You are on page 1of 86

Ventilation

Product catalogue 2020


for professionals

Fresh air for the residential and commercial sector


Heat recovery ventilation and air handling applications

1
Advantages
With this interactive PDF we want to ensure you quickly
find back the information you are looking for. Within this
catalogue or via direct links to our business portal.
Focus on your business, we are here to help you.

We need your feedback


Fill out 5 simple questions to help us improve this
catalogue. We ‘ve put these questions on an online
link, so we can easily process all surveys continuously.

TAKE THE ONLINE SURVEY »


INTRO
ERV/HRV BENEFITS
MODULAR L SMART
Navigation
Sidebar links

VAM/VKM
The different chapters in the
catalogue are shown at the
side. You will be taken directly
to the index page of the with
a single click.

AIR HANDLING UNITS


All page numbers clickable
Click any page number you see
and you will go directly to the page.

HRV - Heat recovery ventilation 13

ACCESSORIES
OPTIONS &
›› High efficiency 14
›› High indoor air quality 16
›› Maximum flexibility 19
›› Specifications  22

TOOLS & PLATFORMS

Links to technical documentation


On the pages with technical drawings you can
click the button above to get access to all technical
drawings available for the product.

VIEW ALL TECHNICAL DRAWINGS


ON MY.DAIKIN.EU
TECHNICAL
DRAWINGS

Click to go back
PREVIOUS
MODULAR L (SMART)

D-AHU MODULAR R

2
INTRO
ERV/HRV BENEFITS
Table
of contents

MODULAR L SMART
The widest ventilation range on the market 4

VAM/VKM
ERV / HRV - Energy/Heat recovery ventilation units 9
›› Modular L Smart (ALB-RBS/LBS)
›› VAM-FC9 / J
›› VKM-GB(M)

AIR HANDLING UNITS




Condensing units for AHU 29

Options & accessories  42

ACCESSORIES
OPTIONS &
Tools and platforms 49

Technical drawings 57
TOOLS & PLATFORMS
TECHNICAL
DRAWINGS
PREVIOUS

3
ARGUE CARDS

5 reasons
why Daikin’s ventilation range
is unique in the market

1 Market leading controls


& connectivity
›› Interlock of ventilation and air conditioning system
• Control ERV/HRV and air conditioning from 
the same controller
• Aligns the operation mode between the systems
to save energy
›› Easy integration in the total solution
• Online control and monitoring via the Daikin Cloud Service
• Full portfolio integration in the intelligent Touch Manager,
Daikin's cost-effective mini BMS
›› User-friendly controller with premium design
• Intuitive touch button control

21°C

2 Unique installation benefits


›› Integrates seamlessly in the Daikin total solution,
ensuring a single point of contact
›› Total fresh air solution with Daikin supplying both the
VAM/Modular L Smart and the electrical heater
›› Daikin AHU and condensing unit connect Plug & Play thanks to same
pipe diameters, factory mounted controls, expansion valves, etc.

4
INTRO
ERV/HRV BENEFITS
MODULAR L SMART
3 High energy efficiency Up to

VAM/VKM
›› Energy recovery of up to 92%, reducing running costs
›› Free nighttime cooling using fresh outside air
›› Inverter driven centrifugal fans
92%
energy
›› ErP compliant recovery

AIR HANDLING UNITS


4 Best comfort
›› Wide range of units to control fresh air and humidity
›› Wide range of optional filters to suit the application available up to ePM1 80% (F9)
›› Special paper heat exchanger recovers heat and moisture from extract air
to warm up and humidify fresh air to comfortable levels (VAM, VKM)

ACCESSORIES
OPTIONS &
5 Top reliability
›› Most extensive testing before new units leave the factory TOOLS & PLATFORMS
›› Widest support network and after sales service ErP
COMPLIANT
›› All spare parts available in Europe

COGNITIVE FUNCTION SCORES …

Did you know?


TECHNICAL
DRAWINGS

CO2 levels and ventilation rates all have significant,


independent impacts on cognitive function: + 61% + 101%
IN GREEN BUILDING IN ENHANCED
CONDITIONS GREEN BUILDING CONDITIONS
PREVIOUS

5
Widest range of DX integrated
ventilation on the market

Daikin offers a variety of solutions from small energy recovery


ventilation to large-scale air handling units for the provision
of fresh air ventilation to homes, or commercial premises.

Ventilation solutions

Daikin offers state-of-the-art ventilation solutions that can easily be integrated


into any project:
›› Unique portfolio within DX manufacturers
›› High-quality solutions complying with the highest Daikin quality standards
›› Seamless integration of all products to provide the best indoor climate
›› All Daikin products connected to a single controller for complete control
of the HVAC system.

Energy Recovery Ventilation

Our energy recovery units recover sensible energy (Modular L Pro / Modular L
Smart) or total (sensible + latent) energy (VAM/VKM), substantially reducing
the load on the air conditioning system up to 40%.

Ventilation with DX connection - Control over fresh air temperature

Daikin offers a range of inverter condensing units to be used in combination with


Daikin AHUs for ultimate control over the fresh air. There are 4 control possibilities
when combining AHU and Daikin outdoor units hence offering all the required
flexibility for any installation. Indoor units can be combined to the same outdoor
unit to reduce the installation costs. For false-ceiling installations where space
is a constraint, the VKM can fit perfectly to deliver fresh air at a comfortable
temperature and it has an optional humidification element.

6
INTRO
ERV/HRV BENEFITS
Five components of indoor air quality
Ventilation
›› Ventilation: Ensures the provision of fresh air
›› Energy recovery: Delivers energy savings by transferring heat and
moisture between airflows Energy

MODULAR L SMART
Humidification
›› Air processing: Delivers the right supply temperature to decrease the recovery
indoor unit load
›› Humidification: Ensures relative indoor humidity levels are respected
›› Filtration: Separates pollen, dust and pollution odours that are harmful
to individuals’ health Air
Filtration
processing

VAM/VKM
Fresh air portfolio

AIR HANDLING UNITS


150 500 1,000 2,000 2,500 3,000 3,500 15,000 25,000 140,000 [m3/h]

›› High efficiency counterflow heat exchanger


›› Free-cooling operation
›› EC centrifugal fan
›› Wide range of options
D-AHU MODULAR L (SMART)
Decentralised systems

›› Smart version connects Plug & Play


to Sky Air / VRV systems
›› Compact size
›› High energy efficient paper recovering sensible and latent heat

ACCESSORIES
OPTIONS &
›› EC fan motors
›› Filter clogging alarm based on pressure
VAM-FC9 / VAM-J

›› With DX coil for post-treated fresh air


›› Increased comfort
›› Humidifier option TOOLS & PLATFORMS
VKM-GB(M)
›› High efficiency aluminium plate heat exchanger
›› Pre-configured sizes
›› Plug & Play pre-configured controls
›› With DX or water coil option
D-AHU MODULAR P

›› Rotary heat exchanger (sorption and sensible technology)


Centralised systems

›› Pre-configured sizes
›› Plug & Play pre-configured controls
TECHNICAL
DRAWINGS

›› With DX or water coil option


D-AHU MODULAR R

›› Fully customizable
›› Plug & play
›› 4 types of control
›› With DX or water coil option
PREVIOUS

D-AHU Professional

7
Direct integration into the Sky
Air or VRV control solution
› Saves up to 40% in running costs
› Unified control point for the complete air
conditioning and ventilation installation

Wide range of decentralised


ERV/HRV units to suit the
building needs

8
INTRO
Energy / Heat Recovery

ERV/HRV BENEFITS
Ventilation
Ventilation Interlocked with

MODULAR L SMART
air conditioning system

VAM/VKM
AIR HANDLING UNITS
ACCESSORIES
OPTIONS &
Premium efficiency heat recovery unit
Modular L (Smart) (ALB-(RBS/LBS)) 17

›› Heat recovery unit


›› Counter flow plate heat exchanger
›› ESP up to 600 Pa TOOLS & PLATFORMS
›› Operates as stand-alone or combined
with Sky Air or VRV systems

Energy recovery ventilation (VAM-FC9/J) 22


›› Heat and moisture recovery
›› Achieve free cooling with fresh outdoor air
›› Operates as stand-alone or combined
with Sky Air or VRV systems

Energy recovery ventilation with humidification


TECHNICAL
DRAWINGS

and air processing (VKM-GB(M)) 22

›› Heat and moisture recovery


›› Humidification and air processing (preconditioning)
of fresh air
›› Achieve free cooling with fresh outdoor air
›› Plug & Play piping and wiring connection
with Daikin VRV unit(s)
PREVIOUS

9
Benefits of
Daikin ERV/HRV systems

10
INTRO
1 Market leading controls & connectivity

Interlock of the ventilation operation with the air conditioner operation

ERV/HRV BENEFITS
Interlock of the ventilation operation with By incorporating a variety of centralised control
the air conditioner operation greatly simplifies equipments, the user can build a large,
overall system control. The same remote controller high grade centralised control system.
provides air conditioning and ventilation functions.

MODULAR L SMART
VRV or Sky Air indoor unit

VAM/VKM
INTERLOCKING

AIR HANDLING UNITS


User-friendly wired remote contoller with premium design

ACCESSORIES
OPTIONS &
White Silver Black

BRC1H519W7/S7/K7
›› Sleek and elegant design
›› Intuitive touch button control
›› 3 color versions
›› Advanced settings and monitoring can TOOLS & PLATFORMS
be easily done via your smartphone Advanced user settings Field settings
›› Flat back for easy wall installation
›› Compact to fit standard size socket boxes

One
Stop
Plug & Play - integrated ventilation
TECHNICAL
DRAWINGS

Shop
›› One-stop shop for all system components,
which results in streamlined design
and business solutions.
›› Efficient project follow-up, installation and
subsequent commissioning and maintenance.
›› Ventilation easily interlocked to air conditioner
operation thanks to simplified system control.
PREVIOUS

22 + + + +

11
2 Easy and flexible installation

High Static Pressure


External static pressure (ESP) up to 600 Pa (ALB)
facilitates the use of ducts of varying lengths.

Automatic Airflow External static pr essure (Pa)


Adjustment function
Automatically selects the most appropriate fan curve to achieve
Fan characteristic
the units’ nominal air flow within ±10%. curves

Why?

After installation the real ducting will frequently differ from the
initially calculated air flow resistance  the real air flow may be
much lower or higher than designed.

The airflow Adjustment function will automatically adapt the unit’s Duct resistance
matic adjustment )
fan speed to any ducting automatically (45 fan curves are ­available curves
on every model (ALB/VAM)), making installation much faster.

± /min)

Wide operation range ALB VAM VKM


The ERV/HRV unit can be installed practically 50°
45°CDB 46°CDB 40°CDB
anywhere. The standard operation range (outdoor
temperature) is from -15°C to 40°CDB for VKM 40°
units, from -10ºC (+5ºC in case of upside-down
installation) to 46ºCDB for VAM units, and can be 30°
extended down if a Daikin heater is installed.
1
Contact your local dealer for more information and restrictions 20°

10°

0° -5°
with optional

CDB -10°
heater

-10° CDB -15°


optional

optional
heater

heater
with

with

CDB
-20°
… … …

Optional heater Optional heater


for VAM for Modular L Smart

12
INTRO
Flexible installation
280mm
Slim Design

ERV/HRV BENEFITS
At just 280 mm high, the slim design of
ALB02*
the HRV unit enables it to be mounted in narrow
ceiling cavities and irregularly shaped spaces

ERV/HRV model: AHU


Standard air
ON
handling unit:
Flexible ERV/HRV
ON CENTRAL CONTROL
Compared to a standard air handling unit,

MODULAR L SMART
the HRV models provide much greater flexibility INDIVIDUAL
ERV/HRV
to match the actual building use, in case of a multi- CONTROL
OFF
tenant installation. Additionally, the renovation of a
building can be carried out in phases.
GREATER ERV/HRV

FLEXIBILITY ON

“Super Wiring” System

VAM/VKM
A Super Wiring system is used to enable the shared system with a centralised remote control, simply by
use of wiring between indoor units, outdoor units connecting it to the outdoor units. Thanks to a non
and the centralised remote control. This system polarity wiring system, incorrect connections are
makes it easy for the user to retrofit the existing avoided and installation time is reduced.

AIR HANDLING UNITS


Indoor
unit

ALB-RBS/LBS VAM/VKM
Wired remote control Outdoor unit

ACCESSORIES
OPTIONS &
TOOLS & PLATFORMS

Connection to field-supplied booster fan increases flexibility even more


›› Longer ducting or use of central duct possible ›› Lower cost by using the booster fan instead
›› Overcomes actual field situation when ducting is of replacing with a larger unit when the ESP is
different from calculation not matched

Example when HRV ESP is not high enough or field situation differs from calculation
TECHNICAL
DRAWINGS

No booster fan with booster fan

HRV HRV
PREVIOUS

Comfort Comfort Discomfort Comfort Comfort Comfort

13
3 High efficiency

Energy saving ventilation via heat recovery


of both heat and humidity

Daikin’s ERV/HRV solutions prevent energy being


Recovers up to wasted by recovering up to 92% waste heat from
the extract air instead of simply expelling the heat,

92% offering high energy efficiency.

of wasted
energy ALB-RBS/LBS

Reduce the load on the air conditioning system by up to 40%


›› 24% by using heat recovery ventilation (in comparison with normal ventilation fans)
›› 6% by switching over to auto-ventilation mode
›› 2% by using the pre-cool, pre-heat control (reduces air conditioning load
by running the HRV unit after the air conditioning is switched on)
›› 5% by enabling the free cooling operation overnight
›› 3% by preventing over-ventilation with the optional CO2 sensor

Different operation modes of ERV/HRV units

Heat exchange mode Bypass mode


Heat exchanger element
Exhaust fan Damper (heat recovery)

EA RA EA RA

Automatic
changeover
OA SA OA SA

Air supply fan

EA: Exhaust air  RA: Return air (from room)  OA: Outdoor air  SA: Supply air (to room)

14
Heat recovery ventilation

INTRO
Nighttime free cooling
Nighttime free cooling operation is an energy saving free cooling reduces the cooling load when
function operating at night when the air conditioning air conditioning is switched on in the morning,

ERV/HRV BENEFITS
is switched off. By ventilating rooms containing office reducing the daily running costs.
equipment that increases room temperature,

The VAM and Modular L Smart can also perform nighttime free cooling in stand alone operation. The set temperature is a field setting at installation.

+ OFF OFF OFF +


Free

MODULAR L SMART
A/C Ventilation Only ventilation A/C Ventilation
40°C cooling
Set temperature
30°C Indoor temperature
Outdoor temperature

20°C

… 5 PM 9 AM …

VAM/VKM
Prevent energy losses from over-ventilation with CO2 sensor

AIR HANDLING UNITS


Enough fresh air is needed to create an enjoyable can be installed which switches off the ventilation
environment, but ventilating constantly is leading system when there is enough fresh air in the room,
to energy waste. Therefore an optional CO2 sensor thus saving energy.

Example of CO2 sensor operation in a meeting room: CO2 level


Fixed ventilation rate
9 AM 12 PM 5 PM Ventilation amount

ACCESSORIES
Decrease in air volume and more energy

OPTIONS &
saving compared to fixed ventilation rate

Increase in air
volume and
better comfort
When many people are in the room,
compared to fixed
more fresh air is brought in to maintain
ventilation rate TOOLS & PLATFORMS
comfortable CO2 levels. When fewer
people are in the room, energy is saved
by bringing in less fresh air.

7 8 9 10 11 12 13 14 15 16 17 18 19 hour

Morning meeting Lunch time Meeting


TECHNICAL
DRAWINGS

Up to 75% less energy consumed for ventilation in Herten building


A two-year test at a ‘netZero Energy Building’ in Herten has revealed that a huge energy saving is
possible by using CO2 sensors in conjunction with the Daikin VAM systems.
PREVIOUS

15
4 Best Comfort
• High quality indoor air
• Whisper quiet

Optional medium and fine


dust filters available The optional filter
comply with ISO 16890
Optional filters up to ePM1 70% (F8) for VAM and ePM1
80% (F9) for ALB are available to meet your customer
request or the local legislation.

Can operate in over and underpressure


to prevent unpleasant odours
The user can select 2 fresh-up modes via the remote control for a more comfortable air environment.

1. Supply rich mode (overpressure): 2. Exhaust fresh-up (underpressure):

A higher air supply than air exhaust maintains proper A higher exhaust air than air supply decreases room
room pressure to prevent back-flow of toilet/kitchen pressure to prevent the leaking of odours or floating
odours or moisture inflow. bacteria and viruses into other rooms.

Portion of fresh-up Air exhaust


HRV
operation HRV Normal Hallway
Air supply
Air exhaust ventilation fan

Office area Sanitary 70%


30% Patient room
area Portion of
Air supply 70% or toilet 100%
exhaust
100% operation

Relative humidity (%)


30%

eg. Office eg. Hospital


Preventing that toilet odours flow to the office. No bacteria can flow from the patient room to the hallway.

