You are on page 1of 1

duct

cafe to
stage 03

1.95
off.
2.60

2.60 1.95
off.
3.95
1.90
off.

(open to below)
12.16
reception
7.51

4.60 to
stage 02
6.60
clinic
off.
1.60
1.80 -01-
3.95
off.
2.60 1.95

2.60
off.
1.95
4.60

6.60
clinic clinic
-02- -03-
6.60

4.60
reser.

2.20

2.00

equip. clinic
4.80 -04-
5.10
6.60

7.61 4.60
examination r.
-01-
control
r.
2.00
2.90

2.20

6.80

to
stage 02
6.30 waiting
examination r.
-02- area
7.50
6.30

equip.
4.24
3.70
w.c. service
1.50

duct

25 20 15 10 5 0
FIRST FLOOR PLAN

You might also like