Excel Construction Project Management Templates Request For Information Log Template

This document is a request for information (RFI) log for a construction project. It contains two open RFIs, one with an expedited priority regarding the status of plans and specifications, and another with a critical priority needing clarification on intended door heights in the plans. Both RFIs were requested by the prime contractor on 10/15/15 and were assigned to the project manager and architect respectively, with responses provided on 10/16/15.

Uploaded by

devendra mahadik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
253 views2 pages

Excel Construction Project Management Templates Request For Information Log Template

This document is a request for information (RFI) log for a construction project. It contains two open RFIs, one with an expedited priority regarding the status of plans and specifications, and another with a critical priority needing clarification on intended door heights in the plans. Both RFIs were requested by the prime contractor on 10/15/15 and were assigned to the project manager and architect respectively, with responses provided on 10/16/15.

Uploaded by

devendra mahadik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Request for Information Log: This section contains a structured table used to track requests for information, including reference, status, description, and responsible parties.
  • Continuation of Log: Continues the table form from the previous page, allowing for additional entries.

Prime Contractor:

Project Name: Request For Information Log


Project Manager:

Project Description:

RFI # Current Priority Request Description Requested By Assigned To Date Date


Date Required Responded Notes
Status Requested

001 Open Expedited Status of Plans & Specifications Prime Contractor Project Manager 10/15/15 10/16/15

002 Open Critical Need clarification on plans for intended door height Prime Contractor Architect 10/15/15 10/16/15

Standard

Prime Contractor:
Request For Information Log
Project Name:
Project Manager:
Project Description:
RFI #
Priority
Request Desc