Low operation sound level


Continuous research by Daikin into reducing
operation sound levels has resulted in sound pressure
levels down to 20.5dBA (VAM150). DBA PERCEIVED LOUDNESS SOUND

0 Treshold of hearing -

Daikin ERV/HRV unit 20

40
Extremely soft

Very soft
Rustling leaves

Quiet room
60 Moderately loud Normal conversation

80 Very loud City traffic noise

100 Extremely loud Symphonic orchestra

120 Threshold of feeling pain Jet taking off

16
INTRO
Modular L Smart

ERV/HRV BENEFITS
Premium Efficiency Heat Recovery Unit

MODULAR L SMART
Ventilation

Energy
Humidification
recovery

Air
Filtration
processing

VAM/VKM
AIR HANDLING UNITS
ALB-RBS/LBS

ACCESSORIES
Highlights Heat exchanger

OPTIONS &
›› Connects Plug&Play into the Sky Air ›› Premium quality counter flow plate
and VRV control network heat exchanger
›› Easy installation and commissioning ›› Up to 92% of the thermal energy recovered
›› Internal pre-filter stage (up to ePM1 50% (F7) ›› High grade aluminum allowing optimum
+ ePM1 80% (F9)) making the unit reach highest corrosion protection
indoor air quality requirements. TOOLS & PLATFORMS
›› Wide air flow coverage from 150m3/h
to 3,450m3/h
›› Exceeding ErP 2018 requirements
›› Best choice when compactness is needed
(only 280 mm height up to 550 m3/h)
›› 50 mm double skin panel (120 kg/m3) for
a maximum sound and thermal insulation

EC centrifugal fan
TECHNICAL
DRAWINGS

›› Maximum ESP available 600 Pa


(depending on model sizes and airflow)
›› Inverter driven with IE4 premium efficiency motor
›› High-efficient blade profiling
›› Reduced energy consumption ErP
COMPLIANT
›› Optimized SFP (Specific Fan Power)
for an efficient unit operation
PREVIOUS

17
Premium quality to meet
most sophisticated needs

Heat exchanger
› Premium quality counterflow
plate heat exchanger
› Up to 92% of the thermal energy
recovered
› High grade aluminium that allows
best corrosion protection
› Completely joint sealing
› No screws or rivets in any part

Filters
› Easy replaceable compact filters
with large surface area, which can
be removed from bottom access
› Up to ePM1 50% (F7) + ePM1
80% (F9) filtration efficiency
› No tools are needed to change the filters
› Fresh air filters* (ePM1 50% (F7)
efficiency as standard)
› Return filters* (ePM10 75% (M5)
efficiency as standard)

*Optional additional filter and pre-filter stage coarse 55%


(G4), ePM10 75% (M5), ePM1 50% (F7), ePM1 80% (F9)

Supply/Return fan
› Fan/motor combination with very
low noise level
› Reduced energy consumption
› Inverter driven with IE4 motor efficiency
› Infinitely variable speed
› Ultra-efficient blade profiling
› Maintenance-free ball bearings
› No screws or rivets in any part

18
INTRO
ERV/HRV BENEFITS
MODULAR L SMART
VAM/VKM
AIR HANDLING UNITS
ACCESSORIES
OPTIONS &
Rectangular duct flange
The standard dimensions are:

› 250x150 mm (Size 2)
› 400x200 mm (Size 3)
› 500x300 mm (Size 4/5) TOOLS & PLATFORMS
› 700x400 mm (Size 6/7)

› Optional rectangular to circular transition

Unit structure Bypass damper


› External pre-painted metal sheet › 100% automatic bypass damper
TECHNICAL
DRAWINGS

› Internal Aluzinc metal sheet with proportional opening for antifreeze


› 50 mm Double skin panel thickness function and free cooling operation
› Mineral wool insulated
› Great sound absorption
› Hinged or fully removable bottom doors make Full integration in the DIII
the unit easily accessible for service and maintenance
› Unit is accessible from bottom panels network (Sky Air and VRV)
› Best choice when compactness is needed
(only 280 mm height for up to 550 m3/h of air flow)
PREVIOUS

19
Technical details

Control logic

› Air quality analysis with the capability of monitoring and control of the actual level of CO2 through optional sensor (option)
› Full automatic bypass to manage free cooling
› Filter alarm in accordance with the EU Reg 1253
› DIII-net integration through Daikin building air conditioning control systems (D-BACS)
› BMS integration through dedicated interfaces (Modbus, BACnet)

Air flow range

Modular L Smart is available in 6 sizes covering a wide range of applications such as hotels, offices, schools and light commercial buildings

Size 3000

2300 Size 7

1500 Size 6

1200 Size 5

600 Size 4

300 Size 3

Size 2

500 1500 2500 3500


1000 2000 3000
Airflow rate (m3/h)
Max airflow calculated @100Pa of
external static pressure (ESP) From 150 up to 3450 m3/h
Nominal airflow m3/h

20
INTRO
ERV/HRV BENEFITS
MODULAR L SMART
Return Air Fresh Air Fresh Air Return Air

Supply Air Exhaust Air Exhaust Air Supply Air

VAM/VKM
Right drain connection (ALB-RBS) Left drain connection (ALB-LBS)

Technical details

AIR HANDLING UNITS


D-AHU Modular L Smart ALB-RBS/LBS 02 03 04 05 06 07
Airflow m3/h 300 600 1200 1500 2300 3000
Heat exchanger thermal efficiency1 % 90 91 90 90 92 91
External static pressure Nom. Pa 100 100 100 100 100 100
Temperature after heat exchanger1 Nom. °C 19,4 19,5 19,4 19,2 19,8 19,5
Max ESP @ nom. airflow Pa 400 450 260 270 250 210
Current Nom. A 0,52 1,17 1,91 2,48 3,76 5,39
Power input Nom. kW 0,12 0,27 0,44 0,57 0,87 1,24

ACCESSORIES
OPTIONS &
SFPv2 kW/m3/s 1,24 1,49 1,28 1,32 1,32 1,46
ERP compliant ErP 2018 Compliant
Electrical supply Phase ph 1 1 1 1 1 1
Frequency Hz 50/60 50/60 50/60 50/60 50/60 50/60
Voltage V 220/240 Vac 220/240 Vac 220/240 Vac 220/240 Vac 220/240 Vac 220/240 Vac
Main unit dimensions Width mm 920 1100 1600 1600 2000 2000
TOOLS & PLATFORMS
Height mm 280 350 415 415 500 500
Length mm 1660 1800 2000 2000 2000 2000
Rectangular duct flange Width mm 250 400 500 500 700 700
Height mm 150 200 300 300 400 400
Unit Sound Power Level (LWA) dB 48 54 57 53 60 57
Unit Sound Pressure Level3 dBA 34 39 41 37 44 41
Weight unit kg 125 180 270 280 355 360
1. Winter design condition: Outdoor: -5°C, 90% Indoor: 22°C,50%
2. SFPv is a parameter that quantifies the fan efficiency (the lower it is the better will be). This reduces if airflow decreases.
TECHNICAL
DRAWINGS

3. According to EN3744. Surrounding, Directivity (Q) = 2, @ 1,5m distance


PREVIOUS

21
ERV
energy recovery ventilation
Heat recovery ventilation, air processing and humidification

Ventilation Ventilation

Energy Energy
Humidification Humidification
recovery recovery

Air Air
Filtration Filtration
processing processing

VAM-FC9 / VAM-J VKM-GB(M)

High efficiency Maximum flexibility

›› Energy saving ventilation via enthalpy recovery ›› Plug & Play - integrated ventilation
of both heat and humidity ›› Flexible installation
›› Reduce the load on the air conditioning system ›› Wide range of units
by up to 40% ›› High static pressure
›› Nighttime free cooling ›› Wide operation range
›› Prevent energy losses from over-ventilation ›› Connection to field-supplied booster fan
with CO2 sensor increases flexibility even more (VAM-FC9/J only)
›› No drain needed (VAM-FC9/J only)

High indoor air quality & whisper


quiet operation
›› Optional medium and fine dust filters
(VAM-FC9/J only)
›› Can operate in over and underpressure to prevent
unpleasant odours
›› Low operation sound level

22
INTRO
ERV/HRV BENEFITS
Energy saving ventilation via enthalpy recovery
of both heat and humidity

MODULAR L SMART
Daikin’s ERV solutions prevent energy being wasted Specially developed heat exchange element
Recovers up to by recovering up to 85% waste heat from the extract
air instead of simply expelling the heat, offering high The heat exchange element rapidly recovers heat

85% energy efficiency. contained in latent heat (vapour).

of waste heat

VAM/VKM
Outdoor Indoor
SA
Operation of the high 30.6°C 27.4°C Temperature SA
efficiency paper. 62% RH 63% RH and humidity
are exchanged
Cross flow of air
between the
to exchange heat RA
32°C RA layers
and moisture.
70% RH 26°C
50% RH

AIR HANDLING UNITS


Integrally-formed liner

RH: Relative Humidity


SA: Supply Air (to room)
RA: Return Air (from room)

High indoor comfort


Thanks to the heat and moisture exchange, the hot
and humid outside air is brought to levels close to
indoor conditions saving on the air conditioning

ACCESSORIES
running cost and maintaining comfort.

OPTIONS &
Can be installed Horizontal installation Vertical installation
TOOLS & PLATFORMS

horizontally, upside down Ceiling Ceiling

or vertically
False ceiling Access
The VAM models do not require a drain, giving hatch
greater flexibility for the installation of the units.

In case of upside down or vertical installation


Switch box
TECHNICAL
DRAWINGS

the  minimum fresh air temperature is +5°C


instead of -10°C.

Add a heater to reach this condition, if necessary.

Access
hatch
Maintenance cover
PREVIOUS

23
Creating a high quality environment
Maintain a comfortable indoor environment without fluctuations in room temperature.

How do the VKM units work?

In heating In cooling

Heat recovery Heat recovery


+ +
Heating Cooling 100 80
+ 100 80
60

Humidifying 60
Outdoor air
temperature
Effect of full heat exchange in summer
Effect of cooling
1
40

40 2

Indoor temperature during cooling

Effect of 20
Indoor temperature during heating humidification
3 20
2
Relative humidity (%)

Outdoor air 1 Effect of


temperature in winter
heating
Effect of full heat exchange

-5 0 5 10 15 20 25 30 35 40 -5 0 5 10 15 20 25 30 35 40

Dry bulb temperature (°CDB) Dry bulb temperature (°CDB)

In heating we bring in cold outdoor fresh air and want to avoid cold draught In cooling we bring in hot outdoor fresh air and want to prevent additional load on
and dry air. the air conditioning system and too hot indoor temperatures.

1.  Cold outside air is crossed with hot inside air. 1.  Hot outside air is crossed with cold inside air.
In the example the fresh air is heated up from 0 to 16°CDB while keeping In the example the fresh air is cooled down from 34 to 27°CDB while keeping
the same relative humidity. This is the effect of the heat and moisture exchange. the same relative humidity. This is the effect of the heat and moisture exchange.

2.  The DX coil further cools down the air to prevent hot indoor temperatures
2.  The DX coil further heats up the air to prevent cold draught. In the example
and reduce the load on the air conditioning system.
the fresh air is further heated from 16 to 34°CDB. Because the air is heated up
the relative humidity decreases. In the example the fresh air is further cooled down from 27 to 20°CDB.

3.  To counter negative effects of dry air the air passes the humidifier which adds
moisture in case needed. 3.  No humidification is needed in cooling as the air is not dried out.
In the example the relative humidity rises from 22 to a comfortable 42%.

The result is fresh air with the same humidity and slightly higher temperature
The result is fresh air with a slightly lower temperature for perfect comfort.
for perfect comfort.

24
INTRO
ERV/HRV BENEFITS
MODULAR L SMART
Humidification

Operation example: humidification & air processing (heating mode)1

VAM/VKM
Heat Exchanger
Exhaust Fan Damper Motor DX coil (Direct expansion coil)

AIR HANDLING UNITS


Elements
EA Damper
(Exhaust air to outdoors)

OA
(Fresh air from outdoors)

RA

ACCESSORIES
(Return air from room)

OPTIONS &
Air Supply Fan SA (Supply air to room)

Electronics Box (Control box)

TOOLS & PLATFORMS

Float switch Solenoid


Humidifier element: valve
Utilizing the principle of capillary action, water
is permeated throughout the humidifier element.
The heated air from the DX coil passes through water
the humidifier and absorbs the moisture. SA
AIRFLOW
TECHNICAL
DRAWINGS

Drain pan Drain

1
VKM-GM example
PREVIOUS

25
VAM-FC9/VAM-J
Diamond
Energy recovery ventilation Return air
shape heat
Supply air exchanger!
Ventilation with heat recovery as standard

›› Thinnest High Efficiency Enthalpy Heat Exchanger


in the market (J-series)
›› Energy saving ventilation using indoor heating,
cooling and moisture recovery
›› Free cooling possible when outdoor temperature
is below indoor temperature (eg. during nighttime) Exhaust air
›› Prevent energy losses from over-ventilation while Fresh air
improving indoor air quality with optional CO2 sensor
›› Possibility to change ESP via wired remote control allows
optimisation of the supply air volume (J - series)
›› Can be used as stand alone or integrated in the Sky Air
or VRV system
›› Wide range of units: air flow rate from 150 up to 2,000 m³/h
›› Shorter installation time thanks to easy adjustment High efficiency filters available:
of nominal air flow rate, so less need for dampers compared ePM10 70% (M6), ePM1 55% (F7) and ePM1 70% (F8)
with traditional installation
›› No drain piping needed
›› Can operate in over- and under pressure
›› Total solution for fresh air with Daikin supply
of both VAM / VKM and electrical heaters ErP
COMPLIANT

Ventilation VAM/VAM 150FC9 250FC9 350J 500J 650J 800J 1000J 1500J 2000J
Power input - 50Hz Heat Nom. Ultra high/High/Low kW 0.132/0.111/ 0.161/0.079/ 0.097 /0.070 / 0.164 /0.113 / 0.247 /0.173 / 0.303 /0.212 / 0.416 /0.307 / 0.548 /0.384 / 0.833 /0.614 /
exchange
mode 0.058 0.064 0.039 0.054 0.081 0.103 0.137 0.191 0.273
Bypass mode Nom. Ultra high/High/Low kW 0.132/0.111/ 0.161/0.079/ 0.085 /0.061 / 0.148 /0.100 / 0.195 /0.131 / 0.289 /0.194 / 0.417 /0.300 / 0.525 /0.350 / 0.835 /0.600 /
0.058 0.064 0.031 0.045 0.059 0.086 0.119 0.156 0.239
Temperature Ultra high/High/Low % 77.0 (1) / 72.0 (2)/ 74.9 (1) / 69.5 (2)/
85.1 /86.7 / 80.0 /82.5 / 84.3 /86.4 / 82.5 /84.2 / 79.6 /81.8 / 83.2 /84.8 / 79.6 /81.8 /
exchange 78.3 (1) / 72.3 (2)/ 76.0 (1) / 70.0 (2)/
90.1 87.6 90.5 87.7 86.1 88.1 86.1
efficiency - 50Hz 82.8 (1) / 73.2 (2) 80.1 (1) / 72.0 (2)
Enthalpy exchange Cooling Ultra high/High/Low % 60.3 (1)/61.9 (1)/ 60.3 (1)/61.2 (1)/ 65.2 /67.9/ 59.2 /61.8 / 59.2 /63.8 / 67.7 /70.7 / 62.6 /66.4 / 68.9 /71.8 / 62.6 /66.4 /
efficiency - 50Hz 67.3 (1) 64.5 (1) 74.6 69.5 73.1 76.8 74.0 77.5 74.0
Heating Ultra high/High/Low % 66.6 (1)/67.9 (1)/ 66.6 (1)/67.4 (1)/ 75.5 /77.6 / 69.0 /72.2 / 73.1 /76.3 / 72.8 /75.3 / 68.6 /71.7 / 73.8 /76.1 / 68.6 /71.7 /
72.4 (1) 70.7 (1) 82.0 78.7 82.7 80.2 77.9 80.8 77.9
Operation mode Heat exchange mode, bypass mode, fresh-up mode
Heat exchange system Air to air cross flow total heat (sensible + latent heat) exchange
Heat exchange element Specially processed non-flammable paper
Dimensions Unit HeightxWidthxDepth mm 285x776x525 301x1,113x886 368x1,354x920 368x1,354x1,172 731x1,354x1,172
Weight Unit kg 24.0 46.5 61.5 79.0 157
Casing Material Galvanised steel plate
Fan Air flow Heat Ultra high/High/ m³/h 350 (1)/ 500 (1)/ 650 (1)/ 800 (1)/ 1,000 (1)/ 1,500 (1)/ 2,000 (1)/
exchange Low 150 /140 /105 250 /230 /155 300 (1)/ 425 (1)/ 550 (1)/ 680 (1)/ 850 (1)/ 1,275 (1)/ 1,700 (1)/
rate - mode 200 (1) 275 (1) 350 (1) 440 (1) 550 (1) 825 (1) 1,100 (1)
50Hz Bypass mode Ultra high/High/ m³/h 350 (1)/ 500 (1)/ 650 (1)/ 800 (1)/ 1,000 (1)/ 1,500 (1)/ 2,000 (1)/
Low 150 /140 /105 250 /230 /155 300 (1)/ 425 (1)/ 550 (1)/ 680 (1)/ 850 (1)/ 1,275 (1)/ 1,700 (1)/
200 (1) 275 (1) 350 (1) 440 (1) 550 (1) 825 (1) 1,100 (1)
External static Ultra high/High/Low Pa 90 /87/40 70 /63/25 90 (1)/70.0 /50.0 (1)
pressure - 50Hz
Air filter Type Multidirectional fibrous fleeces Multidirectional fibrous fleeces (G3)
Sound pressure Heat Ultra high/High/Low dBA 27.0 /26.0 28.0 /26.0 34.5 (1)/ 37.5 (1)/ 39.0 (1)/ 39.0 (1)/ 42.0 (1)/ 42.0 (1)/ 45.0 (1)/
exchange 32.0 (1)/ 35.0 (1)/ 36.0 (1)/ 36.0 (1)/ 38.5 (1)/ 39.0 (1)/ 41.5 (1)/
level - 50Hz mode /20.5 /21.0 29.0 (1) 30.5 (1) 31.0 (1) 30.5 (1) 32.5 (1) 33.5 (1) 36.0 (1)
Bypass Ultra high/High/Low dBA 27.0 /26.5 28.0 /27.0 34.5 (1)/ 38.0 (1)/ 38.0 (1)/ 40.0 (1)/ 42.5 (1)/ 42.0 (1)/ 45.0 (1)/
/20.5 /21.0 32.0 (1)/ 35.0 (1)/ 34.5 (1)/ 36.5 (1)/ 40.0 (1)/ 39.0 (1)/ 41.0 (1)/
mode 28.0 (1) 29.5 (1) 30.5 (1) 30.5 (1) 32.5 (1) 32.5 (1) 35.0 (1)
Operation range Around unit °CDB - 0°C~40°CDB, 80% RH or less
Connection duct diameter mm 100 150 200 250 2x250
Power supply Phase/Frequency/Voltage Hz/V 1~ ; 50/60 ; 220-240/220
Current Maximum fuse amps (MFA) A 15.0 16.0
Specific energy Cold climate kWh/(m².a) -56.0 (5) -60.5 (5) -
consumption (SEC) Average climate kWh/(m².a) -22.1 (5) -27.0 (5) -
Warm climate kWh/(m².a) -0.100 (5) -5.30 (5) -
SEC class D / See note 5 B / See note 5 -
Maximum flow rate Flow rate m³/h 130 207 -
at 100 Pa ESP Electric power input W 129 160 -
Sound power level (Lwa) dB 40 43 51 54 58 61 62 65
Annual electricity consumption kWh/a 18.9 (5) 13.6 (5) -
Annual heating Cold climate kWh/a 41.0 (5) 40.6 (5) -
saved Average climate kWh/a 80.2 (5) 79.4 (5) -
Warm climate kWh/a 18.5 (5) 18.4 (5) -
(1)Measured according to JIS B 8628 | (2)Measured at reference flow rate according to EN13141-7 | (5) At reference flow rate in accordance with commission regulation (EU) No 1254/2014

