Diseño de Canales

TAMO 1 -2
DATOS:
Qd= 0.125 [m^3/s] Cot.i= 1263.000 [m.s.n.m.] Prog.s=0+ 360
S= 0.0029 [m/m] Cot.s= 1262.000 [m.s.n.m.] L= 360 [m]
n= 0.017 [adim] Prog.i=0+ 0

Empezamos a calcular la base del canal rectangular:

Sección de Máxima eficiencia:

b=2.Yn

( )
2/3
A Yn
Q= . . S 1/2
n 2
Yn = 0.273 (m)
b= 0.546 (m)
b= 0.55 (m)

Donde obtendremos los siguientes datos:

Yn= 0.2730 [m] T= 0.5500 [m]


Yc= 0.1740 [m] D= 0.2730 [m]
A= 0.1502 [m^2] F= 0.5087 [adim]
P= 1.0960 [m] E= 0.3083 [m]
R= 0.1370 [m] V= 0.8325 [m/s]

Yn = 0,000

b = 001
1263.00
Yn = 0,000

Prog=0+0.00 1262

Prog=0+360.00
TAMO 3 - 4
DATOS:
Qd= 0.125 [m^3/s] Cot.i= 1260.400 [m.s.n.m.] Prog.s=0+ 774
S= 0.0038 [m/m] Cot.s= 1259.000 [m.s.n.m.] L= 364 [m]
n= 0.017 [adim] Prog.i=0+ 410

Empezamos a calcular la base del canal rectangular:

Sección de Máxima eficiencia:

b=2,Yn
2/3
A  Yn 
Q  .  .S 1 / 2
n  2 
Yn = 0.259 (m)
b= 0.518 (m)
b= 0.55 (m)

Donde obtendremos los siguientes datos:

Yn= 0.2590 [m] T= 0.5500 [m]


Yc= 0.1740 [m] D= 0.2590 [m]
A= 0.1425 [m^2] F= 0.5505 [adim]
P= 1.0680 [m] E= 0.2982 [m]
R= 0.1334 [m] V= 0.8775 [m/s]

Yn = 0,000

b = 001
1260.40
Yn = 0,000

Prog=0+410.00 1259

Prog=0+774.00
TAMO 5 - 6
DATOS:
Qd= 0.125 [m^3/s] Cot.i= 1259.000 [m.s.n.m.] Prog.s=1+ 174
Cot.s= 1257.200 [m.s.n.m.] L= 400 [m]
n= 0.013 [adim] Prog.i=0+ 774

Diseño de la tuberia:

Se utilizara los siguiente datos para su diseño:

* Tuberia PVC
* Coeficiente de fricción n = 0,013
* C = 140
* hf = 1,6 (m.)
10 ,64806344
mH = h f =m H . L . Q 2
D 4 . 87 . C1 .852

0 . 0011288637 D = 0.347 (m.)


D4 . 87= . L .Q 1. 852 D = 1.5 (plg.)
hf

Yn = 0,000

0.00

Prog=0+774.00 1259

Prog=1+174.00

TAMO 7 - 8
DATOS:
Qd= 0.125 [m^3/s] Cot.i= 1257.200 [m.s.n.m.] Prog.s=1+ 210
S= 0.00278 [m/m] Cot.s= 1257.100 [m.s.n.m.] L= 36 [m]
n= 0.017 [adim] Prog.i=1+ 174

Empezamos a calcular la base del canal rectangular:

Sección de Máxima eficiencia:

b=2,Yn
2/3
A  Yn 
Q  .  .S 1 / 2
n  2 
Yn = 0.275 (m)
b= 0.55 (m)
b= 0.55 (m)

Donde obtendremos los siguientes datos:

Yn= 0.2750 [m] T= 0.5500 [m]


Yc= 0.1740 [m] D= 0.2750 [m]
A= 0.1513 [m^2] F= 0.5032 [adim]
P= 1.1000 [m] E= 0.3098 [m]
R= 0.1375 [m] V= 0.8264 [m/s]

