random Rubble masonary /pelygonalubble masonary (uncoursed founda 3 eam | 52.027 | ses anstoas “Z| Sone fing behind rainng wal ~| am Sar | wer 5 done wih the excavated sot ——«; eu | 40.00 I Total 246189 we Sows, , A phok L he Dy. Marrager Manager Transmission Dwision Transmission Division HPPTCL, Mugla, Cham HPPICL Mugla, Chamba HP @H OQUOYD Of6nH IOLadH ORG uossjuisu ~~ easozb __ [eer fo asa) as aie oe (haresedos pred pue pemseaus ag 01 saeio ayy ) aun aun isuiebe| 7 £028 | 8D | soe} no venbs unm siopynog uM ony 21M 19 30 apew SOeLD oxyn | © ‘YsOU WO SL uD ¢) pue SM | yo eI LW» uum 1 ssc vec |seveze| wos ed9s pled pue pamnseeu 94 0} Buny siopinog ) aun au yuseBe| z no eyenbs Lum SiepHog UMAR BHM 11 Jo BpeUs S9eLD tak i ins {269 %408 WOM JaduiNr Pig eh (02 19 peat & or cn yes poreneoxa > esodsip pue yom yueo ut Bunn} (4 wepuny sory | 0 | wun vom p wen eo ON HEMOL "PAWEND Nid TOLddH opUN equIeYD "HSIG Ut ( EJefeY )reI9WEYD UOREISGNS Bullood Hd Ay OOF O1 UELIES UORFISAINS SID AN OZZIEE WOH} J0MOJ D/A YO OU YOISsIWISUELL DIS AM OZZ-O1 >/0MUONDIO1d BUIpIAOLM 405 B}EWE -: YON 4O 3WYN br NAME OF WORK : Estimate for providing Protection work to 220 KV SIC Transmission line on DIC Tower from 32/220 KV GIS substation arian to 490 KV PGCIL pooling substation Chamera-l ( Rajera )in Distt. Chamba under HPPTCL PIU Chamba, 4 _____ Tower nos. oh on hem of work vow | ay | Rates amount in Rs.) Cutting in earth work and disposal of excavated earth up to a lead of 20, * lms in Pick Jumper work 50% each cn ees eee ees Pi. Cement cone. 1:3:6 (1 cement 3 sand 6 graded stone agg 40 mm 2 nominal size) excluding cost of certting and shuttering in foundation | cum | 2.805 | 7486 65 2100.05 land plinth & curing complete excluding cost of form werk cum | 51.852 | 3999.26 207057.48, cum | 1965 | 1003.71 21491.40 I'be done with the excavated sol cum | 8.00 | 17947 1495.76 releze Total | 253565 Transmission Division HPPICL Mugio, Chamba H,p aH DQWOUS ‘O/B TkddHt (ae) eaueng pig UOBING uo;sspUsUDN, OYSURAL OMOdT sf upg Dept apm on al A aay ean 7 me [ ‘YE6C09 “| - OL 2 : i: oveiz | trout | ooor | wno Ts povenaaxo 9g am 0G 8 WES aA FO BUN EG)_Z sr stor weer | ese | uno 01 punoa Bunty 20015 | 9 em Bu ames 35 ou noe (2 eb re = 4971605" veeese | 616ZH1 | uno 2 pues 190 Yum dn Buyjoray In UNG) G pue uonepur ojo yo ais prey wv (598,909 01 6A pasinooun ) Aeuoseui ajqqn) jeuo6Aod; Kreuosew araarey wopueD| HOM unos jo 1800 Burpnyaea ayaiduico Buuno ~ quad PuE| e696L1L goers | 656 | wm | onepunoy u Buvennys puE BupIUaD jo yS00 