EXHIBIT A-22
JOB BOOK REQUIREMENTS
1.0 GENERAL
1.1 Without limiting the information summarized herein, the purpose of this document is to provide
an outline for the minimum contents of the Job Books to be prepared by Contractor by the date set
forth in the Agreement.
1.2 The Job Books shall meet the minimum requirements for submittals set forth in Exhibit A-24
(Submittal Requirements).
2.0 DEFINITIONS
2.1 Unless defined in this Exhibit, terms that begin with an upper case shall have the meaning defined
in the Agreement.
3.1 General:
3.1.1 Index:
3.1.2 Schedule:
Page 1 of 6
Exhibit A-22 - Job Book Requirements
(2) Incident reports, including accidents, thefts, injuries, and near misses
3.1.5 Changes:
3.1.6 Permits:
3.1.7 Training:
3.1.8 Reporting:
3.1.9 Contracting:
(3) Contracts and purchase orders for Major Subcontractor’s equipment (non-priced)
Page 2 of 6
Exhibit A-22 - Job Book Requirements
(5) Final geotechnical engineering report (including ramming and pull-out tests)
(b) Sections
(d) Trackers
(f) Substations
(h) Project SCADA System (as defined in Exhibit A-1 (Scope of Work)
(7) As-Built Drawings, including all items listed under Section 3.2.1(6) above
(1) Manuals and data sheets, including all Main Equipment and Major Components
within or a part of:
(a) Sections
(c) Substations
(e) Project SCADA System (as defined in Exhibit A-1 (Scope of Work)
Page 3 of 6
Exhibit A-22 - Job Book Requirements
(2) Instruction manuals for all Main Equipment and Major Components where
appropriate for building systems
(3) Main Equipment and Major Components factory acceptance test reports
(5) Warranty agreements and final certificates (including contact information) for all
Main Equipment and Major Components
Page 4 of 6
Exhibit A-22 - Job Book Requirements
(b) Substations
(d) Project SCADA System (as defined in Exhibit A-1 (Scope of Work)
(b) Substations
(d) Project SCADA System (as defined in Exhibit A-1 (Scope of Work)