O O
N
PLANIMETRY
m
Ro o
Pond
N N
SCALE
ALONG THE ALIGNMENT 1 : 2500
ACROSS THE ALIGNMENT 1 : 2500
Un
Mainly Paddy Field
lin
ed
m
Roo
Un
TP TABLE Roo
m
Ch
line
440 v Power Line 11Kv Power Line
ann
d
TP NO EASTING NORTHING Nala Height 5.158 Mt Height 5.658 Mt
el
11Kv Power Line Tube Well
Ch
IP36/1 - P137 IP 36/2 - P138 IP 36/3 - P139 IP 36/4 - P140 IP 36/5 - P141 IP 36/6 - P142
an
1231352.741 Height 5.845 Mt
TP 36 366596.229 IP 35/2 - P135 Ch:19817.68m Ch:20038.49m Ch:20139.78m Ch:20314.19m Ch:20423.51m Ch:20688.36m
ne
l
Ch:19374.32m BH80 BH82 BH83 BH84
M TP 37 366076.918 1230098.691 BH79
BH81 M
ell CS - 054
e W CS - 052 CS - 053
Un
CS - 051 IP37 - P143 BH85
Un
IP36 - P136 Tub House m
11Kv Power Line
line
p Roo 11Kv Power Line
line
CS - 050 Ch:19575.38m Pum Height 5.841 Mt Ch:20932.70m
d
Pond Height 5.775 Mt
d
CS - 049 IP35/1 - P134
Pa
Ch
Ch
thw
an
Ch:19268.16m
an
MDNM/CPF/PL/6072/ALI (SH.11 OF 17)
ld
ne
Mainly Paddy Fie
ne
y
L L
GROUND PROFILE
J SCALE: J
HORIZONTAL 1 : 2500
VERTICAL 1 : 250
GROUND LEVELS
3.907
3.661
3.573
3.752
4.979
4.142
3.928
3.901
4.932
3.671
4.726
3.842
3.682
3.694
3.743
3.777
3.801
3.827
3.790
3.773
3.722
3.651
3.712
3.689
3.789
3.725
4.416
4.447
4.492
4.713
4.254
4.215
3.604
4.268
3.975
3.871
3.747
3.719
3.739
3.730
3.642
3.597
3.552
3.553
3.691
3.846
4.126
3.129
4.286
3.556
3.568
3.566
3.570
3.657
3.645
3.601
3.550
3.556
3.561
3.564
3.567
3.599
4.160
3.356
3.650
3.512
3.501
3.486
3.571
3.567
3.561
3.659
3.635
3.612
3.726
3.402
3.667
3.628
3.612
3.606
3.594
3.631
3.543
3.601
4.492
3.921
3.716
3.528
3.716
(IN METERS)
20+040
28+660
12.360
48.230
11.090
33.940
31.230
27.490
27.140
31.620
23.930
30.330
29.320
28.390
30.500
30.080
28.740
29.770
31.420
27.680
16.550
12.640
16.430
28.080
28.340
25.860
28.450
23.000
15.530
31.530
27.990
11.230
16.170
32.830
24.060
28.640
27.580
19.290
15.170
26.840
25.940
30.930
27.270
27.560
29.940
25.830
26.780
17.270
23.710
23.880
31.680
16.670
26.920
31.480
29.560
29.010
28.360
28.100
31.700
27.040
24.320
15.940
18+690
DISTANCE BETWEEN LEVEL
7.960
4.940
9.390
9.680
7.590
7.570
9.430
1.280
8.480
6.510
6.800
1.160
5.080
1.330
7.100
1.130
5.820
1.940
3.540
3.690
6.050
7.690
5.800
0.000
19+316.39
19+327.48
19+361.42
19+365.04
19+369.38
19+374.32
19+405.55
19+433.04
19+460.18
19+491.80
19+515.73
19+546.06
19+575.38
19+613.16
19+643.66
19+673.74
19+702.48
19+732.25
19+763.67
19+791.35
19+807.90
19+817.58
19+825.17
19+832.74
19+842.17
19+847.69
19+853.65
19+860.16
19+872.80
19+917.31
19+945.65
19+971.51
19+999.96
20+022.96
20+038.49
20+070.02
20+098.01
20+104.81
20+116.04
20+132.21
20+133.37
20+138.45
20+139.78
20+172.61
20+196.67
20+225.31
20+252.89
20+287.35
20+314.19
20+342.85
20+361.54
20+381.58
20+388.68
20+414.62
20+418.57
20+423.51
20+454.44
20+481.71
20+509.27
20+539.21
20+565.04
20+591.82
20+609.09
20+632.80
20+656.68
20+688.36
20+692.58
20+696.27
20+697.16
20+713.83
20+719.88
20+727.57
20+754.49
20+815.53
20+844.54
20+872.90
20+932.70
20+959.74
21+000.00
CUMULATIVE CHAINAGE
(KM METERS)
(000 + 000)
19.25Km 19.50Km 19.75Km 20.00Km 20.25Km 20.50Km 20+75Km 21.00Km
CS - 055
CS - 055
CS - 055
CS - 055
CS - 055
CROSSINGS P P P P P P
E E
D D
(CH.1000)
(CH.1750)
(CH.1250)
BH NO 1
BH NO 2
BH NO 3
BH NO 4
BH NO 5
BH NO 6
BH NO 7
BH NO 8
(CH.1520)
(CH.500)
(CH.250)
1.0
(CH.750)
(CH.5)
3.0
TOPOGRAPHIC SYMBOLS PIPELINE SYMBOLS SOIL SYMBOLS NOTES : BILL OF MATERIAL FOR THIS DRAWING REFERENCE DRAWINGS PROJECT TITLE:
TREE
PROPOSED
PROPOSED PIPELINE
PIPELINE
BRIDGE / CULVERT
UNCASED CROSSING
CLAY HIGH PLASTICITY 1. ALL dimentions are in metres unless mentioned. DRAWING TITLE DRAWIMG. NO.
