You are on page 1of 3
Status ‘OnGoing Machine PRESS ROLLER DIE CUTTING MACHINE (PROO1) Assessed by BRYAN VU-WNK, ELLEN LE-WNK, BILL VO-WNK, CLOVER HUYNH-WNK + Facility Date Approved by List of Items (Wa) (Baitang 72/2022 DARREN DE WIND: WNK + 12 — = (RiskAssessmenl/StartAudiv6247riskAssessmentid-256) sb (/ContentimageCapture/202207/7d1e573d-d8a1-47 13-bbSb-8a9ea487dfa7bekjsbck PNG) Process Hazard Risk Risk Value (Priority) Existing Controls Power supply cabinet The bottom of cabinet is open, that easy for dust stick inside Fire and/ or Explosion ua) x S4) 16 None Proposed Controls Close hole. Responsible Person LE TIEN DANG-WNK, DINH VAN HONG-WNK Department incharge Plant Engineering Target Completion Date so/o7/2022 Reviewed (/RiskAssessment/ReviewAudit/624) -—~ ~\ NO IMAGE AVAILABLE _—— ‘Target Completion Date 30/07/2022; Risk Value (Priority) ly x so) 0 Proposed Further Controls: Remark 22 ‘OnGoing |] = (/RiskAssessment/StartAudit/6237riskAssessmentld=258) & ([ContentiimageCapture/202207/Saf706fc-41fe-4599-a5e5-3568866ceo66nkncldnv. PNG) Process, Power supply cabinet Hazard ‘The copper core exposed due to loose cosses or wrong connection technique Risk Fire and/ or Explosion Risk Value a) xX s@) 16 (Priority) Existing Controls None Proposed Controls Checking and reconnect Responsible Person LE TIEN DANG-WNK, DINH VAN HONG-WNK Department incharge Plant Engineering Target Completion Date 30/07/2022 Reviewed (/RiskAssessment/ReviewAudit/623) —. NO IMAGE AVAILABLE Target Completion Date 30/07/2022; Risk Value (Priority) W x so 0 Proposed Further Controls: Remark 3Q ‘OnGoing ] = (/RiskAssessmenv/StartAudiv/621 7riskAssessmentld=258) (/Content/imageCapture/202207/7176ac87-d80b-4a45-ae6c-7205a3¢15e40vivibininim|.PNG) Process Feeding Hazard Moving roller & bet, nip point exposed.

You might also like