26
VKM-GB/VKM-GBM

INTRO
Energy recovery ventilation,
humidification
and air processing

ERV/HRV BENEFITS
Post heating or cooling of fresh air for lower
load on the air conditioning system

›› Energy saving ventilation using indoor heating,


cooling and moisture recovery
›› Creates a high quality indoor environment by pre conditioning
of incoming fresh air

MODULAR L SMART
VKM80-100GB(M)
›› Humidification of the fresh air results in comfortable
indoor humidity level, even during heating
›› Free cooling possible when outdoor temperature is below
indoor temperature (eg. during nighttime)
›› Low energy consumption thanks to DC fan motor
›› Prevent energy losses from over-ventilation while improving
indoor air quality with optional CO2 sensor
›› Shorter installation time thanks to easy adjustment
of nominal air flow rate, so less need for dampers compared
with traditional installation

VAM/VKM
›› Specially developed heat exchange element
with High Efficiency Paper (HEP)
›› Can operate in over- and under pressure

AIR HANDLING UNITS


ACCESSORIES
Ventilation VKM-GB/VKM-GBM 50GB 80GB 100GB 50GBM 80GBM 100GBM

OPTIONS &
Power input - 50Hz Heat exchange Nom. Ultra high/ kW 0.270/0.230/ 0.330/0.280/ 0.410/0.365/ 0.270/0.230/ 0.330/0.280/ 0.410/0.365/
mode High/Low 0.170 0.192 0.230 0.170 0.192 0.230
Bypass mode Nom. Ultra high/ kW 0.270/0.230/ 0.330/0.280/ 0.410/0.365/ 0.270/0.230/ 0.330/0.280/ 0.410/0.365/
High/Low 0.140 0.192 0.230 0.170 0.192 0.230
Fresh air Cooling kW 4.71 / 1.91 / 3.5 7.46 / 2.96 / 5.6 9.12 / 3.52 / 7.0 4.71 / 1.91 / 3.5 7.46 / 2.96 / 5.6 9.12 / 3.52 / 7.0
conditioning load Heating kW 5.58 / 2.38 / 3.5 8.79 / 3.79 / 5.6 10.69 / 4.39 / 7.0 5.58 / 2.38 / 3.5 8.79 / 3.79 / 5.6 10.69 / 4.39 / 7.0
Temperature Ultra high/High/Low %
exchange efficiency 76/76/77.5 78/78/79 74/74/76.5 76/76/77.5 78/78/79 74/74/76.5
- 50Hz
Enthalpy exchange Cooling Ultra high/High/Low % 64/64/67 66/66/68 62/62/66 64/64/67 66/66/68 62/62/66 TOOLS & PLATFORMS
efficiency - 50Hz Heating Ultra high/High/Low % 67/67/69 71/71/73 65/65/69 67/67/69 71/71/73 65/65/69
Operation mode Heat exchange mode / Bypass mode / Fresh-up mode
Heat exchange system Air to air cross flow total heat (sensible + latent heat) exchange
Heat exchange element Specially processed non-flammable paper
Humidifier System - Natural evaporating type
Dimensions Unit HeightxWidthxDepth mm 387x1,764x832 387x1,764x1,214 387x1,764x832 387x1,764x1,214
Weight Unit kg 94 110 112 100 119 123
Casing Material Galvanised steel plate
Fan-Air flow rate Heat exchange mode Ultra high/High/Low m³/h 500/500/440 750/750/640 950/950/820 500/500/440 750/750/640 950/950/820
- 50Hz Bypass mode Ultra high/High/Low m³/h 500/500/440 750/750/640 950/950/820 500/500/440 750/750/640 950/950/820
Fan-External static Ultra high/High/Low Pa
210/170/140 210/160/110 150/100/70 200/150/120 205/155/105 110/70/60
pressure - 50Hz
Air filter Type Multidirectional fibrous fleeces
Sound pressure Heat exchange mode Ultra high/High/Low dBA 39/37/35 41.5/39/37 41/39/36.5 38/36/34 40/37.5/35.5 40/38/35.5
level - 50Hz Bypass mode Ultra high/High/Low dBA 40/38/35.5 41.5/39/37 41/39/36.5 39/36/34.5 41/38/36 41/39/35.5
TECHNICAL
DRAWINGS

Operation range Around unit °CDB 0°C~40°CDB, 80% RH or less


Supply air °CDB -15°C~40°CDB, 80% RH or less
Return air °CDB 0°C~40°CDB, 80% RH or less
On coil temperature Cooling/Max./Heating/Min. °CDB -15/43 -15/43
Refrigerant Control Electronic expansion valve
Type R-410A
GWP 2,087.5
Connection duct diameter mm 200 250 200 250
Piping connections Liquid OD mm 6.35
Gas OD mm 12.7
Water supply mm - 6.4
Drain PT3/4 external thread
Power supply Phase/Frequency/Voltage Hz/V 1~/50/220-240
PREVIOUS

Current Maximum fuse amps (MFA) A 15

27
For small to large commercial spaces Daikin offers
a range of inverter condensing units for use in
conjunction with air handling units. In situations
where Daikin commercial range ventilation units
cannot satisfy the ventilation requirement due to
building constraints (large atriums, banquet halls
etc), air handling units represent the ideal solution.
Air handling units provide large fresh air volumes
(up to 140,000 m3/h) and high ESPs enabling
the use of extensive ductwork runs.

An air handler or air handling unit provides


a tailor-made solution for optimising air conditions
throughout multiple spaces. An air handling unit
can be customised to your building - with no
installation restrictions or design limitations - as
Daikin air handling units are based on a completely
unique modular design, so they can be sized (in
increments of 1  cm) to your exact requirements.

28
Daikin

INTRO
air handling units

ERV/HRV BENEFITS
MODULAR L SMART
Ventilation

Energy
Humidification
recovery

Air
Filtration
processing

VAM/VKM
AIR HANDLING UNITS
AHU

ACCESSORIES
Air handling unit applications

OPTIONS &
Why choose Daikin air handling units with a DX connection? 30

Why use VRV and ERQ condensing units for connection


to air handling units? 32

In order to maximise installation flexibility, TOOLS & PLATFORMS


4 types of control systems are offered 33

VRV - for larger capacities (from 8 to 54HP) 34

ERQ - for smaller capacities (from 100 to 250 class) 35

Integration of VRV and ERQ in third party air handling units 36

Pair and multi application selection 37


TECHNICAL
DRAWINGS
PREVIOUS

29
Daikin’s
air handling units solutions
You will find your match

Why choose Daikin air handling units with a DX connection?

Simplifying business Complete range of possibilities

The unique total solution approach by Daikin Thanks to the most complete offer in the market,
helps businesses to propose better cross-pillar Daikin has the solution for all types of commercial
solutions, to increase their success ratio by providing applications requiring fresh air. Daikin provides
unmatchable product combinations to the end-user ventilation solutions based on AHU from 2,500 m3/h
and to simplify the life of installers by supplying up to 140,000 m3/h either with natural heat recovery
high-quality products coming from the same or more advanced ventilation solutions where
manufacturer. Contrary to other manufacturers, a VRV outdoor unit can be connected to the Daikin
Daikin does not use OEM products in its AHU with DX AHU for ultimate climate control. The harmonized
offer. Many competitors are either offering OEM DX control, between the VRV outdoor unit and the AHU,
outdoor units or OEM AHU which create additional offer outstanding reliable operation of the system
problems when warranties or faults arise. Having a when connected to an iTM.
single interface for your business makes Daikin
the right choice.

One-stop shop

Daikin is the only global manufacturer in the market


capable of offering a true Plug & Play solution
where Daikin AHUs manufactured by Daikin Applied
Europe and certified by Eurovent, offer off-the-shelf
compatibility with Daikin’s unique VRV outdoor unit
Advantages
range for the best performance in the market. ›› Unique manufacturer offering
This unique integration of cross-pillar products a complete range
under the same umbrella, gives the customer ›› Plug & Play solution
both peace-of-mind and added value when ›› Direct iTM compatibility
promoting a total solution approach.

30
INTRO
Daikin's
fresh air solution

ERV/HRV BENEFITS
MODULAR L SMART
VAM/VKM
Highly efficient EC fan Factory fitted and tested DX heat exchanger

AIR HANDLING UNITS


ACCESSORIES
OPTIONS &
TOOLS & PLATFORMS
TECHNICAL
DRAWINGS

Efficient filtration Heat wheel for energy recovery


PREVIOUS

31
Daikin Fresh air package - overview

Why use VRV and ERQ condensing units for connection


to air handling units?
High Efficiency

Daikin heat pumps are renowned for their high while the outdoor air is too cold to be brought
energy efficiency. Integrating the AHU with a heat inside in an unconditioned state. In this case heat
recovery system is even more effective since from the offices is merely transferred to heat up
an office system can frequently be in cooling mode the cold fresh air.

Outside air = 10°C

Fresh air supplied at 21°C.


The temperature difference with
the outdoor air is heated up efficiently
by heat recovery via A/C system

Indoor temperature 22°C,


needs cooling because of solar
radiation.
The excessive heat can be
transferred to the AHU.

Fast response to changing loads


resulting in high comfort levels
Easy Design and Installation
Daikin ERQ and VRV units respond rapidly
to fluctuations in supply air temperature, resulting The system is easy to design and install since
in a steady indoor temperature and resultant high no additional water systems such as boilers,
comfort levels for the end user. The ultimate is tanks and gas connections etc. are required.
the VRV range which improves comfort even more This also reduces both the total system investment
by offering continuous heating, also during defrost. and running cost.

Daikin Fresh air package

›› Plug & Play connection between VRV/ERQ and the entire D-AHU modular range.
›› Factory fitted and welded DX coil control and expansion valve kits.

VRV IV or ERQ
condensing unit

Factory fitted and welded


fresh air package

Electronic expansion
valve (EKEXV) Control box
(EKEQ)

32
INTRO
Daikin Fresh air package - Controls

In order to maximise installation flexibility,


4 types of control systems are offered

ERV/HRV BENEFITS
W control: Off the shelf control of air temperature (discharge Z control: Control of air temperature (suction temperature, room
temperature, suction temperature, room temperature) via any temperature) via Daikin control (no DDC controller needed)
DDC controller, easy to setup Y control: Control of refrigerant (Te/Tc) temperature via Daikin
X control: Precise control of air temperature (discharge temperature, control (no DDC controller needed)
suction temperature, room temperature) requiring
a preprogrammed DDC controller (for special applications)

MODULAR L SMART
1. W control (TS/TR/TROOM control): 2. X control (TS/TR/TROOM control):

Air temperature control via DDC controller Precise air temperature control via DDC controller
Room temperature is controlled as a function of the air handling Room temperature is controlled as a function of the air handling
unit suction or discharge air (customer selection). The DDC unit suction or discharge air (customer selection). The DDC
controller is translating the temperature difference between set controller is translating the temperature difference between set
point and air suction temperature (or air discharge temperature point and air suction temperature (or air discharge temperature

VAM/VKM
or room temperature) into a proportional 0-10V signal which is or room temperature) into a reference voltage (0-10V) which is
transferred to the Daikin control box (EKEQFCBA). This voltage transferred to the Daikin control box (EKEQFCBA). This reference
modulates the capacity requirements of the outdoor unit. voltage will be used as the main input value for the compressor
frequency control.
OR
OR OR
OR
AHU
AHU AHU
AHU

TEXT TTR TEXT TTR


R R
0-10V Control
Daikin boxbox:
control 0-10V Control
Daikin boxbox:
control

AIR HANDLING UNITS


DDC
DDC + DDC
DDC +
EKEQFCBA
EKEQFCBA TE TC EKEQFCBA
EKEQFCBA
TTOA
OA TTSS TTOA
OA
TETC TTSS
- -

TTROOM
ROOM TTROOM
ROOM

3. Y control (TE/TC control): 4. Z control (TS/TROOM control):

By fixed evaporating /condensing temperature Control your AHU just like a VRV indoor unit

ACCESSORIES
A fixed target evaporating or condensing temperature can be set with up to 100% fresh air

OPTIONS &
by the customer. In this case, room temperature is only indirectly Allows the possibility to control the AHU just like a VRV indoor
controlled. A Daikin wired remote control (BRC1* - optional) have unit. Meaning temperature control will be focused on return air
to be connected for initial set-up but not required for operation. temperature from the room into the AHU. Requires BRC1* for
operation. The only control that allows the combination of other
indoor units to the AHU at the same time.
AHU
TTEXT
EXT TTRR
BRC1D*
BRC1D* Control box TOOLS & PLATFORMS
BRC1E* TEXT
EXT TRR
BRC1E* EKEQFCBA + BRC1D* Control box
Control box
BRC1H* TTOA TE TC TTSS
BRC1D*
OA BRC1E* EKEQMCBA (VRVIV)
EKEQMCBA (VRV IV) +
BRC1E*
- BRC1H* EKEQDCB (ERQ)
(ERQ) TTOA TE
OA TC TS
-

TTROOM
ROOM
OR
OR
TTROOM
ROOM
TECHNICAL
DRAWINGS

TS = Supply air temperature TR = Return air temperature TOA = Outdoor air temperature TROOM = Room air temperature
TEXT = Extraction air temperature TE = Evaporating temperature TC = Condensing temperature

Option kit Features


Possibility W Off-the-shelf DDC controller that requires no pre-configuration
Possibility X EKEQFCBA Pre-configured DDC controller required
Possibility Y Using fixed evaporating temperature, no set point can be set using remote control
PREVIOUS

EKEQDCB Using Daikin infrared remote control BRC1*


Possibility Z
EKFQMCBA* Temperature control using air suction temperature or room temperature (via remote sensor)
* EKEQMCB (for ’multi’ application)

33
Daikin Fresh air package - VRV connections

- for larger capacities (from 8 to 54HP)

An advanced solution for both pair and multi application

›› Inverter controlled units


›› Heat recovery, heat pump
›› R-410A
›› Control of room temperature via Daikin control
›› Large range of expansion valve kits available
›› BRC1H* is used to set the set point temperature
(connected to the EKEQMCBA).
›› Connectable to all VRV heat recovery and
heat pump systems

W, X, Y control for VRV IV heat pump Z control for all VRV outdoor units

Refrigerant piping
F1-F2
P1-P2

34
INTRO
Daikin Fresh air package - ERQ connections

ERQ - for smaller capacities


(from 100 to 250 class)

ERV/HRV BENEFITS
A basic fresh air solution for pair application

›› Inverter controlled units


›› Heat pump
›› R-410A
›› Wide range of expansion valve kits available
›› Perfect for the Daikin Modular air handling unit

MODULAR L SMART
The “Daikin Fresh Air Package” provides a complete Plug & Play Solution including
AHU, ERQ or VRV Condensing Unit and all unit control (EKEQ, EKEX, DDC controller)
factory mounted and configured. The easiest solution with only one point of contact.

ERQ-AW1

Ventilation ERQ 100AV1 125AV1 140AV1


Capacity range HP 4 5 6

VAM/VKM
Cooling capacity Nom. kW 11.2 14.0 15.5
Heating capacity Nom. kW 12.5 16.0 18.0
Power input Cooling Nom. kW 2.81 3.51 4.53
Heating Nom. kW 2.74 3.86 4.57
EER 3.99 3.42
COP 4.56 4.15 3.94
Dimensions Unit HeightxWidthxDepth mm 1,345x900x320
Weight Unit kg 120

AIR HANDLING UNITS


Casing Material Painted galvanized steel plate
Fan-Air flow rate Cooling Nom. m³/min 106
Heating Nom. m³/min 102 105
Sound power level Cooling Nom. dBA 66 67 69
Sound pressure Cooling Nom. dBA 50 51 53
level Heating Nom. dBA 52 53 55
Operation range Cooling Min./Max. °CDB -5/46
Heating Min./Max. °CWB -20/15.5
On coil temperature Heating/Min./Cooling/Max. °CDB 10/35
Refrigerant Type R-410A
Charge kg 4.0
TCO₂eq 8.4
GWP 2,087.5

ACCESSORIES
OPTIONS &
Control Expansion valve (electronic type)
Piping connections Liquid OD mm 9.52
Gas OD mm 15.9 19.1
Drain OD mm 26x3
Power supply Phase/Frequency/Voltage Hz/V 1N~/50/220-240
Current Maximum fuse amps (MFA) A 32.0
Ventilation ERQ 125AW1 200AW1 250AW1
Capacity range HP 5 8 10
Cooling capacity Nom. kW 14.0 22.4 28.0 TOOLS & PLATFORMS
Heating capacity Nom. kW 16.0 25.0 31.5
Power input Cooling Nom. kW 3.52 5.22 7.42
Heating Nom. kW 4.00 5.56 7.70
EER 3.98 4.29 3.77
COP 4.00 4.50 4.09
Dimensions Unit HeightxWidthxDepth mm 1,680x635x765 1,680x930x765
Weight Unit kg 159 187 240
Casing Material Painted galvanized steel plate
Fan-Air flow rate Cooling Nom. m³/min 95 171 185
Heating Nom. m³/min 95 171 185
Sound power level Nom. dBA 72 78
Sound pressure level Nom. dBA 54 57 58
TECHNICAL
DRAWINGS

Operation range Cooling Min./Max. °CDB -5/43


Heating Min./Max. °CWB -20/15
On coil temperature Heating/Min./Cooling/Max. °CDB 10/35
Refrigerant Type R-410A
Charge kg 6.2 7.7 8.4
TCO₂eq 12.9 16.1 17.5
GWP 2,087.5
Control Electronic expansion valve
Piping connections Liquid OD mm 9.52
Gas OD mm 15.9 19.1 22.2
Power supply Phase/Frequency/Voltage Hz/V 3N~/50/400
PREVIOUS

