You are on page 1of 4

PEMERIKSAAN PERALATAN CRANE / BOOM TRUCK

Nama Operator :
Departemen :
Hari/Tanggal :
Lokasi Kerja :
CONDITION
ITEM DESCRIPTION GOOD
1 Lower Boom
2 Top Boom
3 Boom Chord
4 Pulley Hoist main + Pin
5 Pulley Hoist Aux + Pin
6 Wire Pendant
7 Wire Derick
8 Pulley Derick
9 Boom foot pin
10 Boom section upper poin or tip
11 Boom section lower base or buttom
12 Boom point sheave assembly or heam Boom
13 Gantry / Pijakan
14 Inner boom 3 meter 1 Ea
15 Inner boom 6 meter 1 Ea
16 Inner boom 9 meter 1 Ea
17 Inner boom 15 meter 1 Ea
18 Top Boom 6 Meter
19 Base boom 7.5 Meter
20 Hook Block 60 Ton
21 Hook Auxilary block 6 ton
22 Anty two block
23 Cable Anty two Block
24 Main Block
25 Auxilary block
26 Counter Weight 7.5 Ton 2 Ea
27 Counter Weight 18.5 Ton 1 Ea
28 Counter Weight 25 Ton 1 ea
29 Engine Safety shudwon
30 Spark Arrestor
31 Fire extunguiser
32 First aid kit
33 Safety Belt Operatore
34 Rotary Light
35 Traffic Cone
36 Sling for Lifting
37 Shackle
38 Engine Crane
39 Engine Prime mover
40 Engine safety shut down
41 Spark Arrestor
42 Win shield Glasses
43 Cabin Operator
44 Cable extension wire rope boom
45 Cable extension wire anty two block
46 Out Rigger jack front LH/RH
47 Out Rigger jack rear LH/RH
48 Hydrulic pump
49 PTO (Power Take Off)
50 Stop mast boom
51 Boom Stopper RH / LH
52 Main hoist rope or load line (1-1/8"x32"x 9 IWRC Dyporm)
53 Aux hoist rope or load line (1-1/8"x32"x 9 IWRC Dyporm)
54 Over haul Ball
55 Ring post or Center
56 Swing circle assembly
57 Load monitor indicator
58 Angle Alarm
59 Main Drum + Brake system
60 Auxiliarydrum + Brake system
61 Cabin operator Crane & Driver
62 Electric system
No : FM-SDJ-SHE-045
Tgl Terbit : 03 Maret 2016
NE / BOOM TRUCK
Revisi : 00
Halaman : 1 dari 1

Shift (Siang/Malam) :
Nomor Unit :
Hours Meter Awal :
Hours Meter Akhir :
NDITION
FAIR POOR STATUS

You might also like