Every grid operator, every region and every Some countries are very lax when it comes to
country impose different technical power system security. PV systems shoot up
requirements when it comes to connecting out of the ground and maximum solar energy
photovoltaic power plants to the transmission is fed into the grid which leads to a high PV
or distribution system. International grid penetration mostly in the distribution grids.
codes differ from German ones but on a This might work for a while with good-quality
European level network codes (NCs) such as electricity grids. But the end is in sight. Other
the NC Requirements for Generators (RfG) countries are aware of the need for action
harmonized grid connection requirements. due to raising fluctuating feed of renewable
Within the EU these application rules must be energies such as solar energy and have set
applied by April 27, 2019 at the latest. The themselves ambitious development targets.
international requirements are continuously For these countries, grid stability is already a
increasing and their diversity is enormous. matter of top priority.
3
As the system constructor is faced with a After all, EPC companies and investors
high diversity of components, the right benefit doubly from a turnkey system for
solution for controlling the planned system monitoring and power plant control. It is
is needed. It must be compatible with the economical and offers certainty during the
© 2018 meteocontrol GmbH 09/2018
The possibility of providing the Furthermore the blue’Log X-Control with its high focus on
controller’s simulation model also usability allows an easy commissioning process. The graphical
allows support for the grid operator’s assistance ensure a quick configuration without the need of
system studies (e.g. distributed having programming knowledge. Even complex grid connection
energy resource penetration studies). requirements can be considered through parameterizing the
Further expansions such as the controller.
integration of a VPN client offer key
benefits, especially for the solar power The configuration of characteristic curve control (e.g. reactive
trading interface which is typical in power-voltage Q (U) characteristic curve) gives the user a direct
Germany. As a result, you save time feedback regarding the desired control behavior. The risk of
and money. misconfiguration can be reduced to a minimum.
© 2018 meteocontrol GmbH 09/2018
5
Model Type
> Symmetrical steady-state
(RMS) model
Software Environment
> PSS/E
> PowerFactory
> MATLAB/Simulink