BALOCHISTAN INTEGRATED WATER RESOURCES MANAGEMENT & DEVELOPMENT PROJECT - BIWRMDP

Project Supervision & Implementation Assistance Consultant (PSIAC)


JOINT VENTURE OF ACE-CAMEOS & KASIB (As Sub-Consultant)

TIME SHEET
NAME: Sohail Abbas DESIGNATION: Site Surveyor EMPLOYER: KASIB ASSOCIATES

MONTH & YEAR: November- 22 Grade Employee Code

Sunday/ Holiday

Present

Absent
Leave

Total
Tour
DATE DAY WORK PERFORMED REMARKS

1 Tuesday Checked Work Done Excavation of Spillway Dam#2 1


2 Wednesday Checked Work Done Level Excavation of Left Side Canal Package#3 1
3 Thursday Checked Work Done Level Excavation of Left Side Canal Package#3 1
4 Friday Checked Work Done Level Excavation of Left Side Canal Package#3 1
5 Saturday Checked Layout of Right Side Guide Bund Weir Structure Package-1 1
6 Sunday Weekend 1
Monday Checked Layout for Stone Masonry of 5 Cell Culvert RD 1+056 Package-1 1
8 Tuesday Checked Layout for Stone Masonry of of Spillway Dam#3 1
9 Wednesday Checked Layout RCC Bed Stilling Basin Bed at Weir Structure Package-1 1
10 Thursday Checked Layout for Stone Masonry at Spillway Dam#2 1
11 Friday Checked Layout RCC Bed Stilling Basin Bed at Weir Structure Package-1 1
12 Saturday Checked Land Leveling Work at Ameen Balwo Land 1
13 Sunday Weekend 1
14 Monday Checked Layout & Excavation of Spillway Dam#4 1
15 Tuesday Checked Stone Masonry of Spillway Dam#3 1
16 Wednesday Checked Layout RCC Bed Stilling Basin Bed at Weir Structure Package-1 1
17 Thursday Checked Layout & Excavation of Cut of wall#1 at Spillway Dam#2 1
18 Friday Checked Layout RCC Bed Stilling Basin Bed at Weir Structure Package-1 1
19 Saturday Checked Land Leveling Work at Muhammad Gul Land 1
20 Sunday Weekend 1
21 Monday Checked Stone Masonry of 5 Cell Culvert RD 1+056 Package-1 1
22 Tuesday Checked Layout & Excavation of Cut of wall#3 at Spillway Dam#2 1
23 Wednesday Checked Layout RCC Bed Stilling Basin Bed at Weir Structure Package-1 1
24 Thursday Checked Layout & Excavation of Cut of wall#2 at Spillway Dam#2 1
25 Friday Checked Layout RCC Bed Stilling Basin Bed at Weir Structure Package-1 1
26 Saturday Checked Land Leveling Work at Abdul Wahab Land 1
27 Sunday Weekend 1
28 Monday Checked Layout RCC Bed Stilling Basin Bed at Weir Structure Package-1 1
29 Tuesday Checked Layout and Excavation of D/S Retaining Wall Spillway Dam#2 1
30 Wednesday Checked Layout RCC Bed Stilling Basin Bed at Weir Structure Package-1 1
4 26 30
W = WEEKEND S = SICK LEAVE
H = HOLIDAY E = EARNED LEAVE
T = TOUR R = RECREATION LEAVE
C = CASUAL LEAVE L = LEAVE ON LOSS OF PAY
2) MANAGER ADMIN
1) SIGNATURE OF EMPLOYEE 3) SIGNATURE OF RE/CDS
PSIAC

4) EXECUTIVE DIRECTOR KASIB 5) SIGNATURE OF CHIEF RESIDENT 6) SIGNATURE OF DEPUTY PROJECT


7) TEAM LEADER
ASSOCIATES ENGINEER DIRECTOR (PIU)