BuIpnIDx® (e218 jeNWOL] y uns Op B6e euo1s papes6 g pues EwawaD |) 9:1 V0 WeWED Val ‘sem se Janes ieowven ui wau exoex0E Ouse Ut Los weezut wrize | 092 | MS | ope yu pore Youn ws SI Stet 90 wm OM wos BuPHOHd, 2 tung | WM ORL 29 Aes oo'e0sse acess | os Satie z ‘Fe auojs papas6 OL pues § MoUleD 1) OL''L 9409 WOUND Td ne 4989 99 WOM soduin” 9o1d us borsae svesz | 92 02 peat e 0 dn quee poyeneaxe j esodsip pue om ques ui Bunn} + sun yronouy | ssi yom ou xs. TON BaMOL -eqweyg nid Todd J9pun equeYD “HsIG UI (eiofea)revoWeYD UoREYEANS Buljood TOHd AM OD¥ OF WELL uopersans S19 101 O2ZIEe oH} 39m0] 34G UO OUI UOISSLUSUEAI OIE AM OZZ OL HOM UOHTOSIOAd BUIHAO¥d 40) LEWIN ~: HHOM 40 WYN NAME OF WORK :-Estimate for providing Protection work to 220 KV SIC Transmission line on DIC Tower from 331220 KV. Koran to abe KV PGCIL pooling substation Chameradt(Rajer )in Distt Chamba under HPPTCL. PIU Chamba. Gis substation . - eH om of work unt | ary | tee Amount (in) 1 Imtrs in Pick Jumper work 50% each, = zi 200.16 cores ~ paceponom ae cemmaaonamsamm i | | se | mss] ser i ea E [tow | vas | i y es diac ansmresion DMSION 9 er abe CLP) Transmission DVSON t HPPTCL Mugia, Chamba H “PT CL, Mugla, Char er yawns enn scan rH) PqUIeUD Ald AWEYD “PION IDL ce # vorsing uorsswisue, oIstWg Uo[ssjtuSUD A, SYBAL 29M0dT H oe au fa reo oa - cs Beauyy SAW OF O| tuna | ¥84i 8891 JOU Ing ssoUn}HN Aue WM UI UH Om D4 10} U9IED:O}UIO eres coe, 1B Yom wo} jo 1809 Burpnioxa aajdwoo Buuno ® (azis feuwou wus) * Sm. (0 “B6e euots » pues z 1vEWIAD 1)p ZL 2U0D koUNDD BUKET ¥ AOI, (19015 301) an) omy s00y 0} dn ayaydusoo Bizoe|d ur BuIDe|A pu BuIpLIG 6 ewes ip | 8 vee ‘Suypuag 97 ¥H0M DDy} 10} WoUNsa.0 UNE F29}S 104 | /29IS PHY AIS] © y6'90021 Le6or | e601 | uno rem Bu1re}os purjoq Sumy avers |S rem Sunreros w (pues| ‘9 1uoW99 | 6:1 seOM oad Us| 9716 eUNUOU WH 92 Jo BBE auors 98 ¥0L92 veesee | seer | wno | zi pues gaan 1) zi'9:1 2u09 19uwWeD yum dn GuMora! 9” YUNd) » [pue uonepund} w Ajenb prox 124 um (5953009 01 14BN0.9] pesuncoun ) AeuoseU 2/qqN4 jeuD6Ajod) Kseuosew! a}gqny wopued| 20M uno} o 1800 Burpy» or'tszat sgarz | 1gz | uno | vonepunoy u Buvennys pue usnus9 je s uuu Oy 652 auoys papes6 9 pues ¢ EF v0 WIKHED Val a ‘Sem se yons s20epNs jeNsan UI WL gxOEXOE BwIeH LI VOM Se eees PPUZ | O0¥L | WPS | reve yum poprom youn aw Se SOI JS MHA HOM UO} ButpADIG] ns {peo 05 Wom sodune"¥o1g ut Sau ee aere) pie |S Bet (02 10 peay & 01 dn yes pajeneaxo jo jesodsip pue wom yueo ut Sunng| + ho | wn Yom 0 won Rl ‘sa uiywunour| au % FONUSMOL ‘eqWEtD Nid TOLddH