You are on page 1of 7

Exception list container pick up ETD-7 (Jakarta Sale

No Account

1 TMMIN
2 EDS
3 NGK
4 ADM
5 Tsusho
6 Suzuki
7 Yanmar
8 Honda Prospect Motor & Honda Trading Indonesia
9 Honda Precision Part Manufacturing
10 Hankook Tire Indonesia

11 Kintetsu World Express (NAC : ADM / AHM)

12 Yusen Logistics

13 Epson

14 Yamaha Music (YMMA / YMMI / YE)

15 Naditama Trancy (NAC : Sumitomo Wiring System)

16 Konoike (NAC : Hogy)

17 PANTOS LOGISTICS
18 Sejahtera transindo lestari / Sejahtera Trasn Logistik
19 KALIMANGGIS Trans Logistik
20 TUNAS SAMUDRA
21 KARYA PRIMA
22 CES CARGO
23 Pratama Cargo
24 KASE INTERNATIONAL
25 Transindo Tirta Amerta/TAJ Logistics Indonesia
26 Buana Indo Kencana
27 AGC
28 Yamaha Motor (YIMM/YMPI/Hamatetsu/Meiwa
er pick up ETD-7 (Jakarta Sales Team)
RFA POD

Various
JP / TH
Various
Various
Various
Various
JP
TYOB02597A Various
TYOB02597A Various
SELB00004A Various

variety

variety

variety

variety

variety

variety

SELB03575A Various
JKTN00144A Varios
TJKTN00092A Various
JKTN00800A Various
JKTN00799A Various
JKTN00091A Various
JKTN00056A Various
JKTN00612A Various
TJKTN00151A; JKTN01198A; JKTN00825A; JKTN00206A Various
JKTN00016A & TJKTN00140A Various
variety
SMZB00020A;SAOB01775A;SAOB000626A Various
Pick up plan proposal F/T DTOC (days) -
as per agreement
D-15 from ETD 21
D-10 from ETD 14
D-10 from ETD 5
D-10 from ETD 21
D-8 from ETD 5
D-10 from ETD 21
D-8 from ETD 5
D-8
D-30from
fromETD
ETD (MXCLY) 28
28
D-15
D-17 from
from ETD
ETD (others destination) 14

10 days before ETD (5 days before CY open) Tariff

D-15 days from ETD (5 days before CY open) 14 Calendar days

10 days before ETD (5 days before CY open) Tariff

10 days before ETD (5 days before CY open) Tariff

10 days before ETD (5 days before CY open) Tariff

10 days before ETD (5 days before CY open) Tariff

D-14 from ETD 21


D-10 from ETD 5
D-10 from ETD 5
D-10 from ETD 5
D-10 from ETD 5
D-10 from ETD 5
D-9from ETD 5
D-9 from ETD 5
D-10 from ETD 5
D-10 from ETD 5
14 days before ETD (9 days before CY open) 14 Calendar days
D-10 from ETD 14
Reason
Toyota vanning schedule is on commodity type basis, therefore vanning on open CY date will not be
workable on them. To limit FT utilization, we have negotiated with TMMIN to accept empty pick up 5
EDS
days/before
Same Yazaki
with EDS, need
CY openadvance
most of theequipment
automotiveavailability due to small warehouse
industry manufacturers area;
tend to have failed
little to do vanning
to none
might result in lane stop due to insufficient holding area
warehouse / holding area due to effeciency and maximizing production area. Therefore, most common
practice
production is tostyle
vanning right
is same after
with end ofTheir
TMMIN. production line. In
production this
line case, equipment
is divided is needed
by commodity type,to support
therefore,
with overall
vanning production process -- distribution. Container size involved is mostly D4 i/o D5.
TTI needschdule
3 days priorneedopen
to start
CY at
to earlier date.process, especially for Lexus/Toyota cargo as special
do vanning
Suzuki
handling have special upon
is needed arrangement
vanning at Depo for their container pick up at Puninar Depo. To support with
process
SIM special PEB process while still in line with ONE direction upon container shortage situation, they
actually
will
Container their
not utilize
sizeshipment
21 days FT,
involved PORbutIDCK
is only D2 and
will different
secure
for this date of
containers
biz.request CY CDP
approx D-5and CYprior
- D-7 Terminal. special F/T just in case
gate in.
HPM
Due :isWe
thereto have
warehouse
long negotiate
Holiday capacity
at POL,with
forHPM
Hankook
Mexicoto minimize
always
Destination FT utilization,
F/Thowever
14 dayand
(D-28) DTOC when
Thailand they still need
(140bidding,
days) and
, andtoavrage
pick uppick up
they
empty
maximixe at least
to D-3
manage before
their gate
F/T. in CY for stuffing
actual is D-7 Open CY due to to manage their stock at warehouse preparation. considering container numbers on the
particular week.
According to Hankook, they will have production line stop if the WH is full because all finish goods tire
will
HPPM be :directly stuffingfrom
For shipment to our
CDP,container.
they need at least 10 days prior to gate in CDP, as they need to drop
Hankook will partially pick up container
the container to temporary CY (PLB ~ Pusat D-14Logistik
from CY open date.
Berikat) before CDP CY open. Actual days from
Empty pick
Customer up until
needs to docontainer
the stuffingdropped at PLBthey
early because is 1-2 days.
have lots of cargoes to ONE.
We have try to negotiate with Hankook & ONE KR for this issue, however they still insist to have at
least 12 days prior to CY open date
Mostly due to Toyota's request

Their werehouse is full, so they need to pick up the container early and send it to the CY asap.

Their werehouse is full, so they need to pick up the container early and send it to the CY asap.

Early stuffing request from the Sumitomo Wiring System

Due to the strong demand, they need more time for stuffing by picking up the containers early
Pantos needs at least 10-14 days from empty pick-up in order to meet production plan, e.g. factory
produces certain parts on certain day. Production running usually 3 week before plan ETD and
warehouse capacity is limited thus they need boxes earlier than ETD-7. Currently we are in bdding
Due to volume
negotiation for is big need
FY2021, to restriction
tight pick up early
may jeopardize our chance to secure 2021 business.
Due to volume is big need to pick up early
Due to volume is big need to pick up early
Due to volume is big need to pick up early
Due to volume is big need to pick up early
Due to volume is big need to pick up early
Due to volume is big need to pick up early
Due to volume is big need to pick up early
Due to volume is big need to pick up early
They need to dry the containers before the stuffing and the big portion (100teu/week).
Their werehouse is full, so they need to pick up the container early and send it to the CY asap.
Exception list container pick up ETD-7
No Account RFA

1 UNILEVER BASB00246A
2 UNILEVER BASB00262A
3
4
5
6
7
8
9
10

11

12

13

14

15

16

17
18
19
20
21
22
23
24
25
26
27
28
POD Pick up plan proposal F/T DTOC (days) -
as per agreement
JEDDAH D-10 from ETD 10
YANGON, CALCUTA,
D-10 from ETD 18
SYDNEY
Reason
Main reason ETD-10 is basically due to big volume export shipment not just
under ONE and they will need to evacuate the cargo once it's ready due to
warehouse capability and this has been raised to their global and based on RFA :
BASB00246A, it's agreed
New RFA# validity for 10- 30/Jun/2023
1/Jul/2022 days F/T.

You might also like