You are on page 1of 6
JABATAN KEMAJUAN MASYARAKAT (KEMAS) PERSEKUTUAN NEGERI SABAH KEMENTERIAN PEMBANGUNAN LUAR BANDAR Aras 5, Blok A, Kompleks Pentadbiran Kerajaan Persekutuan Sabah, Jalan UMS Sulaman - Likas, Peti Surat No.23, Telefon : 088 488407/408/409/410 88400 Kota Kinabalu, Sabah, Faks : 088-488411 Rujukan : KEMAS SBH 200-06/01 Jid. 8 (55 ) Tarikh =: 23 OGOS 2021 14 MUHARRAM 1443H KERAJAAN MALAYSIA KEMENTERIAN PEMBANGUNAN LUAR BANDAR SURAT TAWARAN Kepada: TEKAD MAJU ENTERPRISE No. 26-1, Lot 61, Block C, 1st. Floor Lorong Plaza Kingfisher 3, Plaza Kingfisher Kuala Inanam, 88450 Kota Kinabalu SABAH Tuan, KERJA-KERJA__MENAIK__TARAF _BANGUNAN _JABATAN _KEMAJUAN MASYARAKAT (KEMAS) NEGERI SABAH DI TABIKA KEMAS KG. KOPUNGIT, KOTA KINABALU Dengan ini adalah diberitahu bahawa sebutharga tuan bagi kerja-kerja tersebut di atas berharga RINGGIT MALAYSIA: SEMBILAN BELAS RIBU LIMA RATUS DUA BELAS SAHAJA, RM19,512.00 disetujuterima, tertakluk kepada had dan syarat- syarat dalam sebutharga ini. 2. Tarikh milik tapak bina, ialah pada 27 OGOS 2021. Kerja-kerja hendaklah siap dalam masa LIMA MINGGU (5) iaitu sebelum atau pada 30 SEPTEMBER 2021. Sebelum kerja dapat dimulakan, tuan / puan hendaklah berhubung dengan Pegawai KEMAS Daerah untuk menyelaras kerje-kerja naik taraf tersebut agar tidak mengganggu sesi persekolahan:- 3. Pegawai Inden berhak membatalkan kontrak tuan sekiranya tuan_ berada dalam keadaan berikut dan setelah menerima surat amaran daripada Pegawai Inden:- 3.1 Sekiranya Kontraktor masih gagal menyiapkan kerja dalam tempoh masa yang ditetapkan; 3.2. Kemajuan kerja terlalu perlahan tanpa apa-apa sebab yang munasabah; wed Rujukan : KEMAS SBH 200-06/01 Jid. 8 ( 55 ) Tarikh : 23 OGOS 2021 14 MUHARRAM 1443H, 3.3 Penggantungan perlaksanaan seluruh atau sebahagian kerja, tanpa sebab-sebab yang munasabah; 3.4 Tidak mematuhi arahan Pegawai Inden tanpa apa-apa alasan yang munasabah; 3.5 Apabila kontraktor diisytinarkan bankrap oleh pihak yang sah. 3.6 Kontraktor gagal memulakan kerja dalam tempoh 14 hari dari tarikh milik tapak; dan 4. _ Sekiranya pihak tuan / puan tidak dapat menyiapkan kerja dalam tempoh yang telah ditetapkan dan memerlukan lankutan tenpoh penyiapan kerja, pihak tuan / puan diminta memaklumkan dan menghantar surat secara bertulis kepada Pengarah KEMAS Negeri Sabah sebelum tarikh siap sebenar tamat. Sila ambil makium, sebarang kelewatan menyiapkan kerja boleh menyebabkan syarikat tuan / puan dikenakan tindakan 5. Bersama-sama ini disertakan salinan asal INDEN KERJA dan salinan asal spesifikasi kerja. Tuan / puan adalah diingatkan supaya mematuhi spesifikasi kerja dan pihak Jabatan tidak akan bertanggungjawab atas sebarang perubahan selepas penyerahan oleh pihak Jabatan kepada kontraktor pelaksana. Sekian, terima kasih. “ PRIHATIN RAKYAT: DARURAT MEMERANGI COVID-19 ” “ BERKHIDMAT UNTUK NEGARA ” “ Luar Bandar Sejahtera “ Saya yang menjalankan amanah, ee ———eennmeee (AHMAD F, AZMAN BIN MUHAMMAD RADZI BCM.PJK.) Pengarah Jabatan Kemajuan Masyarakat (KEMAS) Negeri Sabah Kementerian Kemajuan Luar Bandar (P) MALAYSIA Sk Pegawai KEMAS Daerah Kota Kinabalu ole Rujukan : KEMAS SBH 200-06/01 Jid. 8 ( 55 ) Tarikh : 23 OGOS 2021 14 MUHARRAM 1443H SURAT SETUJU TERIMA Dengan ini yang bertandatangan di bawah ini bersetuju dengan syarat-syarat di atas dan mengaku penerimaan surat di atas dan salinannya telah