You are on page 1of 1

STORAGE TERMINAL

DEVELOPMENT PLAN(PHASE 2)

TANK BANDING INSPECTION REPORT

QCF No.: Job No. Sub Project Unit Type of Doc Discipline Serial No. Date Attachment FIN No. Rev

Work Location: ITP ITEM: DWG.No.:

Banding Banding
Shell Joint No. Shell Joint No.
Measured Measured
Check Point No Check Point No
Value(mm) Value(mm)
A A
B B
C C
A A
B B
C C
A A
B B
C C
A A
B B
C C
A A
B B
C C

Note: Deviation(banding) at horzizontal weld joint shall not exceed 13mm . Banding at horizontal weld joints shall determiend
using a streisht edge vertical sweap board 900mm long.(API STANDARD 650 , MARCH2020)

SUB CONTRACTOR (SFP) CONTRACTOR(ABAD RAHAN PARS)


NAME : NAME :

SIGN : SIGN :

DATE : DATE :

A238-TK-006-REV:01