Tunnel ses
Consolidation | $t2°
Rigs ‘ST-120
(
Consolidation Rigs
IMmec@Nowadays, the increasing need and demand
of transferring a series of infrastru
the underground has brought about an
impressive rise in the numbers of tunnel:
onstructed, regardless of t
oil to be penetrated
of tunnels in|
presence of unstable formations or in
ls prone to landstie, requ
f preventive consolidation of the
arch and, f needed, of the walls and invert
before the final lining is completed.
sping of t =
able to tackle any kind of
The final aim is to each the tunnel stability
i
pensive temporary
foup has designed and
applied a tunnel consolidation
technology known as RPUM (Reinforced
Protective Umbrella System). The method
finds its way in those tunnels with an
Unstable or short term stable core face
condition. The technology envisages in the
installation of a series of sub-hori
ments aiming at consolidating th
beyond the face ofthe tunnel before can
cut safely and speedily the excavation under
the protection of the arch - like a shell - by
using specially designed foro
Ince such an operation is.
cuite popular one especially in Europe, the
tunnel is excavated usually in two stages
jop heading and bench) or full ‘ace opening,
under the protection provided by the
consolidation and by instaling a temporary
fining teers and sho!
th excavation step
Fs shorter than the length of the
ve umbrella forepoling, so as to allow
‘an overlapping with the following series of
ing. AS might be understood, the
‘entioned operations require pretty
In order to avoid interruptions and delays
in the working cycle, the operations must
be performed to an extremely exact time
yhedule, That means the consolidation
inthe shortest
possible time and at a constant rate
‘The technological development has therefore
pursued two major ways:
= The study and design
equipment able
confined t up in
the required driling position and finally
able to execute longer and longer sub-
zontal
of the right
soiation in one singleRPUM method
thus dramatically reducing the cycle time. to reduce the number of supporting ribs
= Design of the most suitable consolidation _to be installed.
grout treatment for stabilizing the
‘excavation and featured by mechanical
strength to allow for the excavation and
121 HP T2aew 181 HP 176 (2x90) 286+(2e121) Hh
1122 aN i 1650 daNm_ S857 6 1550 dali
18802550 mm
12500 kg 119000 kgCONSOLIDATION RIGS
R.P.U.M, method
‘The RPUM method includes execution
phases involving the installation of, either
suitable reinforcing steel pipes, or of
consolidated columns using the JET
GROUTING system, reinforced by a steel
Pipe.
Using reinforcing pipes. the method
consists in the installation of manchette-
type steel pipes acting as reinforcement
support for the next instalation of the stee!
ribs. At the same time, they are also used
{as grouting pipes thus forming a continuous
canopy of consolidated soil
1. DRILLING PHASE: The ctiling can be
performed either by rotation or
rotopercussion (TUBEX-ODEX-Ike).
In the frst case, the dling sting sel, ted
with a crag bit at its end, is left in place,
hile using the rote-percussion, isthe casing
that has to be left in place.
In both cases, the dling string or the casing,
acting as reinforcing steel of the
consolidation treatment, are fitted with
special non-return valves , which are built
Within the wall thickness of the steel pipes
and are such as not to sutfer damages
during the penetration ofthe soil
2. GROUTING PHASE: basically there are
two possible grouting techniques:
‘The single valve injection technique, using
2 double packer placed across to each
valve securing each individual valve is
pressurization.
b. The one shot technique for each
individual fore pile by using @ packer
placed at the top of the pipe,‘The use of JET GROUTING reinforced
‘columns is also widely employed today
thanks to its suitability in a variaty of sols
ranging from gravel to clay, but especialy
in very ficult conditions, where both weak
solls and thin overburden are found. In fine
sols, the column has a static function, while
where there is water inflow it works as a
barier against the water.
‘The execution phases of the so called Trevi
Reinforced Jet Grouting in Progress (normally
TT single fluid is suggested) can be
described as follows.
~ The treatment is performed by driving
both the rod and the casing
simultaneously and performing the jetting
during the penetration phase. The space
between the rods and the pipe allows the
Jetting spoil to escape. On completion of
the driling/treatment, the jetting sting is
extracted from the casing which remains
inplace, acting as reinforcement.
= This type of consolidation obviously
requires a rig fitted with double head.
= Diiling is carried out by using a rod string
fitted with a monitor and a driling tool,
either by rotation or roto-percussion.
= During the driting phase, the inside fuid
‘escapes from the too tip, easing therefore
the soil penetration and xeeping the griling
to0l blades clean,
= When the diiling is over, the jat is diverted
by closing the bottom valve and the grout
‘escapes at high speed through the side
nozzles, disaggregating and mixing the
soil withthe grout and thus creating the
consolidated column, During this phase
the driling string is rotated and withdrawn
at a pre-set rate.
= The peculiarity of this system is that the
reinforcing stee! pipe is installed during
the jet grouting column execution. The
jetting string and the casing rotate in
‘opposite senses.
