PY Brennen bunk POARAnEA OVERTIME WORK PERMIT FORM
[ENGINEERING PROCUREMENT -CONSTRUCTON NEW/BARU Permit Number / Nomor izin
EXTENTION/PERPANJANGAN __| POP/OT/.
ied erry _ceseru> 0 [bape] _eowes sire scnandyaiiny/ wana bata
Published Date /Tanggal dikeluarkan: Ve .\\. 242 From / Deri | Date Tal (AL 20% [To] teem
Location of Work/Lokasi: set ty reece [time Jam: | 9.0 tol 92.00
‘Work Executor / Pelaksana Pekerjaan :
Detail of Job /Uraian Pekerjaan: — gouawe eecr conveyou
[DETAILS OF WORKT
company Name / Nama Perusahaan Le ee
fe / Tanggal 6 a 3005
ffime 7 Jam [ie 0103268
-xacl Job to be executed /Pekerjaan yang - eouine eer convevon
jilaksanakan
lumber of Workers / Jumiah Pekerja [oe oeane
Name of Supervisor / Nama Supervisor [ON Meenyous Phone/Telepon: @e92 389 cen _|
B.LIST OF WORKER/ DAFTAR NAMA PEKERJA me
NO | Name / Nama No. 1D No Name /Wama Ne.10
T_ [Au averyioas wwe 12
2 tes oe we, 13, a
3 [yee WeLeee 14
4 Wery, wecece 16 :
5 rs were 16 =
6 [vn eannran AEE 7
7 SeINOye Meee 18 ai
[ANAC ators Wecere 19
° 20
70 2 =
i ae 2 sen
SPECIAL SAFETY INSTRUCTON | INSTRUKS! K3 KHUSUS :
THAVE READ, UNDERSTOOD AND CHECKED CONDITION WHERE THE JOB CAN BE DONE | Endorsedby,
‘SAFELY AND AGREE TO OBEY ALL PRECAUTIONS STATED IN THE PERMIT.
‘SAYA SUDAH MEMBACA, MENGERTI, MEMERIKSA KONDIS! DIMANA PEKERJAAN DAPAT
DILAKSANAKAN DENGAN AMAN DAN SETUJU UNTUK MEMATUHI SEMUA KETENTUAN YANG |
‘TERTULIS DI IJIN INI
‘Supervisor POP
Name
‘uconracior
Representa
HSE FOP
Giant Representative
JOB FINISH OR EXTEND 7 PEKERJAAN SELESAl ATAU DITUNDA———————-
Pail [I Accept the work (Completed / Extend)", Work Place Has been |
1 time suem | clean and safe
Yee /eteraan | Oste/Tenggs!) Tire” | Seva menerima pekerjaan (selesai / ditunda/diperpanjang)*,
Tempat kerja telah kemball aman dan bersin,
Finish /Seleea: | |
Exiond/ Dtundsl
ogre Sager oor nee
Sore ity Sure Nae Name Name: Mane: |
Sore Sarre Serer ereeeene
ere oe Sutcontactor ‘superterdent) | cent
eprsenaive | superisoreo | __ HS Poe cu apresenate