Nama Proyek :

DAFTAR UPAH HARIAN & ABSENSI PEKERJA HARIAN

1/11/20xx Total Total Biaya


Upah (A) Lembur (B) Total Kerja Lembur (D) Total Biaya Lembur (BxD) Total
No Nama Pekerja Jabatan /hari /jam Se Rb Km Jm Sa Mg Sn Rb Km Jm Sa Mg Sn Sn Se (C) hari jam lembur Upah (AxC) hari Keseluruhan Paraf Pekerja
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 jam

1 Xxxxxxx 1 3 1 1 1 2 1 1 1 1 1 1 1 1 1 1 16 3.00 0.00 0.00 0.00


Tukang 0.00 0.00
2 Xxxxxxx 1 3 1 1 1 2 2 1 1 4 1 4 1 1 1 2 3 1 1 1 1 18 16.00 0.00 0.00 0.00
Tukang 0.00 0.00
3 Xxxxxxx 1 1 1 1 1 1 1 1 1 1 1 11 0.00 0.00 0.00 0.00
Kenek 0.00 0.00
4 Xxxxxxx 1 4 1 2 1 1 1 4 1 2 1 4 1 1 1 1 1 1 1 1 14 17.00 0.00 0.00 0.00
Safety Man 0.00 0.00
5 Xxxxxxx 1 3 1 1 1 1 1 1 2 1 2 1 3 2 3 1 1 1 1 15 13.00 0.00 0.00 0.00
Safety Man 0.00 0.00

Jam Masuk / Pulang 07.30 22.00 07.30 21.00 07.30 17.00 07.30 17.00 07.30 22.00 07.30 20.00 07.30 22.00 23.00 22.00 07.30 20.00 07.30 22.00 07.30 01.00 07.30 17.00 07.30 17.00 07.30 17.00 07.30 17.00
TOTAL 0.00

Jakarta, xx November 20xx


Yang Membuat, Mengetahui, Mengetahui, Menyetujui,

Mustofa Fahruroji ( …............................... ) ( …............................... ) Xxxxxx Xxxxxxx


(Site Manager) (Project Manager)