THE ELECTRICITY WIRING REGULATIONS 4_éla_l il DEPARTMENT OF ENERGY G2. Continued... ‘occupancy hours, use of smart technology, thermal performance and building management system. Domestic 30.80 55 Offices “00-160 125 Hotes 75-100 38 Shops “40-100 70 Car Paks (open ait) 0-10 5 Car Pak (basoment without al) 7020 16 Note 7: during summer, ai-conditioning make up 70% to 80% ofthe total power demand. Note 8: the above figures represents power demand values at building plot level Worked example ‘The worked example shows how diversity may be applied to a Low Voltage Electrical Installations for a typical project. It is not intended that the figures provided are to be used on projects but are guidance on where diversities can be applied within the installation, The sample is not intended for use in sizing sub-mains or Final Circuits, their evaluation for Voltage drop and applied grouping and rating factors. Outgoing Circuit tho same a0 SMOB TF Ee Sprinkler Pump octey Pump Surge Potcton Deven Power Faster Coreston ‘Bosument ne, DEPOROWOOT Vorsonnao "Etocive Date: OVD42020 Pago T0607 208 This document isin copy right and contains valuable and proprotary informatio. No pat of this document may be reproduced in any form or by any means without the prior permission and authorization of the Department of Energy (DoE), Abu Dhabi. THE ELECTRICITY WIRING REGULATIONS 4_éla_l il DEPARTMENT OF ENERGY G2. Continued... The notional building comprises a 7 story apartment building (G+6) with a ground floor common area, car park and landscape area externally, All apartments are the same size, 3 bedrooms and are located from first to sixth floor, Each apartment is provided with its own dedicated Distribution Board supplied from a tenant Sub Main Distribution Board located at each floor level. Centralised chillers are provided configured with 2 duty and 1 standby, these are interlocked to prevent all 3 of them running simultaneously. A centralised plant room provides: * Air handling facilities for fresh air and extract to the building configured in duty only. = Pumped water facilities for domestic water configured in duty standby. + Pumps associated with the chilled water systems configured in duty standby. A sprinkler system is provided with a main electric pump and jockey pump to prime the system. ‘The back up is provided by a diesel fire pump. There are two lifts in the building to serve the upper floors. Differing types of loads allows the Watts per square metre to be checked at each stage of the calculation, Spare allowances are not included within the elemental calculation of Watts per square metre, only in the overall calculation. The range of diversity applied will be dependent (on the building type, its intended use, its location and the construction standards adopted (for ‘example the level of thermal insulation will impact on the energy usage within a building) The arrangement of the Distribution Boards allows the designer to identify the diversity type and factor as well as the Circuit type, Abreviations contained within the schedules are detailed below: Power Inching fied Applances, socket Pw fulets, ‘cookers and. ther cadeated ‘equipment supe. Te Tighing bath intemal and extemal ‘Appl to local and wt ae ‘ontalised systems, ‘Aircondioring motos for air Mo Motors including His, sanitary pumps, handling units and ciled water water pumps ete. systems are included within the AC Section ‘Arcondlioning units including chillers, | Molors assocated with ventilation and ac fan cols, airhandling units and chiled | airconditioning ae included in this water pumps: section. ‘Bosument ne, DEPOROWOOT Vorsonnao "Etocive Date: OVD42020 Page This document isin copy right and contains valuable and proprietary information. No pat of this document may bo reproduced in any form or by any means without the prior permission and authorization of the Department of Energy (DoE), Abu Dhabi. THE ELECTRICITY WIRING REGULATIONS 4_éla_l il DEPARTMENT OF ENERGY ‘Sub-Main Distbuilon dversiy applied | The applied cversy applied to all of su ‘cross the equipment serve. ‘he distribution on an elemental basis. RAD Radial Creat RNG ing Creat EIA Earth leakage alarm ROD (S) Time delayed RCD EIR Earth leakage relay Loads that are standby such as sprinkler pumps which are not normally required except in an emergency may be omitted from the diversified load calculation. For loads that are configured in run/standby, the standby element of the distribution may be omitted from the diversified load. Where the loads are connected in 2N format, for example data centres, only a single load may be counted for the diversified loads. The area used in the calculation of the Watts per square meter is the gross internal floor area. ‘Bosument ne, DEPOROWOOT Vorsonnao "Etocive Date: OVD42020 Page This document isin copy right and contains valuable and proprotary information. No pat of this document may bo reproduced in any form or by any means without the prior permission and authorization of the Department of Energy (DoE), Abu Dhabi. THE ELECTRICITY WIRING REGULATIONS 4_4l_b_Il io DEPARTMENT OF ENERGY G2. Continued. Cy aie eer eae e RE ERR E E SATS te] Cele) (See) 2) S| oa] |e “lf gy em aa Sef i cn eis eles sisi alee aieaiceias ro yam) BE] a] ow | em] mw] aa] we | wee P| a] of Eevee |= om] g om| + | «| & |r) Tom mae[ vom ao ow [ome ome [am ont | am ESE) > mals im) | + |e ww em cml earma alow ar er sm | ua maar mR ERE] | we aa a | oa apmamny | Own aR] | ea ewe | OO OS aes TS eat SS SS =aS SS oS cry afer cnc cashes ila La mee me p= ee SS aS Ti —— Sen eed ee ie eel cee SS ST Jen oa See ee Deser Te OOCPOROTTT Tasonme aces Oe OTE Fase OE This document isin copy right and contains valuable and proprietary information. No pat of this document may bo reproduced in any form or by any means without the prior permission and authorization of the Department of Energy (DoE), Abu Dhabi. THE ELECTRICITY WIRING REGULATIONS 4_4l_b_Il io DEPARTMENT OF ENERGY = ee rae ee Fa IPA Par oe ara Ime ‘Come mt meme tw) fet) ew) 3,| ] om] 9) . an Saar ea > ae a) + [= ew ve) ve ve) ae gee] en] ss] em me mar > ee ey) sew Tw ce ce aa yee ee ox) em me Fa a ee ea) |B ww Tw ve ce aa yew a ox] ew me wa > fem Rt | * [# [ew rm) tm eam ow] ew] on] om am et foray [Ona FAR 8 AOAC ice sta a RS EE TT SE A — a Sa] 3) | ee [ea Donat no DOEPOROTEOT Tanne Tce Date OTB Pose TOoTT This document isin copy right and contains valuable and proprietary information. No pat of this document may bo reproduced in any form or by any means without the prior permission and authorization ofthe Department of Energy (DoE), Abu Dhabi. THE ELECTRICITY WIRING REGULATIONS 4_4l_b_Il io DEPARTMENT OF ENERGY omer ee | sche on | |= Tent | “Povawtrece | nortan Shah) cae Ora | Paar Fie pe 8 ili 1 |g r[vfe gfe ala laial 5|3 BP bles cages eg eae Sais (al [o= l= le mae is ea ae Seiad i er eee = mz STS oes a] os 2S a mealies . croc mfp giao egies mel fap Ee fee me fom Jom Pam om ; pees ee fe tie eee ced eee fer er) pear aSoo SS Dont no DOEPOROTEOT Tanne Tce Date OTB Page TE This document isin copy right and contains valuable and proprotary information. No pat of this document may bo reproduced in any form or by any means without the prior permission and authorization ofthe Department of Energy (DoE), Abu Dhabi.

You might also like