CAI 0665 PWR SURVEY ( 25-11-2018 ) NOTE SITE WORK ON ONE PHASE

AC BOARD
MAIN SWITCH 63A

PDP
2 MAIN SWITCHES 40A + DISTRIB CB'S ( 1CB 32A + 2 CB 25A + 4 CB 16A + 1 CB 20A )

ZTE W121
TN 20P " 6 LINKS " + 1 STRING OF BATTERIES 100A WITHOUT COVERS + DCDU 01 +
TRAFFIC E1

SSC 01
3 PSU AC +PSU FILTER + CABINET POWER 5 RRU ON THE TOWER

BBS 2116
2 STRINGS OF BATTERIES 100 A

RBS 6102
POWER 3 RRU'S ON POLES + 2DUG2001 + 6RUS 02B3 + BB 5216 + DUW 4103 + 2 SAU +
1OVP ALARM + 2 OVP TRM1 +SCU 0101 + SHU 0201 +
1PDU 0104 + 2 PDU 0101 + PFU 0101 + 3 PSU AC 03 + BFU 0102 + PCU AC 06

REQUIERMENTS
1 CB 80 OR 100 A FOR AC BOARD
1 CB 80A FOR PDP
1 CB 63A FOR PDP ( HCR )
10 METERS CABLE 4*25 FOR ELTEK
40 METERS CABLE 25mm FOR TN DCDU ( 4 CABLES EACH CABLE 10 M )
80 METERS CABLE 2*6 FOR 8 RRU ( EACH CABLE 10 M )
14 METERS CABLE 90mm FOR RBS 6102 ( EACH CABLE 7 M )
20 METERS CABLE 2*6 FOR DUW HOUSING ( EACH CABLE 10 M )