Professional Documents
Culture Documents
File Ade BBS Rab Dan Time Schedule
File Ade BBS Rab Dan Time Schedule
PEKERJAAN :
LOKASI :
PEKERJAAN SPESIFIK : STRUKTUR ATAS
TAHUN ANGGARAN : 2022
1 2 3
A PEKERJAAN KOLOM LT01 B2 FLOOR
1 PEKERJAAN PEMBESIAN
a D32 Rp 1,715,372,442.00
b D16 Rp 190,186,432.80
2 PEKERJAAN BEKISTING Rp 38,110,968.00
3 PEKERJAAN PEMBETONAN Rp 26,323,158.60
BOBOT DATA
JADWAL PELAKSANAAN PEKERJAAN
PEKERJAAN AGUSTUS SEPTEMBER
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5
(%)
Tgl 15 s/d 20 Tgl 22 s/d 27 Tgl 29 s/d 03 Tgl 05 s/d 10 Tgl 12 s/d 17
4 5 6 7 8 9
1.20
0.28
0.15
1.63
100