Planning Lifting Operation: Ensure the total load lifted does not exceed the rated capacity of the

hoist

Rigging and loading will clear all obstacles and non-essential personnel from the operation work
area, All faculties, pushbuttons, switches, and other essential parts of the machine work correctly.

All the erection will be as per the instruction manual and relevant work will be carried out under the
supervision of a qualified competent supervisor /engineer

Materials Shifting: By conducting a routine inspection of the personnel/material hoist, a Weekly


checklist of the hoist shall be in practice

Hoist rope or lower hook to above floor level and check visually for any broken wires, kinking,
crushing bird caging, or corrosion. Check the load chain for bent, stretched, cracked, scored, or heat-
damaged links. improper operation of the brake system parts,