You are on page 1of 1
Price Quotation Date: 12/10/2022 Mr. Felix Liu Project Director Pasay Reclamation Development Project China Harbour Engineering Company Ltd. Dear Sir: After having carefully read and accepted the terms and conditions and TOR in the Request for Quotation (RFQ) for the project, entitled: Borehole Investigation for PRA2000 - Pasay Reclamation Development Project, we hereby submit our quotation corresponding to your requirements, Ttem no. | Description Quantity [Unit Quotation | 1 Manpower and equipment 1 Ls 4,242,000 Mobilization, Demobilization & | Cleanup fee : 2 | Construction Safety & Health T Is 535,200 Program in the execution of the project 3___| Offshore Borehole drilling 9 | TestPoints | 5,261,800 4 | Laboratory testing: Particle size distribution including 4.1 | sedimentation analysis using 45 Pertest 111,000 hydrometer method Organic matter a Pertest 8,100 L | Determination of carbonate content 9 Per test 15,000 | Direct Shear Test (Shear Box test) 9 Pertest 21,000 Minimum / Maximum density 9 Pertest | 18,200 Specific Gravit 9 Pertest 12,100 Angularit 9 Per test. 15,200 Hardness [9 Pertest 50,400 Final report 1 LS | 816,000 Total [11,106,000 ‘Note: The currency is peso and the price is inclusive of the VAT. Well shall complete the works in accordance with the Drawing, Project Specification, and ‘Term of Reference within _36_ Calendar Days beginning on the date specified in the Notice to Proceed. Enclosed herewith also are the computations of the cost of all items of works including all duties and taxes inside and outside the Philippines. Very truly yours, Name/Position/signature biw Boeshi CSSC Institute of The Engineering Investigation and Design Co. L Address: Zhongshan north road 2150, Shanghai. Contact number: |&8 115% sf Email address: vgf3305@126.

You might also like