Yn = 0,000

b = 001
1257.20
Yn = 0,000

Prog=0+174.00 1257.1

Prog=0+210.00

TAMO 9 - 10
DATOS:
Qd= 0.125 [m^3/s] Cot.i= 1250.200 [m.s.n.m.] Prog.s=1+ 558
S= 0.00159 [m/m] Cot.s= 1247.600 [m.s.n.m.] L= 124 [m]
n= 0.017 [adim] Prog.i=1+ 434

Empezamos a calcular la base del canal rectangular:

Sección de Máxima eficiencia:

b=2,Yn

( )
2/3
A Yn
Q= . . S 1/2
n 2
Yn = 0.3054 (m)
b= 0.6108 (m)
b= 0.65 (m)

Donde obtendremos los siguientes datos:

Yn= 0.3054 [m] T= 0.6500 [m]


Yc= 0.1556 [m] D= 0.3054 [m]
A= 0.1985 [m^2] F= 0.3638 [adim]
P= 1.2608 [m] E= 0.3256 [m]
R= 0.1574 [m] V= 0.6297 [m/s]

Yn = 0,000

b = 001
1250.20
Yn = 0,000

Prog=0+434.00 1247.6

Prog=0+558.00

TAMO 11 - 12
DATOS:
Qd= 0.125 [m^3/s] Cot.i= 1247.800 [m.s.n.m.] Prog.s=1+ 794
S= 0.00123 [m/m] Cot.s= 1247.600 [m.s.n.m.] L= 166 [m]
n= 0.017 [adim] Prog.i=1+ 628

Empezamos a calcular la base del canal rectangular:

Sección de Máxima eficiencia:

b=2,Yn

( )
2/3
A Yn
Q= . . S 1/2
n 2
Yn = 0.320 (m)
b= 0.64 (m)
b= 0.65 (m)

Donde obtendremos los siguientes datos:

Yn= 0.3200 [m] T= 0.6500 [m]


Yc= 0.1556 [m] D= 0.3200 [m]
A= 0.2080 [m^2] F= 0.3392 [adim]
P= 1.2900 [m] E= 0.3384 [m]
R= 0.1612 [m] V= 0.6010 [m/s]

Yn = 0,000

b = 001
1247.80
Yn = 0,000

Prog=0+628.00 1247.6

Prog=0+794.00

TAMO 13 - 14
DATOS:
Qd= 0.125 [m^3/s] Cot.i= 1245.000 [m.s.n.m.] Prog.s=2+ 89.6
S= 0.0034 [m/m] Cot.s= 1244.000 [m.s.n.m.] L= 292 [m]
n= 0.017 [adim] Prog.i=1+ 797.6

Empezamos a calcular la base del canal rectangular:

Sección de Máxima eficiencia:

b=2,Yn

( )
2/3
A Yn
Q= . . S 1/2
n 2
Yn = 0.265 (m)
b= 0.53 (m)
b= 0.55 (m)

Donde obtendremos los siguientes datos:

Yn= 0.2650 [m] T= 0.5500 [m]


Yc= 0.1740 [m] D= 0.2650 [m]
A= 0.1458 [m^2] F= 0.5319 [adim]
P= 1.0800 [m] E= 0.3025 [m]
R= 0.1350 [m] V= 0.8576 [m/s]

Yn = 0,000

b = 001
1245.00
Yn = 0,000

Prog=0+797.60 1244

Prog=0+89.60

TAMO 15 - 16
DATOS:
Qd= 0.125 [m^3/s] Cot.i= 1243.600 [m.s.n.m.] Prog.s=2+ 453.6
S= 0.0045 [m/m] Cot.s= 1242.000 [m.s.n.m.] L= 330 [m]
n= 0.017 [adim] Prog.i=2+ 123.6

Empezamos a calcular la base del canal rectangular:

Sección de Máxima eficiencia:

b=2,Yn

( )
2/3
A Yn
Q= . . S 1/2
n 2
Yn = 0.251 (m)
b= 0.50 (m)
b= 0.50 (m)

Donde obtendremos los siguientes datos:

Yn= 0.2730 [m] T= 0.5000 [m]


