You are on page 1of 3
lent Repretentative/The Engifcar eShies CONTRACO., Project Ref.: ‘Selwa Beach Resort Hotel Salwa, Qatar |P246/MS/04/M/0040 Rev.00 ntractor: CONTRACO wil, P.O. Box: 2658, Doha-Qatar _[Sub. Contractor; STRUCTUREL QATAR W.LL, Transmittal of Documents Method statement for stalin, Testing snd Commissioning of Chemical Dosing System - (Hard Copy? & Soft Copyi.co) —_ - “ype of Document Method Statement - ‘As above mentioned Team Reference a a Basan Peasioas/o4/s/oo4o | 00 | xasep-17| | Metod States staan, Tsing and Commision of —_ sexx Nothing follows: [These are transmitted for: Q [We certify thatthe above Transmittal of Documents have been coordinated. Serene ESM ESOr ET fubrted by: Nassim Saba -Project Manager _[E= 2 ZEN Approved ‘Approved as noted Revise and Resubmit Rejected Gi Checking Review and Comment Your information - Supervision Consultant comments pore [oro tat reer Conc ebis vde te oil ot cone ators oTay SET 7 Client Representative/The Engineer es anseanesny 19 SEP 2M) hie BEA SeANS CONTRACO, Privae Engineering Project Management Consultant L4 daral-handasah shairand partners [Transmittal No. 'P246/Ms/04/M/0040 Rev.00 Project Ref.: ‘Salwa Beach Resort Hotel Salwa, Qatar fran comma trace ooo” poco Suc WL [&) Method statement Transmittal of Documents Ci omners... i. Subject Description ‘Method Statement for installation, Testing and Commissioning of Chemical Dosing System (Hard Copy 2 & Soft Copy 1.€D) ‘ype of Document: Method Statement Te Reference a Deseration P2as/Ms/o4/Mo04o | 09 | 24-Sep-17] 2 | Method Statement saloon, Tesi and Commisioningof — i oor Nathing follows mx [These are transmitted for: a Your information Approval Gi checking C1 eview and comment fe certify that the above Transmittal of Documents have been coordinated. pines by Nassim Saba - Project Manager Signature adit _| Supervision Consultant comments Aeproved — oO ‘Asproved as noted Revise and a 5 Resubmit o Rejected Signature Date: vt Goeronl sant eee Corsaro his abites under he Cont orcanptte aration of oy change a Conrad Dasani Ca ope 4 METHOD STATEMENT Seer SALWA BEACH RESORT HOTEL ‘ryt fie SALWA, QATAR SEETBAR SS iz } Document Ref. No. [Re Date Page \ No sam @ raise sig cel st Tan Page tor] ce O "Sear 2 futadatas | PATRSTOMTATOOAO | 00 St METHOD STATEMENT FOR INSTALLATION, TESTING AND COMMISSIONING OF CHEMICAL DOSING SYSTEM Rev. | PREPARE REVIEWED BY “APPROVE No. | DBY DBY RUANZILIR | FLORDESPINA | SURINDER ‘WoRsiag ——[ Rassinr axa SING Lair (MANSGER MANAGI cP WSAMANAGER | CONST. MANAGER | MANAGER I.

You might also like