You are on page 1of 16
Tunnel ses Consolidation | $t2° Rigs ‘ST-120 ( Consolidation Rigs IMmec@ Nowadays, the increasing need and demand of transferring a series of infrastru the underground has brought about an impressive rise in the numbers of tunnel: onstructed, regardless of t oil to be penetrated of tunnels in| presence of unstable formations or in ls prone to landstie, requ f preventive consolidation of the arch and, f needed, of the walls and invert before the final lining is completed. sping of t = able to tackle any kind of The final aim is to each the tunnel stability i pensive temporary foup has designed and applied a tunnel consolidation technology known as RPUM (Reinforced Protective Umbrella System). The method finds its way in those tunnels with an Unstable or short term stable core face condition. The technology envisages in the installation of a series of sub-hori ments aiming at consolidating th beyond the face ofthe tunnel before can cut safely and speedily the excavation under the protection of the arch - like a shell - by using specially designed foro Ince such an operation is. cuite popular one especially in Europe, the tunnel is excavated usually in two stages jop heading and bench) or full ‘ace opening, under the protection provided by the consolidation and by instaling a temporary fining teers and sho! th excavation step Fs shorter than the length of the ve umbrella forepoling, so as to allow ‘an overlapping with the following series of ing. AS might be understood, the ‘entioned operations require pretty In order to avoid interruptions and delays in the working cycle, the operations must be performed to an extremely exact time yhedule, That means the consolidation inthe shortest possible time and at a constant rate ‘The technological development has therefore pursued two major ways: = The study and design equipment able confined t up in the required driling position and finally able to execute longer and longer sub- zontal of the right soiation in one single RPUM method thus dramatically reducing the cycle time. to reduce the number of supporting ribs = Design of the most suitable consolidation _to be installed. grout treatment for stabilizing the ‘excavation and featured by mechanical strength to allow for the excavation and 121 HP T2aew 181 HP 176 (2x90) 286+(2e121) Hh 1122 aN i 1650 daNm_ S857 6 1550 dali 18802550 mm 12500 kg 119000 kg CONSOLIDATION RIGS R.P.U.M, method ‘The RPUM method includes execution phases involving the installation of, either suitable reinforcing steel pipes, or of consolidated columns using the JET GROUTING system, reinforced by a steel Pipe. Using reinforcing pipes. the method consists in the installation of manchette- type steel pipes acting as reinforcement support for the next instalation of the stee! ribs. At the same time, they are also used {as grouting pipes thus forming a continuous canopy of consolidated soil 1. DRILLING PHASE: The ctiling can be performed either by rotation or rotopercussion (TUBEX-ODEX-Ike). In the frst case, the dling sting sel, ted with a crag bit at its end, is left in place, hile using the rote-percussion, isthe casing that has to be left in place. In both cases, the dling string or the casing, acting as reinforcing steel of the consolidation treatment, are fitted with special non-return valves , which are built Within the wall thickness of the steel pipes and are such as not to sutfer damages during the penetration ofthe soil 2. GROUTING PHASE: basically there are two possible grouting techniques: ‘The single valve injection technique, using 2 double packer placed across to each valve securing each individual valve is pressurization. b. The one shot technique for each individual fore pile by using @ packer placed at the top of the pipe, ‘The use of JET GROUTING reinforced ‘columns is also widely employed today thanks to its suitability in a variaty of sols ranging from gravel to clay, but especialy in very ficult conditions, where both weak solls and thin overburden are found. In fine sols, the column has a static function, while where there is water inflow it works as a barier against the water. ‘The execution phases of the so called Trevi Reinforced Jet Grouting in Progress (normally TT single fluid is suggested) can be described as follows. ~ The treatment is performed by driving both the rod and the casing simultaneously and performing the jetting during the penetration phase. The space between the rods and the pipe allows the Jetting spoil to escape. On completion of the