Current Maximum fuse amps (MFA) A 16 25

35
Integration with third party air handling units

Integration of ERQ and VRV in third party air handling units


a wide range of expansion valve kits and control boxes

Combination table
Control box Expansion valve kit
Mixed connection with
EKEQDCB EKEQFCBA EKEQMCBA EKEXV50 EKEXV63 EKEXV80 EKEXV100 EKEXV125 EKEXV140 EKEXV200 EKEXV250 EKEXV400 EKEXV500
VRV indoor units
Z control W,X,Y control Z control - - - - - - - - - -
ERQ100 P P - - P P P P - - - - -
1-phase ERQ125 P P - - P P P P P - - - -
ERQ140 P P - - - P P P P - - - -
Not possible
ERQ125 P P - - P P P P P - - - -
3-phase ERQ200 P P - - - - P P P P P - -
ERQ250 P P - - - - - P P P P - -
VRV III - - n1 n1 n1 n1 n1 n1 n1 n1 n1 n1 n1 Mandatory
VRV IV H/P / Possible (not
VRV IV W-series - P (1 -> 3) n2 n2 n2 n2 n2 n2 n2 n2 n2 n2 n2 mandatory)
VRV IV S-series
VRV IV H/R - n1 - n1 n1 n1 n1 n1 n1 n1 n1 n1 n1 Mandatory
VRV IV i-series
• P (pair application): combination depends on the capacity of the air handling unit
• n1 (multi application) - Combination of AHUs and VRV DX indoors (mandatory). To determine the exact quantity please refer to the engineering data book.
• n2 (multi application) - Combination of AHUs and VRV DX indoors (not mandatory). To determine the exact quantity please refer to the engineering data book.
• Control box EKEQFA can be connected to some types of VRV IV outdoor units (with a maximum of 3 boxes per unit). Do not combine EKEQFA control boxes with VRV DX indoor units, RA indoor units or hydroboxes

Capacity table

Cooling Heating
Allowed heat exchanger Allowed heat exchanger Allowed heat exchanger Allowed heat exchanger
EKEXV Class capacity (kW) volume (dm3) EKEXV Class capacity (kW) volume (dm3)
Minimum Standard Maximum Minimum Maximum Minimum Standard Maximum Minimum Maximum
50 5.0 5.6 6.2 1.33 1.65 50 5.6 6.3 7.0 1.33 1.65
63 6.3 7.1 7.8 1.66 2.08 63 7.1 8.0 8.8 1.66 2.08
80 7.9 9.0 9.9 2.09 2.64 80 8.9 10.0 11.1 2.09 2.64
100 10.0 11.2 12.3 2.65 3.30 100 11.2 12.5 13.8 2.65 3.30
125 12.4 14.0 15.4 3.31 4.12 125 13.9 16.0 17.3 3.31 4.12
140 15.5 16.0 17.6 4.13 4.62 140 17.4 18.0 19.8 4.13 4.62
200 17.7 22.4 24.6 4.63 6.60 200 19.9 25.0 27.7 4.63 6.60
250 24.7 28.0 30.8 6.61 8.25 250 27.8 31.5 34.7 6.61 8.25
400 35.4 45.0 49.5 9.26 13.2 400 39.8 50.0 55.0 9.26 13.2
500 49.6 56.0 61.6 13.2 16.5 500 55.1 63.0 69.3 13.2 16.5
Saturated evaporating temperature: 6°C Saturated condensing temperature: 46°C
Air temperature: 27°C DB / 19°C WB Air temperature: 20°C DB

EKEXV - Expansion valve kit for air handling applications

Ventilation EKEXV 50 63 80 100 125 140 200 250 400 500


Dimensions Unit mm 401x215x78
Weight Unit kg 2.9
Sound pressure level Nom. dBA 45
Operation range On coil Heating Min. °CDB 10 (1)
temperature Cooling Max. °CDB 35 (2)
Refrigerant Type / GWP R-410A / 2.087,5
Piping connections Liquid OD mm 6.35 9.52 12.7 15.9

(1) The temperature of the air entering the coil in heating mode can be reduced to -5°CDB. Contact your local dealer for more information. (2) 45% Relative humidity.

EKEQ - Control box for air handling applications

Ventilation EKEQ FCBA DCB MCBA


Application See note Pair Multi
Outdoor unit ERQ / VRV ERQ VRV
Dimensions Unit mm 132x400x200
Weight Unit kg 3.9 3.6
Power supply Phase/Frequency/Voltage Hz/V 1~/50/230

The combination of EKEQFCBA and ERQ is in pair application. The EKEQFCBA can be connected to some type of VRV IV outdoor units with a maximum of 3 control boxes. The combination with DX indoor units,
hydroboxes, RA outdoor units, ... is not allowed. Refer to the combination table drawing of the outdoor unit for details.

36
INTRO
Selection

Pair application selection

ERV/HRV BENEFITS
›› the outdoor unit is connected to ONE COIL (with single circuit
or maximum 3 interlaced circuits) using up to 3 control boxes
›› indoor unit combination is not allowed
›› only works with X, W, Y control

Step 1: Required AHU capacity


Step 3: Control box selection
An AHU with double flow, heat recovery and 100% fresh air is to

MODULAR L SMART
be installed in Europe where the outdoor sizing temperature is 35 In this particular case, the control will work with precise air
ºCDB and the target supply air temperature for fresh air is 25 ºCDB. temperature control. Only W or X control allow this. Since the
Load calculations point to a required capacity of 45kW. consultant wants to use an “off-the-shelf” DDC module, the
By checking on the EKEXV capacity table, for cooling operation, EKEQFCBA box with W control allows easy set-up due to pre-set
40kW falls within the 400 class valve. Since 40kW is not the nominal factory values.
capacity, a class adjustment has to be done. 40/45=0,89 and
0,89x400=356. So the capacity class of the expansion valve kit is
356.

VAM/VKM
Step 2: Outdoor unit selection

For this AHU, a VRV IV heat pump model with continuous heating is
going to be used (RYYQ-T series). For a capacity of 40kW at 35 ºCDB,
an outdoor of 14HP (RYYQ14T) is selected. The capacity class of the
14 HP outdoor unit is 350.

AIR HANDLING UNITS


Total connection ratio of the system is 356/350=102% hence it falls
within the range 90-110%.

Multi application selection

ACCESSORIES
OPTIONS &
›› the outdoor unit can be connected to MULTIPLE COILS
(and their control boxes)
›› indoor units are also connectable but not mandatory
›› only works with Z control
TOOLS & PLATFORMS

Step 1: Required AHU capacity Step 2: Outdoor unit selection

An AHU with double flow, heat recovery and 100% fresh air is to
be installed in Europe where the outdoor sizing temperature is For this system where a AHU is connected with indoor units,
35 ºCDB and the target supply air temperature for fresh air is 25 it is mandatory to use a heat recovery unit. By consulting the
ºCDB. On top of this, for this building, 5 round-flow cassette units engineering databook for REYQ-T, the total required capacity of 42,5
FXFQ50A will also be connected to this OU. kW requires a 16HP model REYQ16T. Which will deliver 45kW at the
Load calculations point to a required capacity of 20kW for the AHU design temperature of 35 ºCDB. This unit has a capacity class of 400.
TECHNICAL
DRAWINGS

and 22,5 kW for the indoor untis. Total connection ratio of the system is 428/400=107% hence it falls
By checking on the EKEXV capacity table, for cooling operation, within the range 50-110%.
20kW falls within the 200 class valve. Since 22,4 kW is the nominal
capacity, a class adjustment has to be done. 20/22,4=0,89 and Step 3: Control box selection
0,89x200=178. So the capacity class of the expansion valve kit is
178. Total capacity class of the indoor unit system is 178+250=428 In this particular case, the only available control is Z control and the
combination of AHU and VRV DX indoor units requires EKEQMCBA
control box.
PREVIOUS

37
Air handling application

Pair application examples


Pair application layout #1: Example for W or X control with EKEQFCBA box

F1/F2

EKEQFCBA EKEKXV*
Digital signal
to steer EEV Treturn

Only for
commissioning OR

Tsupply

0-10 V signal Temperature sensor reading


From DDC to EKEQFCBA input to DDC

Outdoor unit compatibility More than 3 control boxes


RYYQ8T > RYYQ54T connected to same outdoor
DX coil

RXYQ8T > RXYQ54T


RWEYQ8T9 > RWEYQ30T9
ERQ100 > ERQ250 1
(1) Only available in 1 to 1 combination
Two control boxes connected
to Outdoor 1 to circuits 1
Connection restrictions and 2 of coil A. Control box 3
DX coil

Connection Ratio VRV: between 90-110% connected to outdoor 2 and


circuit 3 of coil A.
Connection Ratio ERQ: between 50-110%
CR= Σ IU CC = Σ (CF x EKEXV CC)1-3
Σ OU CC Σ OU CC

CF is the correction factor


CC is the capacity class Two control boxes on coil A
DX coil

(2 circuits) and another control


box on coil B (1 circuit).
Both connected to
DX coil

same outdoor

38
Air handling application

INTRO
Pair application layout #2: Example for Y control with EKEQFCBA box

ERV/HRV BENEFITS
MODULAR L SMART
F1/F2

EKEQFCBA EKEKXV*

VAM/VKM
Digital signal
to steer EEV Treturn

Only for
commissioning

AIR HANDLING UNITS


Tsupply

Input signal from sensors

ACCESSORIES
OPTIONS &
Outdoor unit compatibility More than 3 control boxes
RYYQ8T > RYYQ54T connected to same outdoor
DX coil

RXYQ8T > RXYQ54T


RWEYQ8T9 > RWEYQ30T9 TOOLS & PLATFORMS

ERQ100 > ERQ250 1


(1) Only available in 1 to 1 combination
Two control boxes connected
to Outdoor 1 to circuits 1
Connection restrictions and 2 of coil A. Control box 3
DX coil

Connection Ratio between 90-110% connected to outdoor 2 and


OK circuit 3 of coil A.
Connection Ratio ERQ: between 50-110%
TECHNICAL
DRAWINGS

CR= Σ IU CC = Σ (CF x EKEXV CC)1-3


Σ OU CC Σ OU CC

CF is the correction factor


CC is the capacity class Two control boxes on coil A
DX coil

(2 circuits) and another control


OK box on coil B (1 circuit).
PREVIOUS

Both connected to same


DX coil

outdoor

39
Air handling application

Multi application examples


Multi application layout #1: Example for Z control with EKEQMCBA box and no VRV indoor units

F1/F2
Mandatory

EKEQMCBA EKEKXV*
Digital signal to steer EEV

OR

ROOM

KRCS01-1B

n control boxes
Input signal from sensors
OR

Outdoor unit compatibility More than 3 control boxes


RYYQ8T > RYYQ54T connected to same outdoor
OK
DX coil

RXYQ8T > RXYQ54T


RWEYQ8T9 > RWEYQ30T9
EKEQMCBA control box
Two control boxes connected
ERQ100 > ERQ250 1 to Outdoor 1 to circuits 1
EKEQDCB control box and 2 of coil A. Control box 3
DX coil

(1) Only available in 1 to 1 combination connected to outdoor 2 and


OK circuit 3 of coil A.
Connection restrictions
Connection Ratio between 90-110%
Connection Ratio ERQ: between 50-110%
CR= Σ IU CC = Σ (CF x EKEXV CC)1-n Two control boxes on coil A
DX coil

Σ OU CC Σ OU CC (2 circuits) and another control


OK box on coil B (1 circuit).
CF is the correction factor Both connected to same
DX coil

CC is the capacity class outdoor

40
Air handling application

INTRO
Multi application layout #2: Example for Z control with EKEQMCBA box and VRV indoor units

ERV/HRV BENEFITS
MODULAR L SMART
F1/F2
Mandatory

EKEQMCBA EKEKXV*
Digital signal to steer EEV

VAM/VKM
OR

ROOM

AIR HANDLING UNITS


KRCS01-1B

n control boxes

ACCESSORIES
OPTIONS &
Input signal from sensors
OR

Outdoor unit compatibility More than 3 control boxes


Not mandatory to have VRV DX indoors: connected to same outdoor TOOLS & PLATFORMS

OK
DX coil

RYYQ8T > RYYQ54T


RXYQ8T > RXYQ54T
RWEYQ8T9 > RWEYQ30T9
Two control boxes connected
Mandatory to have VRV DX indoors: to Outdoor 1 to circuits 1
REYQ8T > REYQ54T and 2 of coil A. Control box 3
DX coil

connected to outdoor 2 and


Connection restrictions OK
TECHNICAL
DRAWINGS

circuit 3 of coil A.
Connection Ratio between 50-110%
CR= Σ IU CC = Σ (CF x EKEXV CC)1-n
Σ OU CC Σ OU CC
Two control boxes on coil A
coil
DXcoil

RULES: Σ EKEXV CC: 0-60%  Σ IU CC: 50-110% (2 circuits) and another control
DX

OK box on coil B (1 circuit).


CF is the correction factor
PREVIOUS

Both connected to same


coil
coil

CC is the capacity class


DXDX

outdoor

41
Options & accessories

Options &
accessories

FILTERS

VH ELECTRICAL HEATER FOR VAM

CONTROLS

42
INTRO
ERV/HRV BENEFITS
MODULAR L SMART
VAM/VKM
AIR HANDLING UNITS
User-friendly wired remote contoller with premium design

ACCESSORIES
OPTIONS &
White Silver Black

BRC1H519W7/S7/K7
›› Sleek and elegant design TOOLS & PLATFORMS
›› Intuitive touch button control
›› 3 color versions
›› Advanced settings and monitoring can
be easily done via your smartphone Advanced user settings Field settings
›› Flat back for easy wall installation
›› Compact to fit standard size socket boxes
TECHNICAL
DRAWINGS

DIRECT INTEGRATION
WITH DAIKIN VENTILATION PRODUCTS
PREVIOUS

43
Heat Recovery Ventilation - Modular L (Smart)

ALB02LBS/RBS ALB03LBS/RBS ALB04,05LBS/ ALB06,07LBS/ VAM VAM VAM


RBS RBS 150FC9 250FC9 350J

BRC301B61
• • • • • • •
Individual control systems

VAM wired remote control


Madoka
BRC1H519W7 (White) / BRC1H519S7 (Silver) /
BRC1H519K7 (Black) • • • • • • •
User-friendly wired remote controller with premium design
BRC1E53A/B/C
Wired remote control with full-text
interface and back-light
• • • • • • •
BRC1D52
Standard wired remote control with weekly timer • • • • • • •
DCC601A51
intelligent Tablet Controller • • • • • • •
Centralised control

DCS601C51
intelligent Touch Controller • • • • • • •
systems

DCS302C51
Central remote control • • • • • • •
DCS301B51
Unified ON/OFF control • • • • • • •
DST301B51
Schedule timer • • • • • • •
DCM601A51
• • • • • • •
System & Standard
protocol interface

intelligent Touch Manager


Management

EKMBDXA
• • • • • • •
Building

Modbus interface
DMS502A51
BACnet Interface • • • • • • •
DMS504B51
LonWorks Interface • • • • • • •
Coarse 55% (G4) ALF02G4A ALF03G4A ALF05G4A ALF07G4A

ePM10 75% (M5) ALF02M5A ALF03M5A ALF05M5A ALF07M5A

ePM10 70% (M6) EKAFVJ50F6

ePM1 50% (F7) ALF02F7A ALF03F7A ALF05F7A ALF07F7A


Filters

ePM1 55% (F7) EKAFVJ50F7

ePM1 70% (F8) EKAFVJ50F8

ePM1 80% (F9) ALF02F9A ALF03F9A ALF05F9A ALF07F9A

High efficiency filter

Replacement air filter


Mechanical
accessories

Rail ALA02RLA ALA03RLA ALA05RLA ALA07RLA

Rectangular to round duct transition ALA02RCA ALA03RC ALA05RCA ALA07RCA

Separate plenum

CO2 sensor BRYMA200 BRYMA200 BRYMA200 BRYMA200 BRYMA65

Electrical heater NEW ALD02HEFB ALD03HEFB ALD05HEFB ALD07HEFB GSIEKA10009 GSIEKA15018 GSIEKA20024

Silencer (900mm depth) ALS0290A ALS0390A ALS0590A ALS0790A

Wiring adapter for external monitoring/control


Electrical accessories

KRP2A51 KRP2A51 KRP2A51 (2)


(controls 1 entire system)
Adapter PCB for humidifier KRP50-2 KRP50-2 KRP1C4 (5)

Adapter PCB for third party heater BRP4A50 BRP4A50 BRP4A50A (4)

External wired temperature sensor

Adapter PCB Mounting plate


Notes
(1) Do not connect the system to DIII-net devices LONWorks interface, BACnet interface, …; (intelligent Touch Manager, EKMBDXA are allowed)
(2) Installation box KRP1BA101 needed
(3) Adapter PCB mounting plate needed, applicable model can be found in the table above
(4) 3rd party heater and 3rd party humidifier cannot be combined
(5) Installation box KRP50-2A90 needed
(6) Contains 1 plenum and can be used for half side of the unit (up to 4 plenums can be used on 1 unit)
(7) Available only with optional plenum

44
INTRO
Energy recovery ventilation - VAM Energy recovery ventilation VKM Air handling unit applications

VAM VAM VAM VAM VAM VAM VKM VKM VKM EKEQ EKEQ EKEQ
500J 650J 800J 1000J 1500J 2000J 50GB (M) 80GB (M) 100GB (M) FCBA (1) DCB (1) MCBA (1)

ERV/HRV BENEFITS
• • • • • •
• • • • • • • • • • • •

• • • • • • • • • • • •

MODULAR L SMART
• • • • • • • • • • • •
• • • • • • • • • • • •
• • • • • • • • • • • •
• • • • • • • • •
• • • • • • • • •
• • • • • • • • •
• • • • • • • • • • • •

VAM/VKM
• • • • • • • • • • • •
• • • • • • • • •
• • • • • • • • •

AIR HANDLING UNITS


EKAFVJ50F6 EKAFVJ65F6 EKAFVJ100F6 EKAFVJ100F6 EKAFVJ100F6 x2 EKAFVJ100F6 x2

EKAFVJ50F7 EKAFVJ65F7 EKAFVJ100F7 EKAFVJ100F7 EKAFVJ100F7 x2 EKAFVJ100F7 x2

EKAFVJ50F8 EKAFVJ65F8 EKAFVJ100F8 EKAFVJ100F8 EKAFVJ100F8 x2 EKAFVJ100F8 x2

ACCESSORIES
OPTIONS &
KAF242H80M KAF242H100M KAF242H100M

KAF241H80M KAF241H100M KAF241H100M

TOOLS & PLATFORMS


EKPLEN200 (6) EKPLEN200 (6)

BRYMA65 BRYMA65 BRYMA100 BRYMA100 BRYMA200 BRYMA200 BRYMA65 BRYMA100 BRYMA200

GSIEKA20024 GSIEKA25030 GSIEKA25030 GSIEKA25030 GSIEKA35530 (7)

KRP2A51 (2) KRP2A51 (2) KRP2A51 (2) KRP2A51 (2) KRP2A51 (2) KRP2A51 (2) BRP4A50A (4) BRP4A50A (4) BRP4A50A (4)