s9PUN eqWeYD "SIG UI ( B19Key )J-e:0UIeYD ONEYSAns BuyoOd 719d Ay OOP 01 UELEY * oneisans S19 AW OZZ/CE WOH JoMOL 97 UO 9UN| UOISSIUISUED] O75 AM OZZ OI>HHOM LONIM}O44 BuIprAoId 10} BYeUIN'SA ~ HOM 40 SWIYN NAME OF WORK :- Estimate for providing Protection work to 220 KV SIC Transmission line on DIC Tower from 33/220 KV GIS substation Karian to 400 KV PGCIL pooling substation Chameraut( Rajera ) in Distt. Chamba under HPPTCL. PIU Chamba, e TOWER NO.17. - [Rat JAmount (im ¥ tom of work Usit | ay Cuttng in earth work and disposal of excavated earth upto alead of 20| 7 ts in Pick Jumper work 50% each pie | Sees cease eS 2. [Providing form work wih sce plates 315mm thick welded with angle | so, | on 33 | 27a eae ron in frame 20x30x5 mm in vertical surfaces such as walls, JPA. Cement cone. 1:3:6 (1 cement 3 ¢ané 6 graded stone agg 40 mm 3 nominal size) excluding cost of centring and shuttering in foundation | cum | 8.5 | 7486.68 69636.53 Jand plinth & curing complete excluding cost of form work Random Rubble masonary /polygonal brought to courses) with hard stone of approvd 4 [tion cum | 48.4 | 390324 193272.82 [stone agg of 20 mm nominal size ) in cement mortar 1:5( 1 cern |_|sanc in i om 5 | Stone filing behind cetaining wall eum | 17.2 | 109974 10811.81 Prov Mild stee! / Tor steet reinforcement for RCC work ic bending 8 [binding and placing in placing complete up to floor two le ay | eTASE- 7 = B58. * Dip Pro & Laying coment ok att dena Pend eo ya.cima conmplsElctaig coccriom mes © | > e >t RCC work in in wail any thickness but not less than 28) om poe a a Teta am aaa : oe: alae J pees A alnk Ao ; DY. Manager ger Transmission Division transmission Division MPPTCL, Mugla, Cham HPPICL Mugla. Chamba HP gy pquous‘oiOnn Todd cap eaweud ald uesL OMOgaH, uojsia UORSIUS LON, c ON OPN ~_veeanr reel tung | UeUr 80 10u Inq ssauyoR Aue yen UU YAM 90310), Teeny Se soees EEh BOM LLIOy JO 1809 Buypnjax3 s}ajdW0s BUND y 02 880 ouo}s y pues z OWRD i)r.Z's“Au00 WuOWeD Bake 9 Aol (018201. ona am s004 0 dn ayo Bua w Buse pu Bispud 6 pete ee “Bujouad oy! Om JOH 10) WAUIeDIO}UIB: 81S 101 / AIS pI AOI) & avait weesor | weer | uno zvoevn | reese | zee | uno Le ___[P pasinooun) kaevoseuoigan ested Aeuoseu agar OPUS yon un6} 0 1800 Bupnjee eyau100 Bun ¥ yur pu zo.t0ais so9ere | z69 | wo | wonepunoy w Buvounus pue Buuniea jo seo Buypnpxa (22 euNNoU} E {nop 85@ avers papes6 9 pues cwowea 1 ) 9} 1 2109 wRsIeg “Val }- = 3 ss ae eres ie Fr ‘jen se Yons seoejns oan un sxOPAOE awe HOH Gk Prey eee PS | ayBue ya papiam youn unw GL'e