disimpan. Saya juga bersetuju bahawa saya bertanggungjawab untuk membaiki kecacatan, ketidaksempurnaan, kekecutan atau apa-apa kerosakan lain yang mungkin kelihatan dan yang disebabkan oleh bahan atau barang atau mutu hasil kerja yang tidak menepati sebut harga ini apabila diarahkan oleh Pegawai Inden dan dalam masa yang berpatutan. Saya hendaklah membaiki kecacatan, ketidaksempumaan, kekecutan atau apa-apa jua kerosakan lain atas kos saya sendiri ‘Tandatangan Kontraktor Tandatangan Saksi Nama Penuh: Nama Penuh: Atas Sifat: Meterai atau Cop Kontraktor No Tel: No Faks: No Telefon Bimbit: Tarikh: Tarikh: PENDAWAIAN SEMULA ELEKTRIK DAN KERJA-KERJA BERKAITAN BAGI TABIKA KEMAS rN KOTA KINABALU, SABAH. BILL OF QUANTITIES (All quanties are Provisional And Subject To Final Measurement) KERJA PENDAWAIAN ELEKTRIK KG. KOPUNGIT BIL BUTIRAN KERJA unit | ary HARGA JUMLAH 14 12 13 14 15 7 24 22 23 24 [To supply, instal, testing and commissioning as per drawing land specifications. All quantities given are PROVISIONAL. {The actual quantities installed shall be measured on site after |completion and prices adjusted accordingly. WIRING (SURFACE CONDUIT WIRING) |All wiring shal bein uPVC conduit galvanised trunking Lighting point using 2 x 1.5mm2 PVC cable cw protective conductor & 10A 1 lway SP fush switch Ceiling fan / Wall Fan point using 2x 1.5 sq, mm PVC cable and protective lconductor cw 10A SP fush svtch and hook Exhaust point using 2 x 1.5 sq, mm PVC cable and protective conductor clw 108 SP fush switch 3A socket outet point using 2x 2Smm2 PVC cable and protective |conductor cl 13A 3 pin fush switch socket outlet for 1 gang 3A socket outet point using 2x 2Smm2 PVC cable and protective |conductor cw 13A 3 pin fush switch socket outet for 2 gang Water Heater pont using 2 x 4mm? PVC cable clw GPC & 32 DP swicth with neon indicator ght and 154 round pin |Aircond point using 2 x 4mm? PVC cable ciw CPC & 32 DP swicth with neon indicator light and 15A round pin LUMINAIRES |) All tems supplied must be of lcs! make i they are locally available and have been approved by the appropriate authority. [Al fuorescent luminaires including PLC lamp forall downlights shal be supplied chv approved polyester resin filed low loss (6¥V)ballast, power factor correction capacitor and tubesof colour 4. i) All fitings mounted in the celing shall be independently |suspended using suitable siza of steel wire and bracket/hook li) The tender is required to submit the catalogue for the purpose of tender evaluation. 1 x 36W surface mounted fluorescent luminaire 2x 36W/ surface mounted fuorescent luminaire cw miror reflector 500mm. dia low energy consumption BOW sweep ceing fan double coating| ype ctw bitin safety thermal fuse againts electrical surge or motor overheat condensor motor, salety wire, 5 speed regulator, suspension rod ete Wall Fan 400mm Nos | 16 Nos | 5 Nos | 2 Nos | 1 Nos | 6 Nos | 1 Nos | 1 Nos | 6 Nos | 10 Nos | 3 Nos | 2 100.00 100.00 100.00 130.00 180.00 300.00 300.00 80.00 160.00 300.00 350.00 1,600.00 500.00 200.00 130.00 900.00 300.00 300.00 480,00 1600.00 900.00 700.00 (total brought forward to next page) 7,640.00 BOAT PENDAWAIAN SEMULA ELEKTRIK DAN KERJA-KERJA BERKAITAN BAGI TABIKA KEMAS A KOTA KINABALU, SABAH. BILL OF QUANTITIES (All quantties are Provisional And Subject To Final Measurement) KERJA PENDAWAIAN ELEKTRIK