KRP1C4 (5) KRP1C4 (3/5) KRP1C4 (5) KRP1C4 (5) KRP1C4 (3/5) KRP1C4 (3/5) BRP4A50A (4) BRP4A50A (4) BRP4A50A (4)

BRP4A50A (4) BRP4A50A (3/4) BRP4A50A (4) BRP4A50A (4) BRP4A50A (3/4) BRP4A50A (3/4) BRP4A50A (4) BRP4A50A (4) BRP4A50A (4)
TECHNICAL
DRAWINGS

KRCS01-1

EKMP65VAM EKMPVAM
PREVIOUS

45
ALD-HEFB

Electrical heater for


Modular L Smart
›› Total solution for fresh air with Daikin supply of both Modular L
Smart and electrical heaters
›› Increase comfort in low outdoor temperature thanks
to the heated outdoor air
›› Integrated electrical heater concept
(no additional accessories required)
›› Standard dual flow and temperature sensor
›› Heater only consumes what is required to pre-heat to the desired
minimum fresh air temperature; thus saving energy

Electrical heater for Modular L Smart (ALD) 02HEFB 03HEFB 05HEFB 07HEFB
Capacity kW 1,5 3 7,5 15
Connectable Modular L Smart size 02 03 04, 05 06, 07
Supply voltage 230V,1ph 400V,3ph
Output current (maximum) (A) 6,6 13,1 10,9 21,7

15k ohms at -20 °C 16k ohms at -20 °C 17k ohms at -20 °C 18k ohms at -20 °C
Temperature sensor
10k ohms at +10 °C 10k ohms at +10 °C 10k ohms at +10 °C 10k ohms at +10 °C

Temperature control range - 20 °C to 10 °C

Control fuse Mini Circuit Breaker 6 A

"Yellow = Airflow fault


LED indicators
Red = Heat ON”

Mounting holes Depends on duct size


Maximum ambient adjacent to terminal box 30°C (during operation)
Auto high temperature cutout 75°C Pre-set
Manual reset high temperature cutout 120°C Pre-set
Width (mm) 470 620 720 920
Depth (mm) 370 370 370 370
Height (mm) 193 243 343 443

46
INTRO
NEW GSIEKA

Electrical heater for VAM


›› Total solution for fresh air with Daikin supply of both VAM
and electrical heaters

ERV/HRV BENEFITS
›› Increased comfort in low outdoor temperature thanks
to the heated outdoor air
›› Integrated electrical heater concept
(no additional accessories required)
›› Standard dual flow and temperature sensor
›› Flexible setting with adjustable setpoint
›› Increased safety with 2 cut-outs: manual & automatic

MODULAR L SMART
VAM/VKM
AIR HANDLING UNITS
GSIEKA 10009 15018 20024 25030 35530(1)
Capacity kW 0.9 1.8 2.4 3.0 3.0

ACCESSORIES
Duct diameter mm 100 150 200 250 355

OPTIONS &
VAM650J,
VAM1500J,
Connectable VAM VAM150FC9 VAM250FC9 VAM350,500J VAM800J,
VAM2000J
VAM1000J

  GSIEKA10009 GSIEKA15018 GSIEKA20024 GSIEKA25030 GSIEKA35530


Height mm 171 221 271 321 426
Dimensions Depth mm 100 150 200 250 355
Width mm 370 370 370 370 373 TOOLS & PLATFORMS
  m/s 1.5
Minimum air velocity / airflow
m³/h 45 100 170 265 535
Power supply     1~230 VAC/50Hz
Nominal current   A 4.1 8.2 10.9 13.1 13.1
Heating power   kW 0.9 1.8 2.4 3.0 3.0
Connection duct diameter   mm 100 150 200 250 355
Min. °C -40°C
Operation range Max. °C 40°C
Rel. Humidity % 90%
Temperature sensor 10 kΩ at +25°C / TJ-K10K
TECHNICAL
DRAWINGS

Temperature sensor range - 30°C to 105°C


Temperature set point range - 10°C to 50°C
flashing every 5 seconds heater is starting up
flashing every second air flow detected, heating allowed
LED 1
OFF no power supply or no flow
LED indicators
ON problem with duct temperature sensor, set point potentiometer or PTC airflow sensor
OFF heater is not operation
LED 2
ON heater is operating
Ambient temperature adjacent to controller 0°C to +50°C
Auto high temperature cut-out 50°C
PREVIOUS

Manual reset high temperature cut-out 100°C

47
We’re here to help you!
Online and offline

http://literature.daikinpromoshop.eu

Benefits
We care icons
Seasonal efficiency, smart use of energy Econo mode
Seasonal efficiency gives a more realistic indication on how This function decreases the power consumption so that other
efficient air conditioners operate over an entire heating or cooling applicances that need large power consumption can be used.
season. This function is also energy saving.
Auto-cleaning filter Movement sensor
The filter automatically cleans itself. Simplicity of upkeep means The sensor detects whether someone is in the room. When
optimum energy efficiency and maximum comfort without the the room is empty, the unit switches to economy mode after
need for expensive or time-consuming maintenance. 20 minutes and restarts when a person enters the room.
Inverter technology
Inverter compressors continuously adjust compressor speed to
actual demand. Fewer power-consuming starts and stops result
in decreased energy consumption (up to 30%) and more stable
Home leave operation
During absence, the indoor temperature can be maintained at
a certain level.
A big step setting the
temperatures.
2 area intelligent eye
Air flow is sent to a zone other than where the person is located
at that moment. Detection is done in 2 directions: left and right. If
no people are detected, the unit will automatically switch over to
the energy-efficient setting.
Fan only
The air conditioner can be used as fan, blowing air without
cooling or heating. new heat pump standard General catalogue
3 area intelligent eye Free cooling
Air flow is sent to a zone other than where the person is located By exploiting the low external air temperatures to cool the water,
at that moment. Detection is done in 3 directions : left, front and

2018
free cooling reduces the load on the compressors and decreases
3 right. If no people are detected, the unit will automatically switch considerably the annual operating costs during the cold season.
over to the energy-efficient setting and eventually switch off.
Floor & presence sensor
Energy saving during operation standby The presence sensor directs the air away from any person
Current consumption is reduced by about 80 % when operating detected in the room, when the air flow control is on. The floor
on standby. sensor detects the average floor temperature and ensures an even
temperature distribution between ceiling and floor.
GENERAL C ATA L O G U E 2 0 1 8

Night set mode Solar panel


Saves energy, by preventing overcooling or overheating during Take advantage of solar power. Easily connect your hot water
night time. storage to solar collectors on your roof.

Comfort
Comfort mode Draught prevention
The unit automatically changes the angle of the air discharge louvre When starting to warm up or when the thermostat is off, the air
depending on the mode. In cooling operation the air will be directed discharge direction is set horizontally and the fan to low speed, to
rather upwards to avoid cold draught, while in heating operation the prevent draught. After warming up, air discharge and fan speed
air will be directed rather downwards to avoid cold feet. are set as desired.
Powerful mode Auto cooling-heating changeover
If the temperature in the room is too high/low, it can be cooled Automatically selects cooling or heating mode to achieve
down/heated quickly by selecting the ‘powerful mode’. After the the set temperature (heat pump types only).
powerful mode is turned off, the unit returns to the preset mode.

Impossible to hear Indoor unit silent operation


Practically inaudible: the unit runs so quietly, you will almost To ensure a quiet environment for studying or sleeping the user
forget it is there. can lower the operation sound of the indoor unit by 3 dB(A) via
remote control.
Night quiet mode (cooling only)
Whisper quiet Lowers the operation sound of the outdoor unit automatically
Daikin units are whisper quiet. (with sound levels as low as 19dBA) at night.
Installer has to make special setting on outdoor unit or wired

Outdoor unit silent operation


remote controller, depending on model.
The new generation Daikin Altherma 3
To ensure a quiet environment for the neighbourhood the user Radiant heat
can lower the operation sound of the outdoor unit by 3 dB(A) via
remote control.
The front panel of the indoor unit radiates additional heat to add
to your comfort on cold days HE M
IN T

IS

High performance - The 3rd Generation of Daikin Altherma is


S I ON

Fresh hot water


Comfortable sleeping mode The structure of thermal store ensures optimal water hygiene and taking you beyond the imaginable with its performance: A+++
JO

Increased comfort function that follows a specific temperature eliminates the risk of bacteria and legionella. Rest assured that
fluctuation rhythm. your hot water is fresh and safe Seasonal efficiency and operation range down to -25°C.

Air flow Easy to install - The floor standing unit only has a 60 cm2
footprint and you can choose for white or silver-grey colour. HE M HE M
3-D Air flow
IN T
IN T

IS
IS

Ceiling soiling prevention This function combines Vertical and Horizontal auto-swing to
S I ON
S I ON

A special function prevents air blowing out too long in horizontal circulate a stream of cool/warm air right to the corners of even
position, to prevent ceiling stains. large spaces. Easy to control - Fully digital, the Daikin Altherma 3 can be
JO
JO

Vertical auto swing Horizontal auto swing


controlled from everywhere with an app or a home control system.
Possibility to select automatic vertical moving of the air discharge Possibility to select automatic horizontal moving of the air
louvre, for uniform air flow and temperature distribution. discharge louvre, for uniform air flow and temperature distribution.

Auto fan speed


Fan speed steps
For more information: www.daikin.eu
Automatically selects the necessary fan speed to reach or maintain
the set temperature. Allows to select up to the given number of fan speed.
Daikin Europe N.V. participates in the Eurovent Certified
Performance programme for Liquid Chilling Packages and
Individual flap control Fireplace logic Hydronic Heat Pumps, Fan Coil Units and Variable Refrigerant
Flexible installation thanks to the possibility of easily closing When installed close to a heating device (e.g. fireplace or oven) Flow systems. Check ongoing validity of certificate:
one flap via the wired remote controller, to suit any new room and the set temperature is reached, the fan keeps on running to www.eurovent-certification.com
configuration. Optional closure kits are available as well. have an even temperature throughout the whole house
ECPEN18-500A
Coanda effect - cooling Grid eye sensor The present publication is drawn up by way of information only and does not constitute an offer binding upon
The Coanda effect optimises the airflow in cooling mode. By using The grid eye sensor determines the current room temperature and Daikin Europe N.V. Daikin Europe N.V. has compiled the content of this publication to the best of its knowledge. No
specially designed flaps, a more focused airflow allows a better distributes air evenly throughout the room before switching to an express or implied warranty is given for the completeness, accuracy, reliability or fitness for particular purpose of its
temperature distribution throughout the whole room. airflow pattern that directs warm or cool air to areas that need it. content and the products and services presented therein. Specifications are subject to change without prior notice.
Daikin Europe N.V. explicitly rejects any liability for any direct or indirect damage, in the broadest sense, arising from
Coanda effect - heating or related to the use and/or interpretation of this publication. All content is copyrighted by Daikin Europe N.V.
The Coanda effect optimises the airflow in heating mode. By using Printed on non-chlorinated paper. Prepared by Schaubroeck
specially designed flaps, a more focused airflow allows a better
temperature distribution throughout the whole room.

133651_ECPEN_500A_v02.indd 1 28/02/18 07:42

48
Supporting tools, software and apps
52
Literature overview 50
platforms
Tools and

49
TECHNICAL OPTIONS &
PREVIOUS DRAWINGS TOOLS & PLATFORMS AIR HANDLING UNITS VAM/VKM MODULAR L SMART ERV/HRV BENEFITS INTRO
ACCESSORIES
Commercial market - literature overview
for professional network
Solution
guides:

Reference
books:

Product Keep looking


i
VRV IV i-series Sky Air Water-to-air
profiles: you’ll never find me Main benefits, A-series heat pump
application examples Our mission

Achieve
Main benefits
Water-to-air
heat pump Detailed info on
the lowest
and specs of VRV IV environmental
impact and specs
using water as a heat source

VRV IV W-series,
VRV IV heat pumps for indoor installation i-series product range application
207 116 examples,
technical
VRV IV S-series Introducing the new Sky Air A-series with
ultra-efficient Bluevolution R-32 technology Scale up your expectations system design
Keep looking
you’ll never find me Main benefits, background
application examples
and specs of VRV IV 209

Compact VRV IV heat pumps


for residential and light commercial applications
S-series product range
208

Focus Replacement Infrastructure cooling F-gas phase down


topics: Technology ON
TINUOUS O Clear installer benefits Clear explanation of
C

PE
RELIABLE,

Replacement why to choose Daikin the phase down targets


RATION

Infrastructure
technology Clear installer benefits of VRV cooling solution
for installers
replacement technology for infrastructure cooling and how Daikin takes
the lead in meeting these

› For server rooms, telecom shelters, laboratories, IT applications

214 140 605


The quick and quality way of upgrading R-22 and R-407C systems

Daikin Cloud Service Sky Air Alpha-series


Detailed info on the Daikin Detailed info on the
Product Madoka
Cloud Service packages RZAG-NV1/NY1 outdoor units
flyers: Detailed info on the Madoka
wired remote controllers 542 147

Mini Sky Air Alpha-series Sky Air Advance-series


Detailed info on the RZAG-A Detailed info on the RZA-D
outdoor unit outdoor units

306 146 148

Product Sky Air Catalogue VRV Catalogue Ventilation Catalogue


catalogues: Detailed technical Detailed technical Detailed info on
information & benefits on information & benefits Ventilation products
Sky Air/Ventilation/Biddle of the VRV total solution
Air Curtain/Control systems/
AHU

100 200 203

50
Tools and platforms

INTRO
for your customers

ERV/HRV BENEFITS
Commercial Solutions Green Building Solutions
Daikin offers solutions for Green building
Clear building owner/investor
benefits why to choose Daikin
Commercial solutions
solutions
for small to large applications
commercial applications
for a green building, with
emphasis on BREEAM
365-days climate comfort for every business

216
100
Sustainable design
with Daikin HVAC-R systems

Reference

MODULAR L SMART
catalogue
Daikin commercial Hotel Solutions
and industrial Hotel solutions
Clear building owner/investor
references for hotel owners
benefits why to choose Daikin
Heating - air conditioning - hot water - ventilation - refrigeration - control
for a hotel
218
213

Compressor retrofit Tablet


DCC601A51
VRV retrofit services Detailed benefits of DCC601A51
Control systems

Intelligent Touch
intelligent
Tablet Controller and Daikin Cloud Service
with cloud connection
Manager

VAM/VKM
Mini Building Management System

547 303
Your business at your fingertips

AIR HANDLING UNITS


Compressor retrofit
VRV retrofit services

547

ACCESSORIES
OPTIONS &
TOOLS & PLATFORMS
TECHNICAL
DRAWINGS

Technical documentation:
All latest Daikin catalogues are available in
a convenient library on the internet:
www.daikineurope.com/support-and-manuals/catalogues
PREVIOUS

51
Supporting www.daikineurope.com/
support-and-manuals/

tools, software and apps software-downloads

Web based Xpress selection software


Making selection easy, anytime, anywhere

›› Web & cloudbased access to your projects from ›› No need to do local installation
anywhere, at any time… ›› No tool updates required
›› Platform (Windows, Mac, …) and hardware (always latest version available)
(laptop, desktop, tablet) independent ›› Possibility to copy / share projects
›› Re-engineered GUI for maximum easy of use

Easy selection, anytime, anywhere

Main functions
Toolbox Working area

Detailed properties

Import / Export / Delete indoors

Easy editing of piping Intuitive interface

Clear wiring overview, easy to make control groups Clear overview of control groups and central controls

52
INTRO
ERV/HRV BENEFITS
Other selection software
VRV Pro Ventilation Xpress

Enables VRV air conditioning systems to be Selection tool for ventilation devices (VAM, VKM).

MODULAR L SMART
engineered in a precise and economical way, taking The selection is based on given supply/extract
into account the complex piping rules. Moreover, airflows (including fresh up and given ESP of supply/
it ensures optimum operating cycles and maximum extract ducting):
energy efficiency. ›› Determines size of electrical heaters
›› Accurate heat load calculation ›› Visualisation of psychrometric chart
›› Precise selection based on peak loads ›› Visualisation of selected configuration
›› Energy consumption indication ›› Required field settings mentioned in the report

VAM/VKM
AIR HANDLING UNITS
Webbased ASTRA selection WAGO selection tool

ACCESSORIES
for air handling units

OPTIONS &
The WAGO Selection Tool is specifically designed to
A powerful tool to select the right Air select the optimal WAGO I/O system for your needs.
Handling Units for your needs.
›› 3D interface ›› Easy selection of WAGO materials
›› quick selection procedures ›› Material list creation
›› new print-out possibilities and report shapes ›› Time saving
• Includes wiring schemes TOOLS & PLATFORMS
• Contains commissioning/preset data for
TECHNICAL
DRAWINGS
PREVIOUS

53
Plug-ins and third-party software tools

Building Information Modelling www.daikin.eu/


(BIM) support bim
›› BIM improves efficiency of design and build phase
›› Daikin is among the first
to supply a full library of BIM objects
for its VRV products

VRV CAD 2D http://www.


daikineurope.
›› Displays VRV pipe design on a Autocad 2D
floorplan com/autocad/
›› Improves project management index.jsp
›› Accurately calculates the pipe dimensions
and refnets
›› Determines the outdoor unit size
›› Validates VRV pipe rules
›› Accounts for the extra refrigerant charge,
including a max room concentration check

Energy simulation and design aid tools

Seasonal simulator

›› The Seasonal Simulator is an innovative software


tool that calculates and compares potential
seasonal efficiency ratings.
›› This user-friendly tool compares various Daikin
systems, annual power consumption,
CO2 emissions, and much more, to present an
accurate ROI calculation in a matter of minutes.

Psychrometrics diagram

›› The Psychrometrics Diagram Viewer demonstrates


the changing properties of moist air.
›› With this tool, users can choose two points
with specific conditions, plot them on the
diagram and select actions to change the
conditions, i.e. heat, cool and mix air.