driling/treatment, the jetting sting is extracted from the casing which remains inplace, acting as reinforcement. = This type of consolidation obviously requires a rig fitted with double head. = Diiling is carried out by using a rod string fitted with a monitor and a driling tool, either by rotation or roto-percussion. = During the driting phase, the inside fuid ‘escapes from the too tip, easing therefore the soil penetration and xeeping the griling to0l blades clean, = When the diiling is over, the jat is diverted by closing the bottom valve and the grout ‘escapes at high speed through the side nozzles, disaggregating and mixing the soil withthe grout and thus creating the consolidated column, During this phase the driling string is rotated and withdrawn at a pre-set rate. = The peculiarity of this system is that the reinforcing stee! pipe is installed during the jet grouting column execution. The jetting string and the casing rotate in ‘opposite senses. ~ The jetting ro itself, fitted withthe monitor, is located inside the string with the jet grouting monitor over-passing the reinforcement pipe mouth of 20 cm approximately = The grouts used are generally binary. Coment/Water following a ratio of 0.8 to 1 and 1.3 with, in case, of use of admixtures, ~ The High Pressure Jetting is canied out by suitable High Pressure Pumps. Soilmec tunneling igs have been specially {designed and adapted to complete this type ‘of work in the most efficient and effective way, where speed and precision are demanded. In addition, such a process allows easier and mote cost effective treatment of either soft sol or fractured and soft rock, Today, Soilmec can offer a wide range of equipment capable of covering radius of consolidations from 1880 mm to {6600 mm at 0°, thus applicable both in large ‘tunneling sections for High Speed Railways ‘and highways projects and in those tunnels thought for the city underground system, which consists normally of small sections. eee ey 5 Jet Grouting method Fi jc Za] a = ze au Grouted stee! pipe E: 8 Tunnelling Rig Main features: ~ Overall width: 2100 mm ~ Overall length: 2780 mm, ~ Front and rea fixed telescopic rams ~ Front and rear hydraulic slowing rings + Diesel engine and electc motorinterchangeable ~ Rotary head achioving a max, torque (1207 dam ~ Jet grouting optional by mast extension = Class of the machine: 12 on Performances = Max height of consolidation treatment a 0° 4570 mm 180in = Max height of consolidation treatment a$* 5157 mm, 208 in Radius of consolidation treatment a 0° (minvmax) 11880 /2550 mm 74-100n - Radius of consolidation treatment a 5*(minvmax) 2131/3137 mm 34/1240 Height from working level of slew ring rotation axis 11020 /2020 mm 401800 Hoist and feed system Feed stroke "7000/1250 mm 276/443 0 Max hoist force 52kN 11680 ot Max feed force 52kN 11690 tt Max speed (feed/noist) 25/7 rpm 25/7 1mm Rod diameter Diesel engine DEUTZTeD 2012 Lo4 DEUTZ TCD 2012 L04 Max power s2kW 123 HP Rated power askw 114HP Electric motor SIEMENS 4 POLS 50 Hz 380/660V SIEMENS 4 POLS 50 He 380/660 V ~ Power ‘OkW 121HP Hydraulic system Main pump (variable displacement axial pumps) 61 US gaimin ~ Auxlary pump (gear pumps) 4 single gear pumps Rotary = Max torque 8902 ott - Driling soeed 458 mm ‘Clamp and hydraulic joint breaker Size 60-225 mm 2-8in = Max clamping force 159kN 35744 bt ~ Max breaking torque 3890 daNm 28248 byt Undercarriage Track shoe wieth 350 mm tin = Overall lenght 2544 mm 10010 = Overall wien 2400 mm 830 “Traveling speed 24Kmih 15 mph Weight Total weight 122509 27008 Average pressure on ground 0.09 MPa apsi Seilmec integrates high quality level components: Gearmatic, Hydromatic, Lohmann, Roth: sede, Trasmital, Zoller. ST-15 Technical Data teeta | Chet E: ey Tunnelling Rig Main features: ‘The folowing cling techniques can be applied using the ST-20: ~ Rotation (wth or without casing) ~ Rotopercussion by means of Top Hammer (wth or without casing) = Rotopercussion by means of Down the Hole Hammer (with Tubex, Ode or Simmetric superjows system) Performances = Max helght of consolidation treatment a 0° 6200 mm 24 in = Max height of consolidation treatment a 5° 6470 mm 255 in ~ Radius of consolidation treatment a 0° (mirvmax) 11700 / 4686 mm 87/185 in Radius of consolidation treatment a S*(minvmax) 2100 / 4960 mm 23/198 in Height from working level of slew ring rotation axis 11500 mm 590 Hoist and feed system = Feed stroke 14200 / 16000 mm 559/630in Max holst force TKN 15062 to Max feed force TKN 15062 lot Max speed (‘eed/noist) 32-91pm, 