KG. KOPUNGIT BIL, BUTIRAN KERJA UNIT ary HARGA JUMLAH (total brought forward from previous page) 7,640.00 34 44 42 A 52 DISTRIBUTION BOARDS To supply and instal the following DB(s) as per drawing and specification The following DE(s) shall be installed ciw MCB(s), MCCBIs), RCCBKs) and tush metallad adaptable back box behind DB\s) as per drawing and specication 14 ways 60A SPN MCB DP DB ciw RCCB60A 30mA & 100mA, MCB etc. |SUBMAIN CABLE i) All cable shall be in hot cipped galvanized trunking / on perforated cable ray clw accessories that are relevant and should be painted wit colour code! indication band of electrical channels. i) All cables and earth conductors shall be of the type of copper clw cable ug for termination. i) Al trunking shall be fitted with 25mm x 3mm copper tape on each lnk runking [PVC cable in hot dipped galvanised trunking as a submain clw termination end box, bracket, supports and other required accessories. lax 1C- 16mm s9. PVC Cu. cables + CPC run in gay. Trunking fom at Meter Panel to DB-TS at Kelas |2x 1C- 16mm sq, PVC Cu. cables run in galv. Trunking from line tap to Meter Pane! EARTHING SYSTEM o supply instal and test the complete earing system to earth using minimum 2 sets of copper jacked ste! core rods wih 16mm cia.x 300mm length, 25mm x 3mm copper tape, heavy duty inspection chamber and accessories es pe drawing & specification Note: [Connecting using exerthermic welding 11x 1G - 18mm s9, PVC Cu. cables run in uPVC Condut for earthing Lot Lot Lot Lot Lot 1,300.00 250.00 250.00 450.00 100.00 1,300.00 260.00 250.00 450.00 100.00 (total brought forward to next page) 9,960.00 BOA2 PENDAWAIAN SEMULA ELEKTRIK DAN KERJA-KERJA BERKAITAN BAG! TABIKA KEMAS KOTA KINABALU, SABAH. KG. KOPUNGIT BILL OF QUANTITIES (All quantities are Provisional And Subject To Final Measurement) ‘A KERJA PENDAWAIAN ELEKTRIK BIL BUTIRAN KERJA UNIT | QTY | HARGA JUMLAH (total brought forward from previous page) 9,960.00 6 |DISMANTLE 6.1. |To dismantle / uninstall all electrical fitting and wiring Lot 1 500.00, 500.00 7 |SHOP DRAWINGS 7. foonstution from the S.0.'s Representative al shop drawings for he us | us | 50000] 500.00 calueted and approved before constuction. Final sub-crcuts shal neues 8 |AS-BUILT DRAWING 8.1 |Four (4) sets of as-built drawings as required in the relevant Specifications, us us 500.00 500.00, al Instaliation Manuals, Operaton Manuals 9 other 9.1 [Dealing with SESB for the purpose of diverting electricity supply to the tot | 1 | 50000 | 500.00 Inearest pole 10 |CIVIL WORKS 40:4 |Dismantie, supply and install homogenous tiles 300mm x 300mm x8mm at | M2 | 6 | 100.00 | 600.00 wang tabika cw nclucng related workin accordance with he istuctons of ine superintendent officer 10.2 |Work Scraping od paint etc. rom wood surfaces as well as other related ork as pr the instruction of the superintendent ja) Internal M2 158 9.00 1,422.00 10:3 |Supply and apply one coat of sealer and 2 finishing paints on wood surfaces according to the approval and instructions of the superintendent la) Internal m2 | 158 | 35.00 | 5,530.00 TOTAL SUMMARY (FOR BILL. A) 19,512.00 BOIA3- Tandatangan . Tandatand: (Kontraktor/ Pembekal ) _ ger LI BIN AHMAD NAZRI Timbalan Pengaran Cop COP in gasienigam & Pemban guna Tarikh Tarikh ena Nosen Sabah 23° Bo Tandatangan oe ( Pegawai Penerima ) ‘Cop Tarikh

You might also like