54
Service tools

INTRO
Error code app

Quickly know the meaning of fault codes,


for each product family and the potential cause

ERV/HRV BENEFITS
D-Checker

D-checker is a software application used to record


and monitor operation data of Daikin applied, split,
Multi-split, Sky-air units, Daikin Altherma LT, ground
source heat pump, Hybrid, ZEAS, Conveni-pack &
R410A Booster unit

MODULAR L SMART
Bluetooth adaptor

Monitoring of Split, Sky Air and VRV


data via any bluetooth device Diagnosis of the Bluetooth system possible:
›› No need to access the outdoor unit
• Connects with D-Checker software (for laptops)
• Connects with monitoring app
(for tablets or smartphones) Computer with Bluetooth

VRV Service-Checker

VAM/VKM
›› Connected via F1/F2 bus to check multiple
systems at the same time
›› Connection of external pressure sensors possible

AIR HANDLING UNITS


Online support Internet
Business portal Find our solution for different applications:

›› Experience our new extranet that Supermarket Technical


Restaurant
thinks with you at my.daikin.eu
›› Find information in seconds Hotel Store & Bank Industry
shop
via a powerful search Sport &

ACCESSORIES
›› Customise the options so you Leisure

OPTIONS &
Home Office
see only info relevant for you
›› Access via mobile device or desktop

my.daikin.eu
TOOLS & PLATFORMS

ON
›› Get more commercial details on our flagship
THE
products via our dedicated minisites
R OA D
AT
CUSTOME ›› See our references
RS
TECHNICAL
DRAWINGS

AT THE OFFICE HOTEL PORTA FIRA

www.daikineurope.com/references
PREVIOUS

55
56
VAM-FC9/J
VKM-GB(M)
ALB-RBS / LBS

64
58
drawings
Technical

57
TECHNICAL OPTIONS &
PREVIOUS DRAWINGS TOOLS & PLATFORMS AIR HANDLING UNITS VAM/VKM MODULAR L SMART ERV/HRV BENEFITS INTRO
ACCESSORIES
VIEW ALL ALB-LBS DRAWINGS
ON MY.DAIKIN.EU

Detailed technical drawings

ALB02RBS/LBS

CONDENSATE
OUTLET 1/4”G

TOP VIEW BOTTOM VIEW

ELECTRIC
SWITCH BOX

ALB03RBS/LBS

CONDENSATE BOTTOM VIEW


OUTLET 1/4”G

TOP VIEW

ELECTRIC
SWITCH
BOX

58
VIEW ALL ALB-RBS DRAWINGS
ON MY.DAIKIN.EU

INTRO
Detailed technical drawings

ALB04RBS/LBS

ERV/HRV BENEFITS
CONDENSATE

MODULAR L SMART
OUTLET 1/4”G

TOP VIEW

BOTTOM VIEW

VAM/VKM
ELECTRIC
SWITCH
BOX

AIR HANDLING UNITS


ALB05RBS/LBS

ACCESSORIES
OPTIONS &
TOOLS & PLATFORMS
CONDENSATE
OUTLET 1/4”G

TOP VIEW
BOTTOM VIEW
TECHNICAL
DRAWINGS

ELECTRIC
SWITCH
BOX
PREVIOUS

59
VIEW ALL ALB-LBS DRAWINGS
ON MY.DAIKIN.EU

Detailed technical drawings

ALB06RBS/LBS

CONDENSATE
OUTLET 1/4”G

TOP VIEW

BOTTOM VIEW

ELECTRIC
SWITCH BOX

ALB07RBS/LBS

CONDENSATE
OUTLET 1/4”G

TOP VIEW

BOTTOM VIEW

ELECTRIC
SWITCH
BOX

60
VIEW ALL ALB-RBS DRAWINGS
ON MY.DAIKIN.EU

INTRO
Detailed technical drawings

ALB02RBS/LBS

ERV/HRV BENEFITS
External static pressure (Pa)

MODULAR L SMART
SFPv 2
400

SF
Pv
20
00
The diagram shows the available external pressure for the duct
system given an airflow.
SFPv = Specific Fan Power (W/m3/s)

VAM/VKM
The SFPv curves are referring to the complete unit. Moreover, it
includes power to both supply and extract fan divided by either
SF

the supply or extract volume whichever is the greater.


Pv
16
00

SF
Pv
SF 12
Pv 00
80
0
Nominal working point

AIR HANDLING UNITS


Airflow (m3/h)

ALB03RBS/LBS

ACCESSORIES
OPTIONS &
TOOLS & PLATFORMS
External static pressure (Pa)

SF
Pv
24
00
The diagram shows the available external pressure for the duct
system given an airflow.
TECHNICAL
DRAWINGS

SFPv = Specific Fan Power (W/m3/s)


The SFPv curves are referring to the complete unit. Moreover, it
SF
Pv includes power to both supply and extract fan divided by either
20
00
the supply or extract volume whichever is the greater.
SF
SF Pv
Pv 16
SFP 12 00
v 800 00
Nominal working point
Airflow (m3/h)
PREVIOUS

61
VIEW ALL ALB-LBS DRAWINGS
ON MY.DAIKIN.EU

Detailed technical drawings

ALB04RBS/LBS

SFPv 2
400
External static pressure (Pa)

SFPv
2000

SF
Pv
16
00 The diagram shows the available external pressure for the duct
system given an airflow.
SFPv = Specific Fan Power (W/m3/s)
The SFPv curves are referring to the complete unit. Moreover,
it includes power to both supply and extract fan divided by either
SF
Pv
12
the supply or extract volume whichever is the greater.
00
SF
Pv
80
0
Nominal working point
Airflow (m3/h)

ALB05RBS/LBS

SFP
v 240
0
External static pressure (Pa)

SFP
v 200
0

The diagram shows the available external pressure for the duct
SF
Pv
16
system given an airflow.
00

SFPv = Specific Fan Power (W/m3/s)


The SFPv curves are referring to the complete unit. Moreover, it
includes power to both supply and extract fan divided by either
SF
Pv
12
the supply or extract volume whichever is the greater.
00
SFP
v 800

Nominal working point


Airflow (m3/h)

62
VIEW ALL ALB-RBS DRAWINGS
ON MY.DAIKIN.EU

INTRO
Detailed technical drawings

ALB06RBS/LBS

ERV/HRV BENEFITS
2400
SFPv
External static pressure (Pa)

MODULAR L SMART
SFP
v 200
0

SF
Pv The diagram shows the available external pressure for the duct
16
00 system given an airflow.
SFPv = Specific Fan Power (W/m3/s)

VAM/VKM
The SFPv curves are referring to the complete unit. Moreover, it
includes power to both supply and extract fan divided by either
SF
Pv the supply or extract volume whichever is the greater.
12
00
SF
Pv
80
0
Nominal working point
Airflow (m3/h)

AIR HANDLING UNITS


ALB07RBS/LBS

ACCESSORIES
SFPv 24
00 OPTIONS &
TOOLS & PLATFORMS
External static pressure (Pa)

SFP
v 200
0

The diagram shows the available external pressure for the duct
system given an airflow.
SF
Pv
16 SFPv = Specific Fan Power (W/m3/s)
TECHNICAL
DRAWINGS

00

The SFPv curves are referring to the complete unit. Moreover, it


SF
Pv includes power to both supply and extract fan divided by either
12
00 the supply or extract volume whichever is the greater.
SF
Pv
80
0
Nominal working point
Airflow (m3/h)
PREVIOUS

63
VIEW ALL VAM-FC9 TECHNICAL VIEW ALL VAM-J TECHNICAL
DRAWINGS ON MY.DAIKIN.EU DRAWINGS ON MY.DAIKIN.EU

Detailed technical drawings

VAM150FC9
VAM150FA
Maintenance space for the heat exchange elements, the air filters and fans
Switch box

Ceiling hook
Inspection hole 4-14x40 oval hole
285 Ø 450

269 Supply air fan

120~250
600
Maintenance over 104 120.3
149

20
67

SA OA
Supply air to room 124 164

124
Fresh air from outdoors

288
509

560
(Outdoor air)
288

164
RA EA
Return air from room Exhaust air to outdoors
8 Sealing Sealing
8

120 104 718

20
149
Damper plate
Exhaust air fan
(Maintenance cover) Exhaust spacer
(Switch box)
145 760 145

Ø200
Ø97
Heat exchange elements Air filters

NOTE
1 Be sure to provide the inspection hole (450x450 mm) to inspect the air filters, the exchange elements and fans.

3TW27874-1
3TW27874-1

VAM250FC9
VAM250FA
Maintenance space for the heat exchange elements, the air filters and fans
Switch box

Ceiling hook
Inspection hole
285 Ø 450 4-14x40 oval hole

269 Supply air fan


120~250
600

149 Maintenance over


104 120.3
20
67

SA
OA
Supply air to room
124 164

124

Fresh air from outdoors


288
509

560
288

(Outdoor air)
164

RA EA
Return air from room Exhaust air to outdoors
8
Sealing Sealing
8

120 104 718


20

149
Damper plate
Exhaust air fan
(Maintenance cover)
(Switch box)
145 760 145
Ø200
Ø97

Heat exchange elements Air filters

NOTE
1 Be sure to provide the inspection hole (450x450 mm) to inspect the air filters, the exchange elements and fans.

3TW27884-1
3TW27884-1

64
VIEW ALL VAM-J TECHNICAL VIEW ALL VAM-FC9 TECHNICAL
DRAWINGS ON MY.DAIKIN.EU DRAWINGS ON MY.DAIKIN.EU

INTRO
Detailed technical drawings

VAM350-500J

Ceiling hook
Exhaust air fan ·4· - ·12· x ·40·mm oblong hole Damper panel
305
1045
122

ERV/HRV BENEFITS
Sealing material 122

22
Sealing material
RA
Return air from room
EA Room air

292
Exhaust air to outdoors
137

417
291 126
Exhaust air 173

837

883
866
173

125
Sealing material SA

417
137 Supply air to room
Supply air
OA
Fresh outdoor air Supply air fan
Outdoor air

MODULAR L SMART
190

22
Sealing material
122 122

≥ 675
200 - 300
Sealing material
Sealing material

475
Inspection hole

Switch box
Maintenance space for the air filters, heat exchangers and fans
900

Heat exchanger
78 1113 78

VAM/VKM
Switch box
213
197

Maintenance cover Air filter


Notes :
1.To allow for the inspection of the air filters, heat exchangers, and fans, be sure to provide the inspection hole.

AIR HANDLING UNITS


3D112815C

VAM650J
Ceiling hook
Exhaust air fan ·4· - ·12· x ·40·mm oblong hole
Damper panel Sealing material
368 1266
154 154
22

Sealing materi
Sealing material al

ACCESSORIES
OPTIONS &
RA
EA
Return air from room
Exhaust air to outdoors Room air
272

Exhaust air
222

162
211
491

Sealing material
887

211
933
920
493

162
220
272

SA
OA Supply air to room
Fresh outdoor air Supply air
Outdoor air
Supply air fan
TOOLS & PLATFORMS
186

Switch box
Option ·KRP2A51·
22

154 154
Mounting plate
200-300
≥ 700

Sealing material
500

Inspection hole Option ·BRP4A50A·


Sealing material

1100
Maintenance space for the air filters, heat exchangers and fans
Heat exchanger
TECHNICAL
DRAWINGS

83 1354 83

Switch box
262
245

Air filter
Maintenance cover
Notes :
PREVIOUS

1. To allow for the inspection of the air filters, heat exchangers, and fans, be sure to provide the inspection hole.
3D113502A

65
VIEW ALL VAM-FC9 TECHNICAL VIEW ALL VAM-J TECHNICAL
DRAWINGS ON MY.DAIKIN.EU DRAWINGS ON MY.DAIKIN.EU

Detailed technical drawings

VAM800-1000J
Ceiling hook
·4· - ·12· x ·40·mm oblong hole Damper panel
368 Exhaust air fan 1266
154 Sealing material 154

22
Sealing material
RA
Return air from room
EA

399
Exhaust air to
162
Room air

239

606
outdoors 212

1144
212

1172
1189
Exhaust air

628

207
162 Sealing material SA

389
Supply air to room
Supply air
OA Supply air fan
Fresh outdoor air
Sealing material
Outdoor air

192

22
154 154
Sealing material

200-300
≥ 850
Inspection hole

650
Sealing material

Switch box
Maintenance space for the air filters, heat 1100
exchangers and fans
Heat exchanger
83 1354 83
Sealing material
262
245

Maintenance cover Switch box


Notes : Air filter

1. To perform maintenance on the air filter, it is required to provide a service access panel.

3D112817D

VAM1500-2000J

(2x) Exhaust air fan Ceiling hook Damper panel


·4· - ·14· x ·40·mm oblong hole
731 1266 (4x) Option ·EKPLEN200· 150 345
384 150 Sealing material
20

20

Sealing material
Sealing material
RA
380 (4x)

EA Return air from room


Exhaust air to outdoors Room air
360
348 250

Exhaust air
577
1144
1194

1172
1188
599

218

SA
OA Supply air to room
Fresh outdoor air Supply air
Outdoor air (2x) Supply air fan
198

20
20

345 150 150 384


≥ 850

Sealing material
200 - 300

Sealing
Sealing material Inspection hole
650

material

Maintenance space for the air filters, heat


exchangers and fans 1100 Switch box

Heat exchanger
130 261 1354 261 130
26

Sealing material

Option ·KRP2A51·
350
330

Mounting plate
621
405

Switch box

Option ·BRP4A50A·
24

10

Notes : Maintenance cover Air filter

1. To allow for the inspection of the air filters, heat exchangers, and fans, be sure to provide the inspection hole.

3D112818C

66
VIEW ALL VAM-J TECHNICAL VIEW ALL VAM-FC9 TECHNICAL
VAM150FC
DRAWINGS ON MY.DAIKIN.EU DRAWINGS ON MY.DAIKIN.EU

INTRO
Detailed technical drawings

VAM150FC9

250 20m

ERV/HRV BENEFITS
200
15m
External static pressure [Pa]

150 Ultra-high

MODULAR L SMART
10m

100
High

Low 5m
50
Ø 100
Pipe length

VAM/VKM
0
0 50 100 150 200 250
Air flow rate [m³/h]

Notes
1. The fan speeds are valid for ·230·V, ·50·Hz power supply.

AIR HANDLING UNITS


VAM250FC
4D100379

VAM250FC
4D100379
250

ACCESSORIES
OPTIONS &
200

Ultra-high
External static pressure [Pa]

Ø 150
150
Pipe length

High TOOLS & PLATFORMS


100 40m

Low 30m

50 20m

10m

0
0 50 100 150 200 250 300
TECHNICAL
DRAWINGS

Air flow rate [m³/h]

Notes
1. The fan speeds are valid for ·230·V, ·50·Hz power supply.

4D100380
PREVIOUS

4D100380

67
VIEW ALL VAM-FC9 TECHNICAL VIEW ALL VAM-J TECHNICAL
DRAWINGS ON MY.DAIKIN.EU DRAWINGS ON MY.DAIKIN.EU

Detailed technical drawings

VAM350J
250

UH15
200 Ultra-high speed
External static pressure [Pa]

External static pressure [Pa]


H15 125 m 300
150
UH8 100 m 250
L15
H8 200
100 75 m
UH1 150
L8
50 m UH15
100
50

L1 25 m 50 UH8
H1 Ø200
0 Duct length 0
UH1
100 150 200 250 300 350 400 450 150 200 250 300 350 400 450
Air flow rate [m³/h] Air flow rate [m³/h]
External static pressure [Pa]

External static pressure [Pa]


High speed Low speed
200 200 Ultra-high speed
High speed
150 150
Low speed
100 100
H15
50 50

0 H8 0 L15
H1300 L1 L8
150 200 250 350 400 450 100 150 200 250 300 350 400 450

Air flow rate [m³/h] Air flow rate [m³/h]

Notes Legend
1. The fan curves are determined with ·1/3· of the ESP on the outdoor side L1 = Low speed lower limit UH1 = Ultra-high speed lower limit
(·EA & OA·), and ·2/3· of the ESP on the indoor side (·RA & SA·). L8 = Low speed factory setting UH8 = Ultra-high speed factory setting
EA = Exhaust air L15 = Low speed upper limit UH15 = Ultra-high speed upper limit
OA = Outdoor air H1 = High speed lower limit
RA = Room air H8 = High speed factory setting
SA = Supply air H15 = High speed upper limit
2. Measured according to ·JIS B 8628 - 2003·
3D113493A

VAM500J
250
100 m

200
UH15 UH15
UH8 80 m
External static pressure [Pa]

External static pressure [Pa]

H15
H15 Ultra-high speed
150
H8 60 m 250
UH1
L15
L15
H8 200
100
H1 40 m 150
L8
100
50
20 m
L1 50 UH15
Ø200 UH8
0 Duct length 0 UH1
150 200 250 300 350 400 450 500 550 600 250 300 350 400 450 500 550 600
Air flow rate [m³/h] Air flow rate [m³/h]
High speed Low speed
External static pressure [Pa]

External static pressure [Pa]

200 200 Ultra-high speed


High speed
150 150 Low speed

100 100

50 50
H15
L15
0 H1 0
H8
200 250 300 350 400 450 500 550 600 150 200 L1 250 300 350 400 450 L8 500

Air flow rate [m³/h] Air flow rate [m³/h]


Notes Legend
1. The fan curves are determined with ·1/3· of the ESP on the outdoor L1 = Low speed lower limit H15 = High speed upper limit
side (·EA & OA·), and ·2/3· of the ESP on the indoor side (·RA & SA·). L8 = Low speed factory setting UH1 = Ultra-high speed lower limit
EA = Exhaust air L15 = Low speed upper limit UH8 = Ultra-high speed factory setting
OA = Outdoor air H1 = High speed lower limit UH15 = Ultra-high speed upper limit
RA = Room air H8 = High speed factory setting
SA = Supply air
2. Measured according to ·JIS B 8628 - 2003·
3D113494A

68
VIEW ALL VAM-J TECHNICAL VIEW ALL VAM-FC9 TECHNICAL
DRAWINGS ON MY.DAIKIN.EU DRAWINGS ON MY.DAIKIN.EU

INTRO
Detailed technical drawings

VAM650J
250

UH15
200
Ultra-high speed

ERV/HRV BENEFITS
UH8 200 m
External static pressure [Pa]

External static pressure [Pa]


250
H15
150
H8 160 m
200
UH1
100 L15 120 m 150
H1
80 m 100
L8 UH15
50
40 m 50
L1 UH8
Ø250
0 Duct length 0

MODULAR L SMART
250 350 450 550 650 750 350 450 550 650 UH1 750

Air flow rate [m³/h] Air flow rate [m³/h]

High speed Low speed


External static pressure [Pa]

250
External static pressure [Pa] 200

200
Ultra-high speed
150 High speed
150 Low speed
100
100
50
50

VAM/VKM
H15
L15
0 H1 H8 0 L1
250 350 450 550 650 750 250 30 450 550 L8 650 750

Air flow rate [m³/h] Air flow rate [m³/h]


