PAK PARGIO PROYEK MASJID AGUNG SLEMAN

TanggaL 20 NOVEMBER - 26 NOVEMBER 2022


SN SLS RB KM JM SBT MG TTL TOTAL UPA Tambahan
NO NAMA JBT H H H H H H UPAH/HARI TOTAL UPAH TOTAL
LB LB LB LB LB LB HR LB HR LEMBUR
R R R R R R
1 Pargio K.Tk 2 1 1 2 1 1 Rp 130,000.00 8.0 1,040,000.00 0 0.00 Rp 1,040,000.00
2 Ahmad Tk 2 1 1 2 1 1 Rp 100,000.00 8.0 800,000.00 0 0.00 Rp 800,000.00
3 Manto Tk 2 1 1 2 1 1 Rp 100,000.00 8.0 800,000.00 0 0.00 Rp 800,000.00
4 Sagiran Tk 2 1 1 2 1 1 Rp 100,000.00 8.0 800,000.00 0 0.00 Rp 800,000.00
5 Parman Tk Rp 100,000.00 0.0 0.00 0 0.00 Rp 0.00
6 Eko Tk 2 1 1 1 1 1 Rp 100,000.00 7.0 700,000.00 0 0.00 Rp 700,000.00
7 Sunti Tk 2 1 1 1.5 1 1 Rp 100,000.00 7.5 750,000.00 0 0.00 Rp 750,000.00
8 Ridho Tk 2 1 1 2 1 1 Rp 100,000.00 8.0 800,000.00 0 0.00 Rp 800,000.00
9 Husen Tk Rp 100,000.00 0.0 0.00 0 0.00 Rp 0.00
9 Marwan Tn 2 1 1 2 1 1 Rp 90,000.00 8.0 720,000.00 0 0.00 Rp 720,000.00
9 Bagus Tn 2 1 1 1 1 Rp 90,000.00 6.0 540,000.00 0 0.00 Rp 540,000.00
JUMLAH 6,950,000.00
SATPAM MASJID 100,000.00
TOTAL Rp 7,050,000.00