You are on page 1of 1

*20000

*32115

*29165

*26165
*27400

*23165

*20165

*17115
*6700
*32200

*46200

*8015 *8015

*35100 *30500
*8015
*9995 *16110
*13315 indicative
*9815 retention
pond area

*8050 *16920
*12968
*16928
*12315

*9815

*47000

*48000

*37700

*21500

*9815 *30215
indicative
retention
pond area *27600

*35000

*39600

*29100

*20100
*35750

*9815

Hazard Description Rev. Date Description Drn. Chkd. Appd. Issue Status:
CDM Issues - Significant/Residual Hazards: Measure/Location/Reference Key: Key Plan:
Notes:
Fall from height 1. Do not scale from this drawing.
Falling objects 2. Dimensions are in millimetres (mm) unless otherwise stated.
All designers involved in this drawing are to ensure that all forseeable Significant Hazards Project Title:
Hazardous materials 3. This drawing is to be read in conjunction with all relevant Architectural, Civil, Structural and
Client
relating to this drawing are indicated below.
Service Engineer's drawings, schedules and specifications.
Significant Hazards are not necesserialy those that resulot in the greatest risks, but those that Uncontrolled substances
are: Site transport/plant
Crushing/entrapment
Name
• Unlikely to be obvious to a competent contractor or other designers; Drawing Title:
Hazardous operations
• Unusual;
Confined spaces
• Likely to be difficult to manage effectively.
Noise
As a design and building project, the Main Contractor is deemed to be a designer under the Dust
CDM Regulations as well as the Client, Architect, Engineer or subcontractors. This risk Vibration (HAV)
schedule is not a design risk assessment of a full and complete risk schedule and should not be Manual handling
Scale @ A1: Date: Drawn: Checked: Approved: Job No.: Drawing No.: Revision:
deemed as such. Copies of the designers' risk assessment along with risk schedules are to be Asbestos
available from the Main Contractor's site office upon request.
Others 12 (GA)001b
Copyright ©

You might also like