A PEKERJAAN KOLOM LT01 B2 FLOOR
1 PEKERJAAN PEMBESIAN
a D32 Rp 1,715,372,442.00
b D16 Rp 190,186,432.80
2 PEKERJAAN BEKISTING Rp 38,110,968.00
3 PEKERJAAN PEMBETONAN Rp 26,323,158.60

B PEKERJAAN BALOK LT 01 B2 FLOOR


1 PEKERJAAN PEMBESIAN
a D25 Rp 218,968,879.70
b D22 Rp 50,038,357.85
c D16 Rp 83,975,705.20
2 PEKERJAAN BEKISTING Rp 13,270,164.30
3 PEKERJAAN PEMBETONAN Rp 3,528,226.87
SUB TOTAL Rp 2,339,774,335
BOBOT RENCANA %
BOBOT KOMULATIF %
TIME SCHEDULE

BOBOT DATA
JADWAL PELAKSANAAN PEKERJAAN
PEKERJAAN AGUSTUS SEPTEMBER
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5
(%)
Tgl 15 s/d 20 Tgl 22 s/d 27 Tgl 29 s/d 03 Tgl 05 s/d 10 Tgl 12 s/d 17
4 5 6 7 8 9

73.31% 36.66 36.66


8.13% 4.06 4.06
1.63% 0.81 0.81
1.13% 0.56 0.56

9.36% 3.12 3.12 3.12


2.14% 1.07 1.07
3.59% 1.20 1.20
0.57% 0.28
0.15%
100%
36.66 42.10 8.56 5.39 5.67
0 36.66 78.75 87.32 92.70 98