You are on page 1of 27
#tsolis PV Grid Tie Inverter Solis 4G Single Phase Inverter Installation and Operation M: +26 054 65781808 Emalintotbanong.com 3 CE@ By @. error {© Ningbo Ginlong Technologies Co.,Ltd +. Ineoduetion : 3 1.4 Product Description 3 12 Packaging 4 2, Safety Instructions 5 2.4 Safety Symbols : 5 2.2 General Safely Intructons 5 23 Notice For Use 6 3. Overview 7 3:1 Front Pane Display 7 32 LED Sas neater Ligis 7 3.3 Keypad : 5 34LeD 8 4 Installation 3 41 Select Location for the Inverter mg 4.2 Mounting the inverter n 4.3 Electrical Connections 1a 43:1 Connect PY side of inverter oo 18 4.3.2 Connect grid side of invertor 6 4.3.3 xem ground connection 18 4.3.4 Max, overcurentprotecton device (OCPD) 19 4.35 Inverter monitoring connection 19 4.3.6 Electrical connection diagram 20 4.3.7 Meter Connection (optional) 20 4.3.8 CT connections (optional) at 4.2.9 Logicinterface connection (Only for UK) 22 5, Star & Stop 23 5.41 Startthe Inverter svnsnnnn 23 5.2 Stop tho Invertor 2B 6. Operation 24 6.1 Main Menu sn 24 62 Information smn 28 8.2.4 Look erean 2% 6.3 Setings 26 6.3.4 Set Time ernnnnnnennnn 26 6.3.2 SetAddress 2% 6.4 Advanced info. a 1. Introduction a ona sssge 7 4.5 Monthy Enorgy and Yea Energy meme 28 Steg nee Aare cat ode ier at el 6.4.7 Communication Data 29 Sonnac 351 Seat Snes 2 ——— 855 Guar Eney x 6.5.4 Reset Password an cael e8sPomercontol | wns 5 ‘coon 6.5.7 Special Settings 32 Aetme SsonMi Cpaete % catsDsP Urea fa 6.5.16 Power Parameter 37 a 7 wate 2 seme] seat | Lacon 86 Enable ~% se Ft sro Sse DEMOS, uum & 8. Specitcations 2 1. Introduction 2 Safety Instructions Safety Instructions 3. Overview ET A A A A A 3. Overview 4. Installation 4. Installation 4. Installation ee] 4. Installation 4. Installation 4. Installation 4. Installation Installation z= idee of inverter 99° [Renner Fach ol Sng Phas Inver sips win an AC gritemial cana 4 yt yetow watt ground tinal Finth reer brown) wet = ign apt capan a temina cei 4. Installation 4. Installation ee] 4. Installation 4. Installation ee] i el yh EE B 4. Installation 5. Start & Stop | Operation 6. Operation a = * 5 nto he ex om to rig rose ESChoy vere thestinge anette Operation 6 Operation ‘Seren cone sec manalyby peers UPIOOWN es. (averiguee JOWN ay omovetn case pres UP ey tocnange ne The seven sows th nore ectbe nvrer (ee Fave 8.14, whch wnce A Shomnseesemes 6. Operation 6. Operation 6. Operation 6. Operation Operation 6. Operation TDs: 2usiecnicad nn a8 4.3.7 Mater conection opera Lees] 6. Operation 6. Operation 6 Operation 7. Maintenance FarsotesPa 6)k40 8. Trouble Shooting 8. Trouble Shooting Specifications 9. Specifications Specifications 9. Specifications Specifications 9. Specifications Specifications 9. Specifications Specifications

You might also like