Status ‘OnGoing
Machine PRESS ROLLER DIE CUTTING MACHINE (PROO1)
Assessed by BRYAN VU-WNK, ELLEN LE-WNK, BILL VO-WNK, CLOVER HUYNH-WNK +
Facility
Date
Approved by
List of Items
(Wa) (Baitang
72/2022
DARREN DE WIND: WNK
+
12
—
= (RiskAssessmenl/StartAudiv6247riskAssessmentid-256) sb
(/ContentimageCapture/202207/7d1e573d-d8a1-47 13-bbSb-8a9ea487dfa7bekjsbck PNG)
Process
Hazard
Risk
Risk Value (Priority)
Existing Controls
Power supply cabinet
The bottom of cabinet is open, that easy for dust stick inside
Fire and/ or Explosion
ua) x S4) 16
NoneProposed Controls
Close hole.
Responsible Person LE TIEN DANG-WNK, DINH VAN HONG-WNK
Department incharge Plant Engineering
Target Completion Date so/o7/2022
Reviewed (/RiskAssessment/ReviewAudit/624)
-—~
~\
NO IMAGE
AVAILABLE
_——
‘Target Completion Date 30/07/2022;
Risk Value (Priority) ly x so) 0
Proposed Further Controls:
Remark
22
‘OnGoing |] = (/RiskAssessment/StartAudit/6237riskAssessmentld=258) &
([ContentiimageCapture/202207/Saf706fc-41fe-4599-a5e5-3568866ceo66nkncldnv. PNG)
Process, Power supply cabinet
Hazard ‘The copper core exposed due to loose cosses or wrong connection
technique
Risk Fire and/ or Explosion
Risk Value a) xX s@) 16
(Priority)Existing Controls None
Proposed Controls
Checking and reconnect
Responsible Person LE TIEN DANG-WNK, DINH VAN HONG-WNK
Department incharge Plant Engineering
Target Completion Date 30/07/2022
Reviewed (/RiskAssessment/ReviewAudit/623)
—.
NO IMAGE
AVAILABLE
Target Completion Date 30/07/2022;
Risk Value (Priority) W x so 0
Proposed Further Controls:
Remark
3Q
‘OnGoing ] = (/RiskAssessmenv/StartAudiv/621 7riskAssessmentld=258)
(/Content/imageCapture/202207/7176ac87-d80b-4a45-ae6c-7205a3¢15e40vivibininim|.PNG)
Process Feeding
Hazard Moving roller & bet, nip point exposed.