You are on page 1of 1
Tr eee di K = b BS EN877 6 @ ey e Installation Recommendation of KEY Drainage System KEY Epony Cas ron Drainage System canbe installed cucy due to the hub less coupling design which can reduce note and absorb \ioraton. Therefore, proper supporttothe pipelines exenti.Couplings have undergone proved water tightness ests by ening the gasket so shoul not be lad bearing, uncer compression or prolonged stresses. This action would enhance the aging ofthe xstets. Strong and scent pipe hanger should be proved to suffer these conditions suchas al the weight of the whole pipeline, soll waste and the coresponding pressure generated by sludge, fishing & gravity For horsontal pipeline, the acces of spor flow 1) Te supports shou be installed ina regular way, 2)The matimmum snanjbetween hangers is 2,000mm (Fi. 2. 23 The maximum distant apart from coupling and hanger is SODAAA( Fe. b). 4) Every pipe/short pipe must be installed with individual hanger or support, two or more hangers should be applied while the sHOt pipe is over soomm(Fig.c). S)Every direction change nus provde the hangers placed in front of and back ofthe bend to avoid disconnection. The maximum distant apart from coupling and hanger is SOOmm. (Fig. e) 6)Angle truss or extra grip collar (Fig. d) of elbows and branches i strongly recommend to apply while the pipe Gismiterls on 6FOver “N20 wo suit incviual designs; otherwise, more suppons would be asafer and better engneering practice, "When isn contact with some heavy components seperte supports ta these components af high recommended The coupling woud be daraged by improper design or/and installation; ence, the operation ofthe pipeline and the system are also affected. Misalignment, twist or bent should be avoided. max.2000 Fae ‘max. 500 max. 500 D rao max. 800 Fig. © mee For vertical pipeline, the considerations are similar to horizontal pipeline! eli ay bb it Sigoieay bettie tex ay Ghul sine ewer edo! he sac. Tur eee sow esr ogee TE Sea R IGE AU TORTS at ‘Attention should be paidto all the lower ends of each section of the stacAibievertgal pines abgarangecinsegmmended to use on every second floor level to carry the weight of sack.

You might also like