Total Marks: 49
2O-CE-25
Lohaib Riaz
University of Engineering & Techn
Civil Engineering Department
s and explain landslide
as for construction projSphyt| * Universi 7
ib Riak sity of Engineering and Technol a
i: B logy, Taxi
partment of Civil Engineering
Mid Term Examination
Subject: Numerical Analysis
Registration no.:__Qo-
Note: Attempt all questions.
Class: CE-2Kz0 (3% Semester) Total Marks: 40
Question [ax. |
ae Statement ee
Marks
Apply fixed point iteration, f(x) = x‘ — x + 0.2, the root near 1, x = 1. 10
O = tixto. 9 Xx -c yu
Zo eye
The following table gives the temperatures recorded in Islamabad from 1* February to
15 July in 1987.
a @ 2 2 - e 2
2. [February | March | April May June July - 10
L 30.3°C | 32.1°C_| 37.2 °c | 39.8°C | 35.3°C | 29.8 a
Find out the approximate value of temperature on 15" February, 1987.
|
show that A” yy = V7 Yx+r / \ .
as
(iy
% \
W, Solve the following system ae, by Gauss Et method: | 10
: el
ee iay +z 39.66 |
1oxty-22= 774
Time Allowed: oLhe-40-min-“uorssnosip
quzagyad YIM Jomsue nok yloddng *Ayijiqeanp wit} Buoy JooJJe UBD JY} O1eIS ,
(5°2) | ysaay auf UI TINS Sf a}e70U09 O[TYM an900 yey} sjuDAe/sonss} Sosy} Aue aquiaseg | 7 O
“oUIS ye pomoyye oq Wes UoHORdWOD JENUe|AL ‘saoue]SUUnodto
qeyM Jopup) ‘SUONBIGIA JOAO PUue SUO}TeIqIA Jepurt-o} onp ejasou0d Ul
(¢"2) | poonpoad aq ueo syoayep UM *9]a10U0D JO UOHepI]OSUOD JO asodind oy} 0383g | €°O
-sajdurexo a]qeqins yim Jamsue anok uoddng gsonbiuyse) uoreyiodsuey
(g)_ | s00d Aq poyayge aq eo ayos0U09 Poys|uyy JO Ayyenb oy} Moy yey) urepdxy | 2°O
¢Supxjuay Jo saouanbasuod ay} ase YM gau!s 3 PaMol|e S| a49U02
T-O1d
top | (s) way suon!puod yeYM Japun ga}219U09 Jo Suyxwas ay} azewUNs | TO
< damsue Jno 03 a1y19eds ag
aiqeoijdde asoym swesSelp yeau mesg.
“suoljsanb jje Jdway
saqnuyw Og aw) O€ Sse) WNLUIXe Ay
sn Youd
(ayas9u09 yo sajpadosd :1Z)Z 4a3sawWas-pII\))
quawyedag Bujjaeulsuq |IAID
VIXVL ‘ADOTONHDAL GNV ONINSANIONA JO ALISHAAINN
[97%po- CE-RE
Zohib Riaz
Mid-Term Exam of Islamic Studies
3" Semester, Session 2k20, Civil Engineering Department, UET Taxila
‘Time: 100 Minutes Marks: 25
Instruction: Attempt in sequence of question paper.
Qi
List down fundamental characteristics of an ideal Muslim individual for
character building of youth in light of Sora-Al Furqan
(Marks: 5) (CLO-1 & PLO-6)
Q2
Recall Imam al-Ghazali’s objective theory of Shari’ah, why it is not
allowed to throw 10 people in ocean save 290 people.
(Marks: 5) (CLO-2 & PLO-6)
Q.3 What the main events of 40 years’ biography of Holy Prophet
(PBUH) are set for character building of the followers of him?
(Marks: 10) (CLO-2 & PLO-8)
Q4'Aitémpt(Arabic text with English tanslation}
farks: 5) (CLO-2 & PLO-6)
If Mr. Nasar Hussain Lashari of 63 years old died, you go to attend his
funeral ceremony what the Arabic text of supplications (Dua) you will
recite after 3rd Takbeer. (if you are a male student)
Or
+ As an elder sister if your father assigned you a task to teach Dua-e-
Qanoot to your younger brother what the Arabic text you will teach him.
(if you are a female student)
4.4 Anemi:
Department of Basie Sciences and Humanities
University of Engineering and Technology Taxilayy - e RE
eit: Dhaib tia
University of Et te and Technology’ Taxila
Civil Engineering Department
Paper: Engineering Practice (Theory)
: Mid Exam: Session 2020
Time: 1 Hour and 30 minutes
Maximum Marks: 25
NOTE: ATTEMPT ALL QUESTIONS AND DRAW NEAT SKETCH/DIAGRAM WHERE NECESSARY.
QNo. 01 PLO-1, CLO-1 (a5)
a) Explain the advantages and disadvantages of owing an equipment rather than renting it.
b) Describe factors affecting output of excavation units.
c) Explain the process of constructing a Tunnel using Blasting method.
QNo. 02 PLO-11, CLO-3 (10)
‘A tunnel needs to be constructed in Margalla hills to connect Islamabad with upstream areas of
Khanpur dam. The diameter of the proposed tunnel is 15 feet and length 5 kilometers.
a) Apply the knowledge delivered in this subject to justify whether to use Tunnel Boring
Machine (TBM) or Blasting method for the construction of the tunnel in the most
economical way.
b) What method will be more suitable if the tunnel needs to be constructed on emergency
basis? fae |
c) What machinery will be required for Spoil Handling in this project?cone ML Bennne lot
visaton ant
Nee Se he
LINIVERSITY OF ENGINEERING & TECHNOLOLY, IAXILA
DEPARTMENLOF CIVIL ENGINEERING
00 -¢ “25
sijoct Platt Mectantesst
aloe Aton allay
Ne
ation
eerie auitatslo vating For the Missing Data, any
~ Questions Marks
Feptain ond prove Fydiostatic Law, Draw a neat Figere with alead pencil. ey.
| oc |
12 (ny
un
Date: 22-11-2021
Time Allowed, 100 mins
Max Marks: 25
A ehip: is designod to cary precast 4