Yc= 0.1854 [m] D= 0.2730 [m]
A= 0.1365 [m^2] F= 0.5596 [adim]
P= 1.0460 [m] E= 0.3157 [m]
R= 0.1305 [m] V= 0.9158 [m/s]

Yn = 0,000

b = 001
1243.60
Yn = 0,000

Prog=0+123.60 1242

Prog=0+453.60

TAMO 17 - 18
DATOS:
Qd= 0.125 [m^3/s] Cot.i= 1241.600 [m.s.n.m.] Prog.s=2+ 681.6
S= 0.0051 [m/m] Cot.s= 1240.8 [m.s.n.m.] L= 196 [m]
n= 0.017 [adim] Prog.i=2+ 485.6
Empezamos a calcular la base del canal rectangular:

Sección de Máxima eficiencia:

b=2,Yn

( )
2/3
A Yn
Q= . . S 1/2
n 2
Yn = 0.245 (m)
b= 0.49 (m)
b= 0.50 (m)

Donde obtendremos los siguientes datos:

Yn= 0.2730 [m] T= 0.5000 [m]


Yc= 0.1854 [m] D= 0.2730 [m]
A= 0.1365 [m^2] F= 0.5596 [adim]
P= 1.0460 [m] E= 0.3157 [m]
R= 0.1305 [m] V= 0.9158 [m/s]

Yn = 0,000

b = 001
1241.60
Yn = 0,000

Prog=0+485.60 1240.8

Prog=0+681.60

TAMO 19 - 20
DATOS:
Qd= 0.125 [m^3/s] Cot.i= 1235.950 [m.s.n.m.] Prog.s=2+ 79.6
S= 0.0028 [m/m] Cot.s= 1235.000 [m.s.n.m.] L= 356 [m]
n= 0.017 [adim] Prog.i=2+ 723.6
Empezamos a calcular la base del canal rectangular:

Sección de Máxima eficiencia:

b=2,Yn

( )
2/3
A Yn
Q= . . S 1/2
n 2
Yn = 0.275 (m)
b= 0.55 (m)
b= 0.55 (m)

Donde obtendremos los siguientes datos:

Yn= 0.2750 [m] T= 0.5500 [m]


Yc= 0.1740 [m] D= 0.2750 [m]
A= 0.1513 [m^2] F= 0.5032 [adim]
P= 1.1000 [m] E= 0.3098 [m]
R= 0.1375 [m] V= 0.8264 [m/s]

Yn = 0,000

b = 001
1235.95
Yn = 0,000

Prog=0+723.60 1235

Prog=0+79.60
DISEÑO HIDRAULICO
DE CANAL

PROGRESIVA S Q B Y A V SECCION
m/m m^3/seg. m. m. m^2 m/seg. ADOPTADA
0+000 0+360 0.0029 0.125 0.55 0.273 0.150 0.833 0,55 x 0,35
0+360 0+410 Puente acueducto
0+410 0+774 0.0038 0.125 0.55 0.262 0.144 0.867 0,55 x 0,35
0+774 1+174 Tuberia
1+174 1+210 0.00278 0.125 0.55 0.275 0.151 0.826 0,55 x 0,35
1+210 1+434 Caida escalonada y Inclinada
1+434 1+574 0.057 0.125 0.65 0.3052 0.198 0.630 0,65 x 0,35
1+574 1+644 Sifon
1+644 1+794 0.0027 0.125 0.65 0.320 0.208 0.601 0,65 x 0,35
1+794 1+797,6 Caida Vertical
1+797,6 2+089,6 0.0034 0.125 0.55 0.265 0.146 0.858 0,55 x 0,35
2+089,6 2+123,6 Puente Colgante
2+123,6 2+453,6 0.0045 0.125 0.50 0.251 0.126 0.996 0,50 x 0,35
2+453,6 2+485,6 Puente Canal
2+485,6 2+681,6 0.0051 0.125 0.50 0.245 0.123 1.020 0,50 x 0,35
2+686,6 2+723,6 Rapida
2+723,6 3+079,6 0.0028 0.125 0.55 0.275 0.151 0.826 0,50 x 0,35