32/91pm =Rod diameter Diesel engine DEUTZ 2013 Lo4 2 DEUIZ TCD 2012 L04 = Max power 9kW 173 HP Rated power 116 kW 185 HP Electric mot =Power ‘oKW 121 HP Hydraulic system Main pump (variable displacement axial pumps) 160/min 40US gainin ~Auxlary pump (gear pumps) ear pumps __3 single and trile gear pumps Rotary ~Max torque 1350 dati 9957 ibe, + Dring speed 460 mm +460 rm ‘Clamp and hydraulic joint breaker -Size 60-260 mm 2-10i0 =Max clamping force 159KN 35744 bt ~ Max breaking torque 3890 daNm 28248 oft Undercarriage Track shoe wieth 350 mm 14in ~ Overall lenght 2544 mm 10010 = Overall width 2100 mm 83 in Traveling speed 24 Km 18 mph Weight Total weight 21000 kg 4829710 = Average pressure on ground 0,09 Mi 13psi Soilmec integrates high quality level components: Gearmatic, Hydromatic, Lohmann, Rothe erde, Trasmital, Zoller. ST-20 Technical Data Tunnelling Rig Main features: ‘The folowing cling techniques can be applied using the S60: ~ Rotation (wth or without casing) ~ Rotopercussion by means of Top Harmer (wth or without casing) = Rotopercussion by means of Down the Hole Hammer (with Tubex, Odex or Simmetric superjows system) Performances Max height of consolidation treatment a 0° 10700 mm ain Max height of consolidation treatment a §* 10700 mm atin Radius of consolidation treatment a 0° (invmax) 3675 / 6475 mm. 145 (2550 ~ Radius of consolidation treatment a 5" (minvmax) 9675/7147 mm 145 (281 in - Height from working level of slew ring rotation axis 1850/4262 mm 33/168 in Hoist and feed system Feed stroke +9000 me 748 in = Max hoist force TOKN 15736 lot = Max feed force TOKN 15736 tt Max speed (feed/noist) 26mm 261m Rod diameter Diesel engine DEUTZ TeD 2012 Los DEUTZ TOD 2012 106 Max power 155 kW 208 HP + Rated power 135 kW 181HP Electric motor SIEMENS 4 POLS 50 Hz 380V SIEMENS 4 POLS 50 He 380 = Power 10 KW 147 HP Hydraulic system Main pump (variable displacement axial pumps) 250\/min 5S gamin - Auxliary pump (gear pumps) 2single and double gear pumps 2 single and 1 double gear purnps Rotary = Max torque 1747 dam 12885 torn Driting speed 295 rpm 296 rpm ‘Clamp and hydraulic joint breaker Size 60-250 mm. 2-10in = Max clamping force 159kN 35744 bt ~ Max breaking torque 3890 daNm 28248 byt Undercariage Track shoe wicth 600 mm rain - Overall lenght 4510 mm tition = Overall width 3500 men 1380 “Traveling speed 1.5 Kmih 09mph Weight Total weight 62000 kg 19668510 ~ Average pressure on ground 0,172 MPa i7psi * optional kt 2400 mm / 845 in Sollmec integrates high quality level components: Gearmatic, Hydromatic, Lohmann, Rothe erde, Trasmital, Zoller. Ba Technical Data Bar) Tunnelling Rig Main features: “The folowing cling techniques can be applied using the ST-120: ~ Rotation (wth or without casing) ~ Rotopercussion by means of Top Harmer (wth or without casing) = Rotopercussion by means of Down the Hole Hammer (th Tubex system or without easing) Performances = Max helght of consolidation treatment a 0° 10120 mm, 398 in = Max height of consolidation treatment a 5° 10736 mm 4230 - Radius of consolidation treatment a 0° (mirvmax) 3600 / 6600 mm 142 (2600 Radius of consolidation treatment a S*(minvmax) 5266 /7216 mm. 2071286 in Height from working level of slew ring rotation axis 1000 / 3500 mm 39/138 n Hoist and feed system = Feed stroke 16000 / 18000 / 21000 mm 1630 709 /827 in Max holst force BAKN 18884 tr Max feed force BAkN 18888 ot ~Max speed (‘eed/noist) 30/5 1pm 30/5 1pm =Rod diameter Diesel engine ‘Cummins 6 CTAA 83 Cummins 6 CTAA 8.3 = Max power ‘164 kw 220HP Rated power 135kW 181 HP Electric mot SIEMENS 4 POLS 50 Hz SIEMENS 4 POLS 50 He =Power ‘OKW 121 HP Hydraulic system Main pump (variable displacement axial pumps) (214214142 /2x(1584158)421158 Vin §7457)99/ 2040142120 US gan ~Auxliary pump (gear pumps) 1 singie and 2 double gear pumps Rotary ~Max torque 1363 dati 10088 lb + Dring speed 487 pm 457 pm ‘Clamp and hydraulic joint breaker -Size 60-260 mm 2-10i0 =Max clamping force 159KN 35744 bt ~ Max breaking torque 3890 daNm 28248 oft Undercarriage Track shoe wieth 00 mm atin ~ Overall lenght 5041 mm 1980 = Overall width 3800 mm 1540 Traveling speed 14 Kin 0.8mph Weight Total weight 120000 kg 264550 fo = Average pressure on ground 097 Mi 25 ps) Sollmec integrates high quality level components: Gearmatic, Hydromatic, Lohmann, Rothe erde, Trasmital, Zoller. Bary Technical Data Bar Tunnelling Rig Tilting configurations i Fi 7 pe Et se == Capp Sade J : E mE ‘ E Bice Transport Data Working radius i 3 eC eh eet tnd panies and dealers. www.soilmec.it

You might also like