Notes Legend
1. The fan curves are determined with 1/3 of the ESP on the outdoor L1 = Low speed lower limit H15 = High speed upper limit
side (EA & OA), and 2/3 of the ESP on the indoor side (RA & SA). L8 = Low speed factory setting UH1 = Ultra-high speed lower limit
EA = Exhaust air L15 = Low speed upper limit UH8 = Ultra-high speed factory setting

AIR HANDLING UNITS


OA = Outdoor air H1 = High speed lower limit UH15 = Ultra-high speed upper limit
RA = Room air H8 = High speed factory setting
SA = Supply air
2. Measured according to ·JIS B 8628 - 2003· 3D113495A

VAM800J
300

300 300

250
External static pressure [Pa]

External static pressure [Pa]

250 250
180m Ultra-highspeed
350
Ultra-high
Ultra-high
speedspeed

ACCESSORIES
200 180m 180m

OPTIONS &
150m 350300 350
200 200
150m 150m 300250 300
u 150 120m

u u
150 150 250200 250
120m 120m u
90m
100
200150 200
90m 90m u u
x 100 L8 100 60m
150100 150

x xL850 L1
L8 60m
30m
60m
x 100 50 100
50 50
L1 0 L1
,
30m
Ø250
30m
Duct length x 50 0x 50 TOOLS & PLATFORMS
300 400 500 600 700 800 , 900 ,
Ø250 Ø250
0 0 Air flow rate (m3/h) Duct length
Duct length
0
400
0
500 600 700 800 900
300 300 400 400 Air flow
500 500 rate [m³/h]
600 600 700 700 800 800 900 900
400 400 500 500 600 Air600flow rate700[m³/h]
Air flow rate (m /h)
700
3

800 800 900 900


Air flow rate
Air flow
(m /h)
3
rate (m /h)
3

Air flow rate (m3/h)


Air flow rate (m3/h)
300
High speed 250 Low speed
External static pressure [Pa]

External static pressure [Pa]

300 300
250
250 250
Ultra-high speed
200
250 250 High speed
200 200
150
200
, ,
Low speed
u 200 200

u
150
u
150 ,150
, , , -
150
100
150
H15 u
100
- -
100 100
100 100 H15 u
H15 u50
50
TECHNICAL
DRAWINGS

50 50
50 50
0 HS 0
400 500 600 700 800 900 300 400 500 600 700 800 900
0 0 HS HS 0 0
Air flow rate (m3/h) Air flow rate (m3/h)
400 400 500 500 600 600 700 700 800 800 900 900 300 300 400 400 500 500 600 600 700 700 800 800 900 900

Air flow rate


Air flow rate
Air (m /h)
flow [m³/h]
rate3
(m /h) 3
Air flow rate
Air flow rate
[m³/h]
Air flow
(m /h)
rate (m /h) 3 3

Notes Legend
1. The fan curves are determined with 1/3 of the ESP on the outdoor L1 = Low speed lower limit H15 = High speed upper limit
side (EA & OA), and 2/3 of the ESP on the indoor side (RA & SA). L8 = Low speed factory setting UH1 = Ultra-high speed lower limit
EA = Exhaust air L15 = Low speed upper limit UH8 = Ultra-high speed factory setting
OA = Outdoor air H1 = High speed lower limit UH15 = Ultra-high speed upper limit
RA = Room air H8 = High speed factory setting
PREVIOUS

SA = Supply air
2. Measured according to ·JIS B 8628 - 2003·
3D112837

69
VIEW ALL VAM-FC9 TECHNICAL VIEW ALL VAM-J TECHNICAL
DRAWINGS ON MY.DAIKIN.EU DRAWINGS ON MY.DAIKIN.EU

Detailed technical drawings

VAM1000J
300 Ultra-high speed
150m
UH15
350
250
UH8 120m 300
200 H15
External static
pressure [Pa]

250
UH1 90m
H8

External static
pressure [Pa]
150 200
L15
H1 150
100 UH15
L8 100
50 30m 50 UH8
L1 Ø250
Duct lenght 0 UH1
0
400 500 600 700 800 900 1000 1100 600 700 800 900 1000 1100
Air flow rate [m3/h] Air flow rate [m3/h]

High speed High speed


300 250
250
External static pressure [Pa]

External static pressure [Pa]


200
200
150
150
100
100
H15
50
50 L15
0 L1
0 H1 H8
400 500 600 700 L8 800 900
500 600 700 800 900 1000
Air flow rate [m3/h] Air flow rate [m3/h]

Notes Legend
1.The fan curves are determined with ·1/3· of the ESP on the outdoor side (·EA & OA·), L1 = Low speed lower limit
and ·2/3· of the ESP on the indoor side (·RA & SA). LB = Low speed factory setting
L15 = Low speed upper limit
EA= Exhaust air Ultra-high speed H1 = High speed lower limit
OA = Outdoor air High speed H8 = High speed factory setting
RA= Room air Low speed H15 = High speed upper limit
SA= Supply air UH1 = Ultra-high speed lower limit
UH8 = Ultra-high speed factory setting D112832
2. Measured according to ·JIS B 8628 - 2003· UH15 = Ultra-high speed upper limit
3D112832
VAM1500J
VAM1500J
300

UH15
External static pressure [Pa]

250
Ultra-high speed
350
H15
200 180m
External static pressure [Pa]

UH8 300
150m
150 250
H8 L15 120m
UH1 200
100 90m
UH15
H1 150
L8 60m
50
100
30m
L1 2xØ250
0 Duct length 50 UH8
700 900 1100 1300 1500 1700
0
UH1
Air flow rate [m³/h] 700 900 1100 1300 1500 1700

Air flow rate [m³/h]


High speed Low speed
300 250
External static pressure [Pa]
External static pressure [Pa]

250
200

200
150
150

100
100 H15

50 L15
50

H1 H8
0 0
L1 L8
700 900 1100 1300 1500 1700 700 900 1100 1300 1500
Air flow rate [m³/h]
Air flow rate [m³/h]

Legend
L1 = Low speed lower limit
Notes
1. The fan curves are determined with ·1/3· of the ESP on the outdoor side (·EA & OA·),and ·2/3· of the ESP on the indoor side (·RA & SA·). L8 = Low speed factory setting
EA = Exhaust air L15 = Low speed upper limit
OA = Outdoor air H1 = High speed lower limit
RA = Room air H8 = High speed factory setting
SA = Supply air H15 = High speed upper limit
2 .Measured according to ·JIS B 8628 - 2003· Ultra-high speed UH1 = Ultra-high speed lower limit
High speed
Low speed UH8 = Ultra-high speed factory setting
UH15 = Ultra-high speed upper limit 3D112838
3D112838

70
VIEW ALL VAM-J TECHNICAL VIEW ALL VAM-FC9 TECHNICAL
DRAWINGS ON MY.DAIKIN.EU DRAWINGS ON MY.DAIKIN.EU

INTRO
Detailed technical drawings

VAM2000J
300
150m
UH15
300
300
250 150m
UH15
150m
120m
Ultra-high speed
350
UH8 UH15

[Pa] [Pa]
[Pa] [Pa]

ERV/HRV BENEFITS
250 H15
250
200 300 Ultra-high speed

static pressure
static pressure

120m
120m 350
350
UH1 UH8
UH8 90m

[Pa]
[Pa]

H15 250
200
200
H8 H15 300
150 300

pressure
pressure

static pressure
static pressure

UH1
L15
UH1 90m 200
90m
H1 H8 60m 250
250
H8
150
150 150
100 L15
L8 L15 200
200 UH15
External

External
static
static

H1
H1 60m
60m 100
30m 150
150
100
100
50 L8 UH15
UH15
L1 L8
External

External
50 UH8
External

External
2xØ250 100
100
30m
30mlength
Duct UH1
50 0
50
0L1 501200 UH8
L1 50 1400 1600 1800 2000 UH8
2200
800 1000 1200 1400 1600 1800 2000 2xØ250
2xØ250
2200
Duct
Duct length Air flow rate [m³/h]UH1

MODULAR L SMART
Air flow rate [m³/h] length 0
0 UH1
0
0 1200
1200 1400
1400 1600
1600 1800
1800 2000
2000 2200
2200
800
800 1000
1000 1200
1200 1400
1400 1600
1600 1800
1800 2000
2000 2200
2200
High
Air speed
Air flow
flow rate
rate [m³/h]
[m³/h] Low speed Air flow rate [m³/h]
300 250

[Pa] [Pa]
High speed Low speed
[Pa] [Pa]

250
250

static pressure
300
300 200
250
static pressure

[Pa]
200
[Pa]

250
250 pressure
static pressure 200
150
200
pressure
static pressure

150
200
200
150
100
150
100
External

150
static

150
H15
External
static

100
50
100
50
100
100
External
External

L15
H15
H15
External

H8
External

0 H1 50
0 L1
50 50 L8

VAM/VKM
501000 1200 1400 1600 1800 2000 800 1000 1200 1400 1600 1800
L15
L15
Notes
0
0
Air flow rate H1
[m³/h]
H1
H8
H8 0
0
L1
L1 Air flow rate [m³/h]
L8
L8 1600
1000
1000 1200
1200 1400
1400 1600
1600 1800
1800
1. The fan curves are determined with ·1/3· of the ESP on the outdoor side (·EA & OA·), and ·2/3· of the ESP on the indoor side (·RA & SA·).
2000
2000 800
800 1000
1000 1200
1200 Legend
1400
1400 1600 1800
1800

EA = Exhaust air
Notes Air flow rate [m³/h] Air flow rate [m³/h]
L1 = Low speed lower limit
OA = Outdoor air
1. RAfan
1. The
The = curves
fan Room air
curves are
are determined
determined withwith ·1/3·
·1/3· of the ESP
of the ESP on
on the
the outdoor
outdoor side
side (·EA
(·EA &
& OA·), and ·2/3·
OA·), and ·2/3· of the ESP
of the ESP on
on the
the indoor
indoor side
side (·RA
(·RA &
& SA·).
SA·).
Legend
L8 = Low speed factory setting
SA =
EA
EA = Supply
Exhaustair
Exhaust air
air L15 = Low speed upper limit
L1 = Low speed lower limit
OA
OA =
2 Measured= Outdoor
Outdoor
accordingair
airto ·JIS B 8628 - 2003· H1 = High speed lower limit
RA
RA == Room
Room air
air L8 = Low speed factory setting
SA
SA =
= Supply
Supply air
air H8 = High speed factory setting
L15 = Low speed upper limit
H15 = High speed upper limit
22 Measured
Measured according
accordingtoto ·JIS
·JIS B
B 8628
8628 -- 2003·
2003· H1 = High speed lower limit
Ultra-high speed UH1 = Ultra-high speed lower limit

AIR HANDLING UNITS


H8 = High speed factory setting
High speed UH8 = Ultra-high speed factory setting
Low speed H15 = High speed upper limit
Ultra-high speed
UH15
UH1
=
=
Ultra-high speed upper limit
Ultra-high speed lower limit 3D112839
High speed UH8 = Ultra-high speed factory setting
Low speed UH15 = Ultra-high speed upper limit

ACCESSORIES
OPTIONS &
TOOLS & PLATFORMS
TECHNICAL
DRAWINGS
PREVIOUS

71
VIEW ALL VKM-GB(M) TECHNICAL
DRAWINGS ON MY.DAIKIN.EU

Detailed technical drawings

VKM50GB
VKM50GB

Air discharge grille


(locally procured)
Air suction grille
(locally procured)
Heat insulator
(locally procured)

EA Heat insulated
(Exhaust air to outdoors) Branch duct (locally procured)
(locally procured)
Round shape hood
(locally procured)
OA
(Fresh air to outdoors)
Control box

More than 600


Flexible duct Air discharge grille
Inspection Inspection (locally procured) (locally procured)
Maintenance space for the heat exchanger hatch hatch
elements the air filters and fans

360 (in case of □ 450 inspection hatch)


140 (in case of □ 600 inspection hatch)

Refrigerant piping (Gas pipe)


(Ø 12.7 flare connection)
A gradient of
more than 1/30 Refrigerant piping (Liquid pipe)
(Ø 6.4 flare connection)
Ø 200
Nominal diameter
(locally procured)

OA
(Fresh air to outdoors)
EA
(Exhaust air to outdoors)
Suspention bolt
Sloping downwards at (locally procured) SA
Inspection hatch RA
a gradient of the 1/100 (locally procured) (Return air from room) (Return air from room)

NOTES
1. Leave space for servicing the unit and include inspection hatch. (Always open a hole on the side of the control box so that the air filters heat exchange elements, and fans can easily be
inspected and serviced.)
2. Install the two outdoor ducts with down slope (slope of 1/30 or more) to prevent entry of rain water, also, provide insulation for three ducts (outdoor ducts and indoor supply air duct) to
prevent dew condensation.(Material: glass wool of 25mm thick)
3. Do not turn the unit upside down.
4. Make sure to install drain piping, and insulate drain piping to prevent dew condensation.
5. Keep the drain pipe short and sloping downwards at a gradient of at least 1/100 to prevent air from forming.
6. Do not use a bent cap or a round hood as the outdoor hood if they might get rained on directly (we recommend using a deep hood) (optional accessory).
7. In areas where freezing may occur, always take steps to prevent the pipes from freezing.
8. Do not place something which shouldn’t get wet at the below of this unit. The dew would fall at following case, where humidity is 80% more, or the exit of drain socket is choked up,
or the air filter is very dirty.
3D083014

3D083014
72
VIEW ALL VKM-GB(M) TECHNICAL
DRAWINGS ON MY.DAIKIN.EU

INTRO
Detailed technical drawings

VKM50GBM
VKM50GBM

ERV/HRV BENEFITS
Air discharge grille
(locally procured)
Air suction grille
(locally procured)
Heat insulator
(locally procured)

Heat insulated
EA (locally procured)
(Exhaust air to outdoors) Branch duct
Round shape hood (locally procured)
(locally procured)

MODULAR L SMART
OA
(Fresh air to outdoors)
Control box

More than 600


Flexible duct Air discharge grille
Inspection Inspection (locally procured) (locally procured)
Maintenance space for the heat exchanger hatch hatch
elements the air filters, fans and humidifier

360 (in case of □ 450 inspection hatch)


140 (in case of □ 600 inspection hatch)
Water supply shut-off valve
Cistern tank (locally procured)
Drain valve

VAM/VKM
(locally procured) Refrigerant piping (Gas pipe)
A gradient of (Ø 12.7 flare connection)
more than 1/30 Strainer Refrigerant piping (Liquid pipe)
(locally procured) (Ø 6.4 flare connection)
Ø 200
Nominal diameter
(locally procured)

AIR HANDLING UNITS


OA
(Fresh air to outdoors)
EA
(Exhaust air to outdoors)
□ 450 - 600 Suspention bolt
(locally procured)
Sloping downwards at Inspection hatch RA SA
a gradient of the 1/100 (locally procured) (Return air from room) (Return air from room)

ACCESSORIES
OPTIONS &
NOTES
1. Leave space for servicing the unit and include inspection hatch. (Always open a hole on the side of the control box so that the air filters heat exchange elements, and fans can easily be
inspected and serviced.) TOOLS & PLATFORMS
2. Install the two outdoor ducts with down slope (slope of 1/30 or more) to prevent entry of rain water, also, provide insulation for three ducts (outdoor ducts and indoor supply air duct) to
prevent dew condensation. (Material: glass wool of 25mm thick)
3. Do not turn the unit upside down.
4. Use city water or clean water.
Include water supply piping with strainer, a water supply shut-off valve, and a drain valve (both locally procured) somewhere along the water supply piping that can be reached from the
inspection.
5. It is impossible to connect the water supply piping directly to public piping. Use a cistern tank (of the approved type), if you need to get your water supply from public piping.
6. Make sure the supply water 0.02MPa to 0.49MPa (0.2 kg/cm2 to 5 kg/cm2 )
7. Make sure the supply water is between 5°C and 40°C in temperature.
8. Insulate the water supply piping to prevent condensation from forming.
9. Make sure to install drain piping, and insulate drain piping to prevent dew condensation.
10. Keep the drain pipe short and sloping downwards at a gradient of at least 1/100 to prevent air from forming.
11. Install in a location where the air around the unit or taken into the humidifier will not drop below 0°C.
TECHNICAL
DRAWINGS

12. Do not use a bent cap or a round hoodas the outdoor hood if they might get rained on directly (we recommend using a deep hood) (optional accessory).
13. In areas where freezing may occur, always take steps to prevent the pipes from freezing.
14. Do not place something which shouldn’t get wet at the below of this unit. The dew would fall at following case, where humidity is 80% more, or the exit of drain socket is choked up, or the
air filter is very dirty.
15. Feed clean water. If the supply water is hard water, use a water softener because of short life.
Life of humidifying element is about 3 years (4,000 hours), under the supply water conditions of hardness: 150 mg/L. (Life of humidifying element is about 1 years (1500 hours), under the
supply water conditions of hardness: 400 mg/L.)
3D083011
PREVIOUS

3D083011
73
VIEW ALL VKM-GB(M) TECHNICAL
DRAWINGS ON MY.DAIKIN.EU

Detailed technical drawings


VKM80GB
VKM80GB

Air suction grille Air discharge grille


Heat insulator (locally procured) (locally procured)
(locally procured)

Heat insulated
EA Branch duct (locally procured)
(Exhaust air to outdoors)
(locally procured)
Round shape hood
(locally procured)
OA Silencer
(Fresh air to outdoors)
(locally procured)
Control box Flexible duct Air discharge grille

More than 600


(locally procured) (locally procured)
Inspection Inspection
Maintenance space for the heat exchanger hatch hatch
elements the air filters and fans

360 (in case of □ 450 inspection hatch)


140 (in case of □ 600 inspection hatch)

Refrigerant piping (Gas pipe)


A gradient of (Ø 12.7 flare connection)
Ø 250 more than 1/30 Refrigerant piping (Liquid pipe)
Nominal diameter (Ø 6.4 flare connection)
(locally procured)

OA
(Fresh air to outdoors)
EA
(Exhaust air to outdoors)
□ 450 - 600 Suspention bolt
(locally procured)
Sloping downwards at Inspection hatch RA SA
a gradient of the 1/100 (locally procured) (Return air from room) (Return air from room)

NOTES
1. Leave space for servicing the unit and include inspection hatch. (Always open a hole on the side of the control box so that the air filters heat exchange elements, and fans can easily be
inspected and serviced.)
2. Install the two outdoor ducts with down slope (slope of 1/30 or more) to prevent entry of rain water, also, provide insulation for three ducts (outdoor ducts and indoor supply air duct) to
prevent dew condensation. (Material: glass wool of 25mm thick)
3. Do not turn the unit upside down.
4. Make sure to install drain piping, and insulate drain piping to prevent dew condensation.
5. Keep the drain pipe short and sloping downwards at a gradient of at least 1/100 to prevent air from forming.
6. Do not use a bent cap or a round hood as the outdoor hood if they might get rained on directly (we recommend using a deep hood) (optional accessory).
7. In areas where freezing may occur, always take steps to prevent the pipes from freezing.
8. Do not place something which shouldn’t get wet at the below of this unit. The dew would fall at following case, where humidity is 80% more, or the exit of drain socket is choked up, or the
air filter is very dirty.

