Professional Documents
Culture Documents
C2
4000
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500
805 5390 805
C3
5190,5
6001
BATCH VACUUM PAN BATCH VACUUM PAN BATCH VACUUM PAN BATCH VACUUM PAN BATCH VACUUM PAN BATCH VACUUM PAN
REFINERY REFINERY REFINERY REFINERY REFINERY REFINERY
beam 4 beam 4
C4
C5'' 5390 1610 5390 1610 5390 1610 5390 1610 5390 805
02
7000
C5'
2500
C5 C5''
(Top view)
PROJECT SITE:-
BELES -1
CONTRACTOR:-
METALS AND ENGINEERING CORPORATION COSULTANT:
MATERIAL : Qty :
" This design and drawing is not given or sold but loaned it remains the DSN design team
property of metals and engineering corporation subject to their DRN. design team Pri Mech Pvt. Ltd. Co.
recall. It is confidential and must not be made public or copied or
reproduced without previous written permission."
CHD. design team ADDIS ABABA