Certificate
Name and address of issuer i Name and address of employer ii Form of Contract vi
Job reference
Date of issue ix
and the Contractor has supplied the specified documents and drawings relating
to the Contractor’s Designed Portion xi
and the Contractor has complied sufficiently with the contractual requirements
for the supply of documents and information relative to the CDM Regulations
iv As described in Contract
v As described in Contract
vi Insert form of SBCC Contract. This form, with the appropriate deletions, is only
appropriate for the following SBCC Contracts: SBC/Q or AQ or XQ/Scot
vii This is the date, or dates, of execution of the Contract (or, if no separate contract was
entered into, the dates of the documents making up the offer and its unqualified
acceptance constituting the contract)
viii This document is, under SBC/Q, AQ or XQ/Scot, a Certificate issued by the
Architect/CA. There should only be one such certificate
ix Please note that the date of practical completion of the Works is not necessarily the
date of issue of the relevant Certificate but is the date stated on the face of the
Certificate as the date when it was achieved. It should also be noted that in SBC/Q, QA
or XQ/Scot such certificate requires to be issued forthwith upon such practical
completion being achieved
xii Contract Administrator should check Contract for length of Rectification Period and
note date when it will expire in relation to the practical completion date for the Works
(schedule of defects needs to be issued not later than 14 days after the expiry of the
relevant Rectification Period)