THE ELECTRICITY WIRING REGULATIONS 4_éla_l il
DEPARTMENT OF ENERGY
G2. Continued...
‘occupancy hours, use of smart technology, thermal performance and building management
system.
Domestic 30.80 55
Offices “00-160 125
Hotes 75-100 38
Shops “40-100 70
Car Paks (open ait) 0-10 5
Car Pak (basoment without al) 7020 16
Note 7: during summer, ai-conditioning make up 70% to 80% ofthe total power demand.
Note 8: the above figures represents power demand values at building plot level
Worked example
‘The worked example shows how diversity may be applied to a Low Voltage Electrical
Installations for a typical project. It is not intended that the figures provided are to be used on
projects but are guidance on where diversities can be applied within the installation, The sample
is not intended for use in sizing sub-mains or Final Circuits, their evaluation for Voltage drop and
applied grouping and rating factors.
Outgoing Circuit
tho same a0 SMOB TF
Ee
Sprinkler Pump
octey Pump
Surge Potcton Deven
Power Faster Coreston
‘Bosument ne, DEPOROWOOT Vorsonnao "Etocive Date: OVD42020 Pago T0607 208
This document isin copy right and contains valuable and proprotary informatio. No pat of this document may be reproduced
in any form or by any means without the prior permission and authorization of the Department of Energy (DoE), Abu Dhabi.THE ELECTRICITY WIRING REGULATIONS 4_éla_l il
DEPARTMENT OF ENERGY
G2. Continued...
The notional building comprises a 7 story apartment building (G+6) with a ground floor common
area, car park and landscape area externally, All apartments are the same size, 3 bedrooms
and are located from first to sixth floor, Each apartment is provided with its own dedicated
Distribution Board supplied from a tenant Sub Main Distribution Board located at each floor level.
Centralised chillers are provided configured with 2 duty and 1 standby, these are interlocked to
prevent all 3 of them running simultaneously. A centralised plant room provides:
* Air handling facilities for fresh air and extract to the building configured in duty
only.
= Pumped water facilities for domestic water configured in duty standby.
+ Pumps associated with the chilled water systems configured in duty standby.
A sprinkler system is provided with a main electric pump and jockey pump to prime the system.
‘The back up is provided by a diesel fire pump. There are two lifts in the building to serve the
upper floors.
Differing types of loads allows the Watts per square metre to be checked at each stage of the
calculation, Spare allowances are not included within the elemental calculation of Watts per
square metre, only in the overall calculation. The range of diversity applied will be dependent
(on the building type, its intended use, its location and the construction standards adopted (for
‘example the level of thermal insulation will impact on the energy usage within a building)
The arrangement of the Distribution Boards allows the designer to identify the diversity type
and factor as well as the Circuit type, Abreviations contained within the schedules are detailed
below:
Power Inching fied Applances, socket
Pw fulets, ‘cookers and. ther cadeated
‘equipment supe.
Te Tighing bath intemal and extemal
‘Appl to local and
wt ae ‘ontalised systems,
‘Aircondioring motos for air
Mo Motors including His, sanitary pumps, handling units and ciled water
water pumps ete. systems are included within the AC
Section
‘Arcondlioning units including chillers, | Molors assocated with ventilation and
ac fan cols, airhandling units and chiled | airconditioning ae included in this
water pumps: section.
‘Bosument ne, DEPOROWOOT Vorsonnao "Etocive Date: OVD42020 Page
This document isin copy right and contains valuable and proprietary information. No pat of this document may bo reproduced
in any form or by any means without the prior permission and authorization of the Department of Energy (DoE), Abu Dhabi.THE ELECTRICITY WIRING REGULATIONS 4_éla_l il
DEPARTMENT OF ENERGY
‘Sub-Main Distbuilon dversiy applied | The applied cversy applied to all of
su ‘cross the equipment serve. ‘he distribution on an elemental basis.
RAD Radial Creat
RNG ing Creat
EIA Earth leakage alarm
ROD (S) Time delayed RCD
EIR Earth leakage relay
Loads that are standby such as sprinkler pumps which are not normally required except in an
emergency may be omitted from the diversified load calculation. For loads that are configured
in run/standby, the standby element of the distribution may be omitted from the diversified load.
Where the loads are connected in 2N format, for example data centres, only a single load may
be counted for the diversified loads. The area used in the calculation of the Watts per square
meter is the gross internal floor area.
‘Bosument ne, DEPOROWOOT Vorsonnao "Etocive Date: OVD42020 Page
This document isin copy right and contains valuable and proprotary information. No pat of this document may bo reproduced
in any form or by any means without the prior permission and authorization of the Department of Energy (DoE), Abu Dhabi.THE ELECTRICITY WIRING REGULATIONS
4_4l_b_Il io
DEPARTMENT OF ENERGY
G2. Continued.
Cy aie
eer eae e RE ERR E E SATS te]
Cele) (See) 2) S| oa] |e “lf gy em
aa Sef i cn eis eles sisi alee aieaiceias
ro yam) BE] a] ow | em] mw] aa] we | wee P| a] of
Eevee |= om] g om| + | «| & |r) Tom mae[ vom ao ow [ome ome [am ont | am
ESE) > mals im) | + |e ww em cml earma alow ar er sm | ua
maar mR ERE] | we aa a | oa
apmamny | Own aR] | ea ewe | OO OS
aes TS eat SS SS =aS SS oS
cry afer cnc cashes ila
La mee me p= ee SS aS
Ti
—— Sen eed ee ie eel cee
SS ST
Jen oa See ee
Deser Te OOCPOROTTT Tasonme aces Oe OTE Fase OE
This document isin copy right and contains valuable and proprietary information. No pat of this document may bo reproduced
in any form or by any means without the prior permission and authorization of the Department of Energy (DoE), Abu Dhabi.THE ELECTRICITY WIRING REGULATIONS
4_4l_b_Il io
DEPARTMENT OF ENERGY
= ee rae ee
Fa IPA Par oe ara
Ime ‘Come mt meme tw) fet) ew) 3,| ] om] 9)
. an
Saar
ea > ae a) + [= ew ve) ve ve) ae gee] en] ss] em me
mar > ee ey) sew Tw ce ce aa yee ee ox) em me
Fa a ee ea) |B ww Tw ve ce aa yew a ox] ew me
wa > fem Rt | * [# [ew rm) tm eam ow] ew] on] om am
et foray [Ona FAR 8 AOAC ice sta
a RS EE TT SE A —
a Sa] 3) | ee [ea
Donat no DOEPOROTEOT Tanne Tce Date OTB Pose TOoTT
This document isin copy right and contains valuable and proprietary information. No pat of this document may bo reproduced
in any form or by any means without the prior permission and authorization ofthe Department of Energy (DoE), Abu Dhabi.THE ELECTRICITY WIRING REGULATIONS
4_4l_b_Il io
DEPARTMENT OF ENERGY
omer ee
| sche on | |=
Tent | “Povawtrece | nortan Shah) cae Ora | Paar Fie
pe
8 ili
1 |g r[vfe
gfe ala laial
5|3 BP bles
cages eg eae Sais (al [o= l= le
mae is ea ae Seiad
i er
eee = mz STS oes a] os
2S a mealies
. croc mfp giao egies mel
fap Ee fee me fom Jom Pam om
; pees ee
fe tie eee ced eee fer er) pear aSoo SS
Dont no DOEPOROTEOT Tanne Tce Date OTB Page TE
This document isin copy right and contains valuable and proprotary information. No pat of this document may bo reproduced
in any form or by any means without the prior permission and authorization ofthe Department of Energy (DoE), Abu Dhabi.