~ The jetting ro itself, fitted withthe monitor,
is located inside the string with the jet
grouting monitor over-passing the
reinforcement pipe mouth of 20 cm
approximately
= The grouts used are generally binary.
Coment/Water following a ratio of 0.8 to
1 and 1.3 with, in case, of use of
admixtures,
~ The High Pressure Jetting is canied out
by suitable High Pressure Pumps.
Soilmec tunneling igs have been specially
{designed and adapted to complete this type
‘of work in the most efficient and effective
way, where speed and precision are
demanded. In addition, such a process
allows easier and mote cost effective
treatment of either soft sol or fractured and
soft rock, Today, Soilmec can offer a wide
range of equipment capable of covering
radius of consolidations from 1880 mm to
{6600 mm at 0°, thus applicable both in large
‘tunneling sections for High Speed Railways
‘and highways projects and in those tunnels
thought for the city underground system,
which consists normally of small sections.
eee
ey
5
Jet Grouting method
Fi jc Za]
a = ze au
Grouted stee! pipeE:
8
Tunnelling Rig
Main features:
~ Overall width: 2100 mm
~ Overall length: 2780 mm,
~ Front and rea fixed telescopic rams
~ Front and rear hydraulic slowing rings
+ Diesel engine and electc motorinterchangeable
~ Rotary head achioving a max, torque
(1207 dam
~ Jet grouting optional by mast extension
= Class of the machine: 12 on
Performances
= Max height of consolidation treatment a 0° 4570 mm 180in
= Max height of consolidation treatment a$* 5157 mm, 208 in
Radius of consolidation treatment a 0° (minvmax) 11880 /2550 mm 74-100n
- Radius of consolidation treatment a 5*(minvmax) 2131/3137 mm 34/1240
Height from working level of slew ring rotation axis 11020 /2020 mm 401800
Hoist and feed system
Feed stroke "7000/1250 mm 276/443 0
Max hoist force 52kN 11680 ot
Max feed force 52kN 11690 tt
Max speed (feed/noist) 25/7 rpm 25/7 1mm
Rod diameter
Diesel engine DEUTZTeD 2012 Lo4 DEUTZ TCD 2012 L04
Max power s2kW 123 HP
Rated power askw 114HP
Electric motor SIEMENS 4 POLS 50 Hz 380/660V SIEMENS 4 POLS 50 He 380/660 V
~ Power ‘OkW 121HP
Hydraulic system
Main pump (variable displacement axial pumps) 61 US gaimin
~ Auxlary pump (gear pumps) 4 single gear pumps
Rotary
= Max torque 8902 ott
- Driling soeed 458 mm
‘Clamp and hydraulic joint breaker
Size 60-225 mm 2-8in
= Max clamping force 159kN 35744 bt
~ Max breaking torque 3890 daNm 28248 byt
Undercarriage
Track shoe wieth 350 mm tin
= Overall lenght 2544 mm 10010
= Overall wien 2400 mm 830
“Traveling speed 24Kmih 15 mph
Weight
Total weight 122509 27008
Average pressure on ground 0.09 MPa apsi
Seilmec integrates high quality level components: Gearmatic, Hydromatic, Lohmann, Roth:
sede, Trasmital, Zoller.ST-15
Technical Data
teeta | ChetE:
ey
Tunnelling Rig
Main features:
‘The folowing cling techniques can be applied
using the ST-20:
~ Rotation (wth or without casing)
~ Rotopercussion by means of Top Hammer
(wth or without casing)
= Rotopercussion by means of Down the Hole
Hammer (with Tubex, Ode or Simmetric
superjows system)
Performances
= Max helght of consolidation treatment a 0° 6200 mm 24 in
= Max height of consolidation treatment a 5° 6470 mm 255 in
~ Radius of consolidation treatment a 0° (mirvmax) 11700 / 4686 mm 87/185 in
Radius of consolidation treatment a S*(minvmax) 2100 / 4960 mm 23/198 in
Height from working level of slew ring rotation axis 11500 mm 590
Hoist and feed system
= Feed stroke 14200 / 16000 mm 559/630in
Max holst force TKN 15062 to
Max feed force TKN 15062 lot
Max speed (‘eed/noist) 32-91pm, 32/91pm
=Rod diameter
Diesel engine DEUTZ 2013 Lo4 2 DEUIZ TCD 2012 L04
= Max power 9kW 173 HP
Rated power 116 kW 185 HP
Electric mot
=Power ‘oKW 121 HP
Hydraulic system
Main pump (variable displacement axial pumps) 160/min 40US gainin
~Auxlary pump (gear pumps) ear pumps __3 single and trile gear pumps
Rotary
~Max torque 1350 dati 9957 ibe,
+ Dring speed 460 mm +460 rm
‘Clamp and hydraulic joint breaker
-Size 60-260 mm 2-10i0
=Max clamping force 159KN 35744 bt
