You are on page 1of 6
: Were [FF "se PERE MATERIALS RECEIVING INSPECTION-MRI MRI No, \GHBUD:CRCC-MREL-00004 (a1 Ste or approved offsite store) Rev. ° To: KEO International Consutants Dare: 16-Jan-2021 moe a | PROuEET mau [cove TaUETO eopeRnsON ve cuewronn pecnae Ses covrnacron Ccrieecewan isiano- | Untea dedopnen co. ‘hina Rainey Constcton BULAN WORKS PAGHAGE ‘u0e)| rest eter ret ‘Company MATERIAL DESCRIPTION PVE Conds and Accessonies QUANTITY Lot uNtr NA DATE OF DELIVERY 14-Jan-2021 SPECIFICATION REFERENCES ‘SUPPLIER & PLACE OF ORIGIN (Town & County) ‘Qatar National Plastic Factory! Qatar APPROVED MATERIAL TRANSMITTAL REF.NO, _GI-BLD-CRCC-MTS-EL-000011.R1 DELIVERY NOTE NO, we7020 CONTRACTOR CONSTRUCTION SCHEDULE ACTIVITY (CCS ID & Description LOCATION / SCOPE OF WORK SITE san covreacrons Sancti ees i eaey Contractor's QAIC Representative THE MATERIALS TO BE INSPECTED I READY AND ALL REQUIRED SELF INSPECTIONS ANO TESTS HAVE BEEN CARRIED OUT AS PER AGREED ‘QUALITY PLANS, METHOD STATEMENTS AND OTHER RELATED CONTRACT DOCUIMENTS, Thefotoving documents we ataced lca some Army Potten: ema tree baw: tear name = Aji sone: Aone’ Mate: noe ere Date (6-01-2024 REO Inapedion Remakes Mareas peer ae of pee ArPRoURy mareuat [bam iTar, CATRACTN 7 PROVIDE ProPEY Fecuney (SrrAcE) ] 4- Ne objection [Ai Pro crjecionsebjecttoincrpertion fat] ejects, tobe reomited “ee 0 Pret Leader — R/U es one: 1@)01]/ 04 Fre Rasaasae etait edcassnasniting enconaan tities nates eee ener eee cee ener rc em ae a ge ee neces ee eee wan ine Cont! oe 16 JAN 2 YN ep OER {© KEO national Consutants EM 16 JAN 2021 Tess (ATERIAL DELIVERED. 10. SITE INSPECTION. CHECK LIST ey aT ee Ne aa TTT enna per ieatioton vs appease at nt denver seg ted der ie eaten bor he spoons mace att ressedienceet reps sche ec mio gn conduan re ta aye ta ea mst wen a citings tri ‘heoeptoper peptone acog 0 YE Cechean etamig mtr ented sme ec meget huomeasen Aro Ay lowe (YJ of / 2024 cent rasan sla me (6 — | — 21 somspecer amen & eas lita) ihenagll sled pisos Qplast Qatar National Plastic Factory wut, tmt-woie NPE Date:14.01.2021 Ref: DN/67020 DELIVERY NOTE Customer Name Customer A/C No Customer LPO. No. PIONEER CONTRACTING & TRADING ggg PO-0001-GEWAN-2020 REV- co. or Contact person- Contact No. DO. Ref, Inv. No. 50980015 11216 LOCATION - LUSAIL Delivery Date Time: .. 14.01.2021 7 Description I; No.| Code Lae — Quantity | Material Size Color | Thickness Printing | 1 | asaaors | HIVE ELEC CONDUIT PPE 25:2. SN. Smm) B5H607/BSENGIBRE HO PLEWITE, | 5 -—3_| 10909 | upvc ELECTRICAL CONDUIT 25mm COUPLER, 8S 4607 WHITE, Qplast 7 ‘5000 PCS: Sect Instructions & Rei anal cons ‘ol. 8011558 (re eo13858 667: one v MTCis satached | Oe Issued By “MEER. i Received By pee FET Signature A Se Name AMC. MobileNo, C078 © Faw: 44689922 CANTY: Goss EtMMNWY © ports Asa b pibyg yd gine Qplast Qatar National Plastic Factory W.L.L. fst ifoseupan.com ebsites oe. qotertsom QNPF/Interna! Ret: PRIR /QC/JUNE/037 PRODUCT TEST REPORT PRODUCT DESCRIPTION UPVC HEAVY DUTY CONDUIT 25MM [covour WHITE RAL - 9016 z LENGTH 2.9 METER Soest REFERENCE STANDARD CS /8S 4607/EN 61386 aca | BATCH [Test Name STANDARD REQUIREMENT RESULTS | __REMARKS Dimensions ‘win: 25.00 0M 25.00 Passed Outside diameter(00) Wall thickness © Reina aD Pal 194MM Passed fe He The internal and extemal surface [ Heer ‘of the conduits shall be smooth, Appearance Slearocatrec rem groosngand | smstoctory Passed other detects Resistance to heat ‘Conduits shall be resstanceto Confirm Passed heat Resistance to Burning Condit shail be se Confirm Passed ee extinguishing | Bending Test ‘Condits shal be Free from inside Confirm Passed | outside crack (Wiest softening Sao | 279" * ots |LTemperature Pde aN pnee 4 Me une; A] OZ pate: [K-06 j-7OZL| Storas 8 Logistics) © pate i Mae HED nial mo a ppd Agha) I gag tad gage GP Qplast Qatar National Plastic Factory W.L.L, etna ww as com, QNPF/Internal novucr rr aeronT : PRODUCT DESCRIPTION WAVE COUPLER 25 MM : 7 MATERIAL uve = cououR wr RAL 3016 - BATCH (-Qp/140/020/e2601/012 REFERENCE STANDARD BS 4607/EN 61386 \tSUAL speci atte i Descnirion REQUIREMENT senvarion MARKS Surface Finish should be Glossy Finish Senet Fini with ond pies shall” | Fert wit onda ies found | Poel tment nota lazer igiitng | ol OMI SZES | peewray tom gua) | WALLTHCRNESSV | ovenaLieNGrH | REMARKS L qm) | evan) 25MM. 25.30 I 2,00 20.10 52.00 40.10 assed QUALITY TST 7 DescnipTiON aeaunement | oasivavion eA Tea est Talveow rosin ferekeae |, se anit i Shlorw Faindvosmnatcne. | Pas Tapanded Toad aPTaR | Shl show vo dn TTS Sul shone Found Ho Sign of acs passed [Resance to Baring Fare sl i autre an 30 | second after removal of the Flame: gets af Ince Sagande ater Passed | second snnten | aan | at MTA | GT GAR TO WE | pony hme shins alte Sale. mane — ; [peseniprion — ne QUIREMENT OnaeRvATION TeMaris i FU ade shod — ciate juilfaiatcaaboae | Found ok Passed oh Storas & Logistic Q,PLAST/QC/086/04.04.2019 Ta dag tg ws gaa ject ven. cab com pa we BIN ‘te tr se ea, Set 4 4523139, 70 te 85, oma,

You might also like