Project Name :-
ITP No. : CHEC-ITP-00XX
Revision : 00
ITP Title :- General Concrete Works (On Site Concreting) Date : 15-03-214
Page N . : 1 of 6
o
‘H’ - Hold : A point beyond which work shall not proceed without formal approval by the appropriate inspectorate.
‘W’ - Witness : A point beyond which work may proceed without formal documented approval by any of the
inspectorate. A Inspection Request to inform the client is required, however work may proceed after 1
hour should the client fail to respond to the IR.
‘S’ - Surveillance : A point where Consultant and others may carry out surveillance of work in progress and
documentation associated on an unscheduled basis, with no notification required by any party and
without amendment to the scheduled programme.
‘R’ - Review : The documents are to be submitted to the appropriate inspectorate for review by Consultant/Client.
Note that where a document is subject to Client approval, work shall not proceed until Client approval
has been received.
‘Rcd’ - Record : Documents required for record purposes shall be filed and retained for Project Quality records.
‘C’ - Action : Required steps shall be taken by Sub Contactor to complete the activity.
‘I’ - Inspection : A point where all evaluation / verification is made prior to commencing subsequent activity. An IR to
inform the client is required, however work may proceed without the client responding to the IR.(Time
frame for proceeding the activity without approval to be as per contract conditions. )
CHEC Consultant
NO. DETAILS of REVISION
Checked Date Approved Date
ITP No. :
Revision : 00
ITP Title:- Date : 15-03-2014
Page N . : 2 of 6
o
Manufactures
Section 03300,Clasue 3.02 Drum rotating data.
1.2 Inspection of truck mixers K speed Minimum 7
RPM
IR /
Section 03300,Clasue 3.03 ACI 305R-91 Approved
Survey setting out and establishment Each work
1.3 Compliance to IFC section 4 Detailed report IFC and H H N/A
of benchmarks and reference lines activity
drawings Shop
drawing
Drawings/Chec Pre pour
klist: Checklist SPLL-
1.4 Clearance for pouring Concrete Section 03300,Clasue 3.04 Visual
SPLL/ALT/CL- ALT-F-CL-002
Every Pour H R NA
F-002
Method Method
Section 03300,Clauses
2.4 Compaction & Height of pour 3.04 H, 3.04K, 3.06
Visual statement Statement / Every Pour W S NA
/Specification Specification
Fishes of
surface should
be as specified
Section 03300,Clause 3.14 in the approved
2.5 Surface finish & IFC drawings
Visual
and as per
IR Every Pour W S NA
drawing and
project
specifications
VERIFYING
INSPECTION / TEST STAGE Test Method DOCUMENTS
Frequency
CRITERIA / SPECIFICATION (Visual or Verifying/Cont
/ PROCEDURE document rol Forms.
CHEC Consultant TPI
review)
Post concrete
Check concrete structure for defects- Section 03300,Clause 3.18 check list Each
IR / Method
3.3 Blowholes Honeycombs, Segregation & Approved Method Visual
statement SPLL-ALT-F- Elements for W S NA
and Cracks if any statement CL-005 & each pour
028
IR / Method
Section 03300 Clause 3.08
3.4 Early loading and Method statement
Visual statement / Record sheet Every Pour W W NA
Specifications
LEGEND
Inspection Authorities :