~ Max breaking torque 3890 daNm 28248 oft
Undercarriage
Track shoe wieth 350 mm 14in
~ Overall lenght 2544 mm 10010
= Overall width 2100 mm 83 in
Traveling speed 24 Km 18 mph
Weight
Total weight 21000 kg 4829710
= Average pressure on ground 0,09 Mi 13psi
Soilmec integrates high quality level components: Gearmatic, Hydromatic, Lohmann, Rothe erde, Trasmital, Zoller.ST-20
Technical DataTunnelling Rig
Main features:
‘The folowing cling techniques can be applied
using the S60:
~ Rotation (wth or without casing)
~ Rotopercussion by means of Top Harmer
(wth or without casing)
= Rotopercussion by means of Down the Hole
Hammer (with Tubex, Odex or Simmetric
superjows system)
Performances
Max height of consolidation treatment a 0° 10700 mm ain
Max height of consolidation treatment a §* 10700 mm atin
Radius of consolidation treatment a 0° (invmax) 3675 / 6475 mm. 145 (2550
~ Radius of consolidation treatment a 5" (minvmax) 9675/7147 mm 145 (281 in
- Height from working level of slew ring rotation axis 1850/4262 mm 33/168 in
Hoist and feed system
Feed stroke +9000 me 748 in
= Max hoist force TOKN 15736 lot
= Max feed force TOKN 15736 tt
Max speed (feed/noist) 26mm 261m
Rod diameter
Diesel engine DEUTZ TeD 2012 Los DEUTZ TOD 2012 106
Max power 155 kW 208 HP
+ Rated power 135 kW 181HP
Electric motor SIEMENS 4 POLS 50 Hz 380V SIEMENS 4 POLS 50 He 380
= Power 10 KW 147 HP
Hydraulic system
Main pump (variable displacement axial pumps) 250\/min 5S gamin
- Auxliary pump (gear pumps) 2single and double gear pumps 2 single and 1 double gear purnps
Rotary
= Max torque 1747 dam 12885 torn
Driting speed 295 rpm 296 rpm
‘Clamp and hydraulic joint breaker
Size 60-250 mm. 2-10in
= Max clamping force 159kN 35744 bt
~ Max breaking torque 3890 daNm 28248 byt
Undercariage
Track shoe wicth 600 mm rain
- Overall lenght 4510 mm tition
= Overall width 3500 men 1380
“Traveling speed 1.5 Kmih 09mph
Weight
Total weight 62000 kg 19668510
~ Average pressure on ground 0,172 MPa i7psi
* optional kt 2400 mm / 845 in
Sollmec integrates high quality level components: Gearmatic, Hydromatic, Lohmann, Rothe erde, Trasmital, Zoller.Ba
Technical DataBar)
Tunnelling Rig
Main features:
“The folowing cling techniques can be applied
using the ST-120:
~ Rotation (wth or without casing)
~ Rotopercussion by means of Top Harmer
(wth or without casing)
= Rotopercussion by means of Down the Hole
Hammer (th Tubex system or without easing)
Performances
= Max helght of consolidation treatment a 0° 10120 mm, 398 in
= Max height of consolidation treatment a 5° 10736 mm 4230
- Radius of consolidation treatment a 0° (mirvmax) 3600 / 6600 mm 142 (2600
Radius of consolidation treatment a S*(minvmax) 5266 /7216 mm. 2071286 in
Height from working level of slew ring rotation axis 1000 / 3500 mm 39/138 n
Hoist and feed system
= Feed stroke 16000 / 18000 / 21000 mm 1630 709 /827 in
Max holst force BAKN 18884 tr
Max feed force BAkN 18888 ot
~Max speed (‘eed/noist) 30/5 1pm 30/5 1pm
=Rod diameter
Diesel engine ‘Cummins 6 CTAA 83 Cummins 6 CTAA 8.3
= Max power ‘164 kw 220HP
Rated power 135kW 181 HP
Electric mot SIEMENS 4 POLS 50 Hz SIEMENS 4 POLS 50 He
=Power ‘OKW 121 HP
Hydraulic system
Main pump (variable displacement axial pumps) (214214142 /2x(1584158)421158 Vin §7457)99/ 2040142120 US gan
~Auxliary pump (gear pumps) 1 singie and 2 double gear pumps
Rotary
~Max torque 1363 dati 10088 lb
+ Dring speed 487 pm 457 pm
‘Clamp and hydraulic joint breaker
-Size 60-260 mm 2-10i0
=Max clamping force 159KN 35744 bt
~ Max breaking torque 3890 daNm 28248 oft
Undercarriage
Track shoe wieth 00 mm atin
~ Overall lenght 5041 mm 1980
= Overall width 3800 mm 1540
Traveling speed 14 Kin 0.8mph
Weight
Total weight 120000 kg 264550 fo
= Average pressure on ground 097 Mi 25 ps)
Sollmec integrates high quality level components: Gearmatic, Hydromatic, Lohmann, Rothe erde, Trasmital, Zoller.Bary
Technical DataBar
Tunnelling Rig
Tilting configurations
i Fi
7 pe Et se == Capp Sade
J : E
mE ‘
EBice
Transport Data
Working radiusi
3
eC eh eet tnd
panies and dealers.
www.soilmec.it