3D083015

3D083015
74
VIEW ALL VKM-GB(M) TECHNICAL
DRAWINGS ON MY.DAIKIN.EU

INTRO
Detailed technical drawings

VKM80GBM
VKM80GBM

ERV/HRV BENEFITS
Air suction grille Air discharge grille
Heat insulator (locally procured) (locally procured)
(locally procured)

Heat insulated
EA Branch duct (locally procured)
(Exhaust air to outdoors)
(locally procured)

MODULAR L SMART
Round shape hood
(locally procured)
OA
(Fresh air to outdoors) Silencer
(locally procured)
Control box Flexible duct Air discharge grille

More than 600


(locally procured) (locally procured)
Inspection Inspection
Maintenance space for the heat exchanger hatch hatch
elements the air filters, fans and humidifier

360 (in case of □ 450 inspection hatch)


140 (in case of □ 600 inspection hatch)

VAM/VKM
Water supply shut-off valve
Cistern tank (locally procured)
Drain valve
(locally procured) Refrigerant piping (Gas pipe)
(Ø 12.7 flare connection)
A gradient of
more than 1/30 Strainer Refrigerant piping (Liquid pipe)
(locally procured) (Ø 6.4 flare connection)
Ø 250
Nominal diameter

AIR HANDLING UNITS


(locally procured)

OA
(Fresh air to outdoors)
EA
(Exhaust air to outdoors) Suspention bolt
□ 450 - 600 (locally procured)
Sloping downwards at Inspection hatch RA SA
a gradient of the 1/100 (locally procured) (Return air from room) (Return air from room)

ACCESSORIES
OPTIONS &
NOTES
1. Leave space for servicing the unit and include inspection hatch. (Always open a hole on the side of the control box so that the air filters heat exchange elements, and fans can easilybe
inspected and serviced.) TOOLS & PLATFORMS
2. Install the two outdoor ducts with down slope (slope of 1/30 or more) to prevent entry of rain water, also, provide insulation for three ducts (outdoor ducts and indoor supply air duct) to
prevent dew condensation. (Material: glass wool of 25mm thick)
3. Do not turn the unit upside down.
4. Use city water or clean water.
Include water supply piping with strainer, a water supply shut-off valve, and a drain valve (both locally procured) somewhere along the water supply piping that can be reached from the
inspection
5. It is impossible to connect the water supply piping directly to public piping. Use a cistern tank (of the approved type), if you need to get your water supply from public piping.
6. Make sure the supply water 0.02MPa to 0.49MPa (0.2 kg/cm2 to 5 kg/cm2 )
7. Make sure the supply water is between 5°C and 40°C in temperature.
8. Insulate the water supply piping to prevent condensation from forming.
9. Make sure to install drain piping, and insulate drain piping to prevent dew condensation.
10. Keep the drain pipe short and sloping downwards at a gradient of at least 1/100 to prevent air from forming.
11. Install in a location where the air around the unit or taken into the umidifier will not drop below 0°C.
TECHNICAL
DRAWINGS

12. Do not use a bent cap or a round hood as the outdoor hood if they might get rained on directly (we recommend using a deep hood) (optional accessory).
13. In areas where freezing may occur, always take steps to prevent the pipes from freezing.
14. Do not place something which shouldn’t get wet at the below of this unit. The dew would fall at following case,where humidity is 80% more, or the exit of drain socket is choked up, or the
air filter is very dirty.
15. Feed clean water. If the supply water is hard water, use a water softener because of short life.
Life of humidifying element is about 3 years (4,000 hours), under the supply water conditions of hardness: 150 mg/L. (Life of humidifying element is about 1 years (1500 hours), under the
supply water conditions of hardness: 400 mg/L.)

3D083012
PREVIOUS

3D083012
75
VIEW ALL VKM-GB(M) TECHNICAL
DRAWINGS ON MY.DAIKIN.EU

Detailed technical drawings


VKM100GB
VKM100GB

Air suction grille Air discharge grille


Heat insulator (locally procured) (locally procured)
(locally procured)

Heat insulated
EA Branch duct (locally procured)
(Exhaust air to outdoors)
(locally procured)
Round shape hood
(locally procured)
OA Silencer
(Fresh air to outdoors)
(locally procured)
Control box Flexible duct Air discharge grille

More than 600


(locally procured) (locally procured)
Inspection Inspection
Maintenance space for the heat exchanger hatch hatch
elements the air filters and fans

360 (in case of □ 450 inspection hatch)


140 (in case of □ 600 inspection hatch)

Refrigerant piping (Gas pipe)


A gradient of (Ø 12.7 flare connection)
more than 1/30 Refrigerant piping (Liquid pipe)
(Ø 6.4 flare connection)
Ø 250
Nominal diameter
(locally procured)

OA
(Fresh air to outdoors)
EA
(Exhaust air to outdoors)
□ 450 - 600 Suspention bolt
Sloping downwards at Inspection hatch (locally procured) RA SA
a gradient of the 1/100 (locally procured) (Return air from room) (Return air from room)

NOTES

1. Leave space for servicing the unit and include inspection hatch. (Always open a hole on the side of the control box so that the air filters heat exchange elements, and fans can easily be
inspected and serviced.)
2. Install the two outdoor ducts with down slope (slope of 1/30 or more) to prevent entry of rain water, also, provide insulation for three ducts (outdoor ducts and indoor supply air duct) to
prevent dew condensation. (Material: glass wool of 25mm thick)
3. Do not turn the unit upside down.
4. Make sure to install drain piping, and insulate drain piping to prevent dew condensation.
5. Keep the drain pipe short and sloping downwards at a gradient of at least 1/100 to prevent air from forming.
6. Do not use a bent cap or a round hood as the outdoor hood if they might get rained on directly (we recommend using a deep hood) (optional accessory).
7. In areas where freezing may occur, always take steps to prevent the pipes from freezing.
8. Do not place something which shouldn’t get wet at the below of this unit. The dew would fall at following case, where humidity is 80% more, or the exit of drain socket is choked up, or the
air filter is very dirty.

3D083016

3D083016
76
VIEW ALL VKM-GB(M) TECHNICAL
DRAWINGS ON MY.DAIKIN.EU

INTRO
Detailed technical drawings

VKM100GBM
VKM100GBM

ERV/HRV BENEFITS
Air suction grille Air discharge grille
Heat insulator (locally procured) (locally procured)
(locally procured)

Heat insulator
EA Branch duct (locally procured)
(Exhaust air to outoors)
(locally procured)
Round shape hood

MODULAR L SMART
(locally procured)
OA Silencer
(Fresh air from outdoors)
(locally procured)
Control box Flexible duct Air discharge grille

More than 600


(locally procured) (locally procured)
Inspection Inspection
Maintenance space for the heat exhanger hatch hatch
elements the air filters, fans and humidifier

360 (in case of □ 450 inspection hatch)


140 (in case of □ 600 inspection hatch)

VAM/VKM
Water supply shut-off valve
Cistern tank (locally procured) Drain valve
(locally procured) Refrigerant piping (Gas pipe)
(Ø 12.7 flare connection)
A gradient of
more than 1/30 Strainer Refrigerant piping (Liquid pipe)
(accessory) (Ø 6.4 flare connection)
Ø 250
Nominal diameter

AIR HANDLING UNITS


(locally procured)

OA
(Fresh air from outdoors)
EA
(Exhaust air to outdoors) □ 450 • 600 Suspension bolt
Sloping downwards at a Inspectionhatch (locally procured) RA SA
gradient of the 1/100 (Return air from room) (Return air to room)
(locally procured)

ACCESSORIES
OPTIONS &
NOTES

1. Leave space for servicing the unit and include inspection hatch. (Always open a hole on the side of the control box so that the air filters, heat exchange elements, fans and humidifier
elements can easily be inspected and serviced.) TOOLS & PLATFORMS
2. Install the two outdoor ducts with down slope (slope of 1/30 or more) to prevent entry of rain water. Also, provide insulation for three ducts (outdoor ducts and indoor supply air duct) to
prevent dew condensation. (Material: glass wool of 25mm thick)
3. Do not turn the unit upside down.
4. Use city water or clean water.
Include water supply piping with strainer, a water supply shut-off valve, and a drain valve (both locally procured) somewhere along the water supply piping that can be reached from the
inspection.
5. It is impossible to connect the water supply piping directly to public piping. Use a cistern tank (of the approved type), if you need to get your water supply from public piping.
6. Make sure the supply water 0.02MPa to 0.49MPa (0.2 kg/cm2 to 5 kg/cm2 )
7. Make sure the supply water is between 5°C and 40°C in temperature.
8. Insulate the water supply piping to prevent condensation from forming.
9. Make sure to install drain piping, and insulate drain piping to prevent dew condensation.
10. Keep the drain pipe short and sloping downwards at a gradient of at least 1/100 to prevent air from forming.
TECHNICAL
DRAWINGS

11. Install in a location where the air around the unit or taken into the humidifier will not drop below 0°C.
12. Do not use a bent cap or a round hood as the outdoor hood if they might get rained on directly (we recommend using a deep hood) (optional accessory).
13. In areas where freezing may occur, always take steps to prevent the pipes from freezing.
14. Do not place something which shouldn’t get wet at the below of this unit. The dew would fall at following case, where humidity is 80% more, or the exit of drain socket is choked up, or the
air filter is very dirty.
15. Feed clean water. If the supply water is hard water, use a water softener because of short life.
Life of humidifying element is about 3 years (4,000 hours), under the supply water conditions of hardness: 150 mg/L. (Life of humidifying element is about 1 years (1500 hours), under the
supply water conditions of hardness: 400 mg/L.)

3D083013
PREVIOUS

3D083013
77
VIEW ALL VKM-GB(M) TECHNICAL
DRAWINGS ON MY.DAIKIN.EU

Detailed technical drawings

VKM50GB
VKM50GB
–––––– 50Hz, 220V-240V Exchange
efficiency
Operating air flow rate range (%)

Temp
eratu
re ex
chan
ge eff
Enth icienc Operating air flow rate range Operating air flow rate range Operating air flow rate range
alpy y
exch
ange
efficie
Enth ncy (
alpy heati
exch ng)
ange
effic ø200
ienc
y (co
oling Pipe
)
length
External static pressure (Pa)

Ultra High

External static pressure (Pa)

High

Low

Air flow rate[m³/h] Air flow rate[m³/h] Air flow rate[m³/h] Air flow rate[m³/h]
Low High Ultra High

[Reading of Performance Characteristics]

1) For example: 19(29)- -07 2) Rated point: ●


Mode no. : 19(29) 3) The characteristic of each tap becomes a setup of the
First code: (Supply ┌ 2 Exhaust ┌ 3 )
Second code no. : 07
┘ ┘ characteristic of the same code number.
3D082904
3D082904

VKM50GBM
VKM50GBM
–––––– 50Hz, 220V-240V Exchange
efficiency
Operating air flow rate range (%)

Temp VKM50GBM
erature
excha
nge e
Enth fficien
alpy cy
exch
ange
effic
ienc
Enth y (he
alpy
exch
ating
) Operating air flow rate range Operating air flow rate range Operating air flow rate range
ange
efficie ø200
ncy (
cooli Pipe
ng)
External static pressure (Pa)

length
External static pressure (Pa)

Ultra High

High

Low

Air flow rate[m³/h] Air flow rate[m³/h] Air flow rate[m³/h] Air flow rate[m³/h]
Low High Ultra High

[Reading of Performance Characteristics]

1) For example: 19(29)- -07


Mode no. : 19(29) 2) Rated point: ●
First code: (Supply ┌ 2 Exhaust ┌ 3 ) 3) The characteristic of each tap becomes a setup of the
Second code no. : 07
┘ ┘ characteristic of the same code number. 3D082901
3D082901

78
VIEW ALL VKM-GB(M) TECHNICAL
DRAWINGS ON MY.DAIKIN.EU

INTRO
Detailed technical drawings

VKM80GB
VKM80GB
–––––– 50Hz, 220V-240V Exchange
efficiency
Operating air flow rate range (%) Operating air flow rate range Operating air flow rate range Operating air flow rate range

ERV/HRV BENEFITS
Tem
pera
ture
exch
ange
Enth efficie
alpy ncy
exch
ange
effic
Enth ienc
alpy y (he
exch ating

External static pressure (Pa)


ange )
External static pressure (Pa)

effic
ienc
y (co
oling

MODULAR L SMART
)

Ultra High

High ø250
Pipe
length

Low

VAM/VKM
Air flow rate[m³/h] Air flow rate[m³/h] Air flow rate[m³/h] Air flow rate[m³/h]
Low High Ultra High

[Reading of Performance Characteristics]

1) For example: 19(29)- -07


2) Rated point: ●

AIR HANDLING UNITS


Mode no. : 19(29)
First code: (Supply ┌ 2 Exhaust ┌ 3 ) 3) The characteristic of each tap becomes a setup of the
Second code no. : 07
┘ ┘ characteristic of the same code number. 3D082905
3D082905

VKM80GBM
VKM80GBM
–––––– 50Hz, 220V-240V
Exchange
Operating air flow efficiency
Operating air flow rate range Operating air flow rate range Operating air flow rate range
rate range (%)

ACCESSORIES
OPTIONS &
VKM80GBM

Tempe
rature e
xchang
Enth e efficie
alpy ncy
exch
ang
e ef
Enth ficie
External static pressure (Pa)

alpy ncy
exch (hea
External static pressure (Pa)

ting) TOOLS & PLATFORMS


ange
effic
ienc
y (co
oling
)

Ultra High ø250


Pipe
length
High

Low
TECHNICAL
DRAWINGS

Air flow rate[m³/h] Air flow rate[m³/h] Air flow rate[m³/h] Air flow rate[m³/h]
Low High Ultra High

[Reading of Performance Characteristics]

1) For example: 19(29)- -07


Mode no. : 19(29) 2) Rated point: ●
First code: (Supply ┌ 2 Exhaust ┌ 3 )
PREVIOUS

3) The characteristic of each tap becomes a setup of the


Second code no. : 07
┘ ┘ characteristic of the same code number. 3D082902
3D082902

79
VIEW ALL VKM-GB(M) TECHNICAL
DRAWINGS ON MY.DAIKIN.EU

Detailed technical drawings

VKM100GB
VKM100GB
–––––– 50Hz, 220V-240V
Exchange
efficiency
Operating air flow rate range (%)

Operating air flow rate range Operating air flow rate range Operating air flow rate range
Tem
pera
Ent ture
halp exc
y ex han
cha ge e
nge fficie
effic ncy
ienc
Ent y (h
eatin
External static pressure (Pa)

hal g)
py
exc
han
ge
effi

External static pressure (Pa)


cien ø250
cy (
coo Pipe
ling
)
length
Ultra High

High

Low

Air flow rate[m³/h] Air flow rate[m³/h] Air flow rate[m³/h]


Air flow rate[m³/h]
Low High Ultra High

[Reading of Performance Characteristics]

1) For example: 19(29)- -07


Mode no. : 19(29) 2) Rated point: ●
First code: (Supply ┌ 2 Exhaust ┌ 3 ) 3) The characteristic of each tap becomes a setup of the 3D082906
Second code no. : 07
┘ ┘ characteristic of the same code number.
3D082906

VKM100GBM
VKM100GBM
–––––– 50Hz, 220V-240V Exchange efficiency
(%)

Operating air flow rate


range

Operating air flow rate range Operating air flow rate range Operating air flow rate range
VKM100GBM
Tem
pera
ture
En exc
tha han
lpy ge e
exc fficie
han ncy
External static pressure (Pa)

ge
effi
En cie
tha ncy
lpy (he
exc atin
han
External static pressure (Pa)

g)
ge
effi
cie
ncy ø200
(co
olin Pipe
g)
length
Ultra High

High

Low

Air flow rate[m³/h] Air flow rate[m³/h] Air flow rate[m³/h] Air flow rate[m³/h]
Low High Ultra High

[Reading of Performance Characteristics]

1) For example: 19(29)- -07


Mode no. : 19(29) 2) Rated point: ●
First code: (Supply ┌ 2 Exhaust ┌ 3 ) 3) The characteristic of each tap becomes a setup of the
Second code no. : 07
┘ ┘ characteristic of the same code number. 3D082903
3D082903

80
Notes

81
TECHNICAL OPTIONS &
PREVIOUS DRAWINGS TOOLS & PLATFORMS AIR HANDLING UNITS VAM/VKM MODULAR L SMART ERV/HRV BENEFITS INTRO
ACCESSORIES
Notes

82
83
Premium efficiency
heat recovery unit
Modular L Smart

Premium quality to meet the most demanding needs


›› Best possible Indoor Air Quality thanks to optional pre-filters from Coarse 55% (G4)

up to ePM1 50% (F7) and second step filtration up to ePM1 80% (F9)
›› Plug & Play connectable to Sky Air and VRV for integrated control

›› High efficiency aluminium counter flow heat exchanger (up to 93%)

›› Maximum ESP available up to 600 Pa

›› Air flow from 150 up to 3,450 m³/h

›› Optional CO2 sensor saves energy while improving indoor air quality

›› Optional factory tested heater available to extend operation range

›› Low sound level

›› 6 standard sizes available from stock

Daikin Europe N.V.  Naamloze Vennootschap Zandvoordestraat 300 · 8400 Oostende · Belgium · www.daikin.eu · BE 0412 120 336 · RPR Oostende (Publisher)

The present publication is drawn up by way of information only and does not
constitute an offer binding upon Daikin Europe N.V. Daikin Europe N.V. has
compiled the content of this publication to the best of its knowledge. No express
or implied warranty is given for the completeness, accuracy, reliability or fitness
for particular purpose of its content and the products and services presented
ECPEN20-20311/19 therein. Specifications are subject to change without prior notice. Daikin Europe
N.V. explicitly rejects any liability for any direct or indirect damage, in the broadest
sense, arising from or related to the use and/or interpretation of this publication.
All content is copyrighted by Daikin Europe N.V.

Printed on non-chlorinated paper.

You might also like