MADANAM CPF & PIPELINES PROJECT
EXISTING PIPELINE CASED CROSSING
SLITY CLAY 2. For crossing details refer specific Crossing drawing. (CAUVERY ASSET)
TURNING POINT (TP) POWER LINE ROUTE MAP SCALE (1.50000) MDNM/6072/05/28/M/1024 (SH. 01 OF 01)
C CONTINUOUS CONCRETE 3. All levels are with respect to M.S.L. C
ROAD TELEPHONE LINE
WEIGHTING
GRAVEL - SAND -CLAY MIX (GC) NALA CROSS SECTION MDNM/6072/05/28/M/1023 (SH. 49 OF 84) CLIENT:
HIGH TENTION LINE
4.The coordinates indicated at GPS satation are in UTM.
RCC ROAD NALA CROSS SECTION
RAILWAY OFC LINE
CONCRETE BLOCKS
GRAVEL - SAND - SILT MIX (GM)
5. KM markers shall be installed at every one Km interval and UNLINED CHANNEL CROSS SECTION
MDNM/6072/05/28/M/1023 (SH. 50 OF 84)
MDNM/6072/05/28/M/1023 (SH. 51 OF 84)
OIL AND NATURAL GAS CORPORATION LTD.
CART TRACK FENCE ZINC GROUNDING CELL GRAVEL - SAND MIX (GP)
other markers shall be installed as per Technical Spec.no. UNLINED CHANNEL CROSS SECTION MDNM/6072/05/28/M/1023 (SH. 52 OF 84) ONSHORE ENGG. SERVICES, DELHI
DIVIDER INTERMEDIATE SCRAPER LATERITE (LA) MEC/S/05/21/10 and standard drawings.
SIGNAL POST UNLINED CHANNEL CROSS SECTION MDNM/6072/05/28/M/1023 (SH. 53 OF 84)
STATION CLAYEY SILT (MI)
NALA / STREAM / CATHODIC PROTECTION TEST 6. Pipline warning signs shall be installed as given blow or UNLINED CHANNEL CROSS SECTION MDNM/6072/05/28/M/1023 (SH. 54 OF 84) CONTRACTOR:
STATION SECTIONALISING VALVES as per instruction of EIC.
CANAL / RIVER PEBBLES (PC)
B POND POTENTIAL GRADIENT INSULATION JOINT
SAND - CLAY MIX (SC)
NH/SH - 2 Nos PROJECTS LIMITED B
KM STONE CONTROL MAT (PGCM) Rly xing - 2 Nos
SCRAPER TRAP MUMBAI
TRANSFORMER RECTIFIER SAND SILT MIX (SM)
FURLANG STONE Major water xing - 2 Nos
K K.M MARKER
ROW LIMIT SAND (SP)
AC INTEFERANCE MITIGATION For other details refer tecnical Spec. no. SECTION
TEMPLE Zn RIBBON PARALLEL TO PIPE
W PIPELINE WARNING SIGN CLAYEY SILT LOW PL (ML) MEC/S/05/21/10 for Pipeline Markers. LOCATION
GATE - COPOUND WALL ANODE GROUND BED
WEATHERED ROCK (WR) DESIGNED
BUILDING
7. For casing detail, refer relevant document/drawing enclosed elsewhere ALIGNMENT SHEET
EXISTING CABLE / A AERIAL MARKER DRAWN
WELL PIPELINE CROSSING REFUSAL in tender document.
A
HAND PUMP NAVIGABLE WATERWAY
CHECKED 19.25km to 21.00 km A
HOT BEND (R = 6 D) N (WT) WATER TABLE 8. For other required material , refer relevant Plot Plan , Piping GAD etc. AND
LAMP POST PIPELINE WARNING SIGN VERIFIED
CS CONDUIT FOR OFC 9. Hot bends shall be decided at site after pre - construcion survey. APPROVED SCALE : NTS SHEET REV
MAN HOLE D D DIRECTION MARKER
OFC PULLING PIT
WATER KUNDI DATE DRG.NO. MDNM/CPF/PL/6072/ALI/012 12 OF 17 0