saLeld joa}s A ysOM LO} BUIPIROsE| @ fi 490 05 om Jodune yee par SER ee 02 10 peat & 01 dn ques peveneoxe jo yesodsIp pue 10M yueD UF Bun] + [____ eum nnouy] vey) “| sae ws| TON WSMOL *eqWeyd Mid TO.ddH 4opuN equeys ‘siG UI | e1ofeg) -ex0WEYD UOREISANS BuoOd 190d AY ODP Or MELE N WO|SSHUSUELL 1S AM 02z OF HOM ONDIOId BuIpInosd 304 BYEWRS~* AION 40 AYN UOREISGNS SID AM O2Z/EE WOM} J9MOL O70 UO {Bes 5 TRTRS THT FB WOUND BAT ns BURST BAPE] osrecon | ov0s0s_| eoue | uno | me ove vonennos u Anendpononcee avis nem psnnhuozeu. aa prenbs| 7 ; ‘a pas VahepUO URI io jo 102 BOE) yao Ouro pu (25 eutuou wa Oz a1bosB6e 200 e onoza | ooo | voi _| wre __auns papers pues 2 woule> 1)» Z1 1ave0 paweD Bu i aid pu waepUNO: UHH uo} 0 1800 au Burana ajyoa Buu pue (a7 euRuoU ww OF 60068 |Z oxiecr | ovsecr | zvor | wro ucts popesé OL pues $12 Buia U8 Bubrose pron se eo “a sake a sors wud ou paunbas aur ioe uD gi vos poe ay Guan Lai pueuoneneoxo | uy a6pe au uo} Jeop eeu g ou jouyoe pojenaxe a8 usp ariseoz_| cove | coo | uno nau 96" ordh in womaues 30 sycven voyepUno, vs voneAEDr3 ee ‘SuNLOMaLSENS) = (-su usyrunoury) ur) sea a popieny| . wopenosou aye sorey “xb _ [una Sar 30 NOUAROSIG ows | pia NAGNA NVISVH IV NOVIS BMS AW OzZIEC IY ALRINDIS HOd NOMVGOWOOOV JO NOLLONYISNOO : WHOM 30 SYN NOILVILOD3N Wad Sv G3GHVMV S3LVE (Guryer sopun rx09 21615 ¥) NOLLYHOdHOD NOISSINSNVEL USMOd HS3QVYd WHOWWIH go “opi GD OE JOIN HIER PUR SIOOH ul BYFO1G pu SARIS Jo Sabo] os poyoweus smopusn 21007 20) WW 1 1 OHM HI ersoer | oovese | woe | uve ane ann Sn PasueN® Bush sinus 06 Pre > Poa JEpOOP ‘ped 2q 0) wey) oyu a9 sroe8 Uo yum owe 1 " eszeroa_| oovzrr | eosi | ubs i eee ove ponoued 0 pazesporoued au Oy Suny pu a Teas papes6 9: pues ¢: wowed 1) a1 WS 1 6uipagiv pue S846 uopoon pve sn & cosy | 0085 | coz | ow aie 0 By Buspnpus 6401 wD Op 88, OU UO! 14 UY € 0» OUDINOA ‘oi epoap S50p 10) UOHSON U pany pve pau orzoeco_| ovorercs | is0_| ube "aopuon’ f\s009"emopdm 000 sus 2 wwrezrer | OO svet | 16z6 | ro tr ‘ons060 —| “000051 | Lzy | wre or 10 51v004 4 6 orseie | 00601 | 968 | uno aon spung etvon sore au w Anu pores pues hp Buns ep : ypvea Bupnon |——| cosisce | 0059 | oveves |_o ojos peu Gupnoud|& in oF enyveS Pu suounssenq S996 se90 SoU: U WOM slazUDD paDO;Ne! WED} ‘ue WOW 0} 30109 BUBrDK®) 2 reuwou wig a16,66e avers pape 2: ovsazea | coves || ocr | wre 21 }a.uo> oweo Ouke pe Bun Spr sop PunDNS THURS S Tae TTS DR wat O} ny pue voyepuno, ut ou BupIna Ap ua voUnoD Bsn yom OVE] 9 eousis | oooses | zoxz | wo aunuonuuswaans

You might also like