You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS


AND HIGHWAYS

6 5 4 3 2 1 1 2 3 4 5 6
OFFICE OF THE BUILDING OFFICIAL

ILOILO CITY

0.50

0.50
ARCHITECTURAL
4.30

4.30
3.50

3.50
W4
W6 W6 W7 D6 W8
7.80

FIREWALL
1.00

0.95
0.05
3.50

3.50

3.50

3.50
W9 W4
W3 W5
D3 D2

RIGHT SIDE ELEVATION LEFT SIDE ELEVATION


SCALE 1:100MTS. SCALE 1:100MTS.

A B C D E E D C B A
0.52

1.09

3.50
4.63

4.30
3.50

3.50

7.80
W3 D4 D7
FIREWALL

3.50
3.50
3.46

3.50

3.50
W1 D1 W2

SECTION THRU "A-A"


FRONT ELEVATION REAR ELEVATION SCALE 1:100MTS.
SCALE 1:100MTS. SCALE 1:100MTS.

CERTIFIED BY: NOTE:


PROJECT TITLE: OWNER: REVISIONS: SHEET CONTENT: SHEET NO:
THESE DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE
OBJECT FOR WHICH THEY ARE MADE EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR A PROPOSED TWO STOREY RESIDENTIAL BUILDING IRA ANGELA AND RAYMUND BELONIO A
P.R.C. NO. : P.T.R. NO. :
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN
THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED AND PERIMETER FENCING RENOVATION AS SHOWN 3
PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR
VALID UNTIL: ISSUED ON : OF SAID DOCUMENTS.

TIN NO.: ISSUED AT : LOCATION: MARGARUITA ST. BLK.3 1434 FUENTES SUBD., BRGY. 11, ROXAS CITY, CAPIZ DATE: ARCHITECTURAL
SEC. 33 REPUBLIC ACT 9266

You might also like