0% found this document useful (0 votes)
139 views5 pages

Calculation Sheet for Project Data

The document appears to contain tabular data from an engineering project including measurements of maximum load (R max), rotation (L), and other values across a range of conditions. The tables include headings of various parameters and their measured values at different settings. There are multiple data tables with measurements ranging from 500 to 2500 across different conditions.

Uploaded by

Dawit Solomon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views5 pages

Calculation Sheet for Project Data

The document appears to contain tabular data from an engineering project including measurements of maximum load (R max), rotation (L), and other values across a range of conditions. The tables include headings of various parameters and their measured values at different settings. There are multiple data tables with measurements ranging from 500 to 2500 across different conditions.

Uploaded by

Dawit Solomon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

R max R max L @ max R 20 25 30 35 37.

5
52.5 26.8 2500 2500 2500 2190 1820 1680
50 30.8 2500 2500 2500 2500 2150 1980
47.5 30.9 2500 2500 2500 2500 2160 1990
45 32.4 2500 2500 2500 2500 2290 2110
42.5 33.6 2500 2500 2500 2500 2380 2200
40 34.4 2500 2500 2500 2500 2450 2260
37.5 34.2 2500 2500 2500 2500 2440 2250
35 35 2500 2500 2500 2500 2500
30 30 2500 2500 2500 2500

R
52.5 500 625 657 637 630
50 500 625 750 752.5 742.5
47.5 500 625 750 756 746.25
45 500 625 750 801.5 791.25
42.5 500 625 750 833 825
40 500 625 750 857.5 847.5
37.5 500 625 750 854 843.75
35 500 625 750 875
30 500 625 750
500 625 750 875 847.5
40 42.5 45 47.5 50 52.5
1550 1440 1340 1250 1170 1100
1840 1710 1590 1490 1400
1850 1720 1600 1500
1960 1820 1700
2040 1900
2100

620 612 603 593.75 585 577.5


736 726.75 715.5 707.75 700
740 731 720 712.5
784 773.5 765
816 807.5
840

840 807.5 765 712.5 700 577.5 875


Project:
Job Number:
Prepapred by
Checked by:
Date:

CALCULATION SHEET

REFERENCE
Project:
Job number:
Prepared by:
Checked by:
Date:
CALCULATIONS
REFERENCE TITLE:

You might also like