J-+11014/4/2016-RH-Part (1)
Government of India
Ministry of Rural Development
Department of Rural Development
To,
The Managing Director,
National Housing Bank,
Core-5A, India Habitat Centre,
Lodhi Road, New Delhi - 110003
Krishi Bhawan, New Delhi
Dated:2 ‘April 2019
Subject: Amendments in guidelines of Rural Housing Interest Subsidy Scheme-Reg..
Madam,
In continuation to NHB‘s letter dated 13.02.2019, I am directed to say that the
following Sub-Paras of RHISS guidelines have been amended:
[Para No. JExisting Paragraph/subJAmended Paragraph/sub-paragraph
aragraph
5 [The universe of beneficiaries|The universe of beneficiaries, eligible to receivel
fligible to receive central
sistance under this scheme)
lwill include any rural
household which does not
lappear/figure on —_thel
lpermanent waitlist for Pradhai
intri Awaas Yojana- Gramin|
entral assistance under this scheme, will include|
ny rural household that does not appear/figure
on the permanent waitlist for Pradhan Mantri
{Awaas Yojana- Gramin (PMAY-G). The uniquel
identifier that shall be used for deduplication|
shall be Aadhaar number. It shall be the|
sponsibility of the PLI to collect Aadhai
(PMAY-G). lumber of the beneficiary.
[6 [The RHISS will become|The RHISS will become effective from the date o!
fective from the date offoperationalisation of the scheme guidelines thai
perationalisation of _thelis 19th June 2017 and is aimed at providin,
[scheme guidelines and is aimedlassistance to households in rural areas ti
it providing houses or modify their existing|
lnouseholds in rural areas t
construct houses or modify
their existing dwelling units.
assistance efi
welling units. The interest subsidy shall bel
iisbursed to loan applicants who had applied for
loan post 19 June 2017 in compliance witl
HB’s requirements which include submission of
lself-declaration form, geo-referenced|
Iphotographs of the modified/constructed house
land other compliances as deemed important fro
——INHB’s end. NHB/PLI will do the due diligence
[Annexure\Checking eligibility based onjl) MoRD shall check whether the household]
I) Whether —~_householdlappears/figures on the Permanent Waitlist fo!
[Figure-1, Jappears/figures on _thePMAY-G
IStep4 [Permanent Waitlist for PMAY-2) PLIs to ensure that the household fulfill
Ic overage criteria defined in Para 2.1. The list o!
2) Whether household fulfillsstatutory town and planning areas (Urban) shalll
‘overage criteria defined infbe provided on the website of NHB
IPara 2.1)8) PLI to capture one geo-referenced photograph]
) Geo referencing of existingjof the existing dwelling/vacant site and one geo-
iwelling/vacant site throughireferenced photograph of the Work I
|AwaasApp to cross verify land|Progress/Completed house using the mobile
wvailability lapp provided by NHB to capture geo-referenced]|
. |photograph. In case the]
|modification/construction has already
\started/complete, at least one geo-referenced|
lphotograph of the Work In Progress/Completed|
lhouse shall be required
|AnnexureSubmission of _ UtilizationSubmission of Utilization Certificate along with|
I Certificate by PLIstoCNA the geo-referenced photograph(s) by PLIs to]
[Figure-2, |Central Nodal Agency. The next subsidy release|
[Step 3 Ito PLI shall be dependent on the submission o
required documents photographs.
2. The amendment may please be further communicated to all concerned.
3. This issues with the approval of the-Competent Authority.
Yours faithfully,
(Gaya Prasad)
Deputy Director General (RH)
Email: gaya.prasad@nic.in
eng