Professional Documents
Culture Documents
Catalina
Catalina
– An Introduction Slide 1
III16-PPT-ItascaIntroduction-05
GEOMECHANICS, HYDROGEOLOGY, and MICROSEISMICS
CIVIL●●ENVIRONMENTAL
CIVIL ENVIRONMENTAL ● MANUFACTURING ●● MINING
● MANUFACTURING MINING ● OIL &
● OIL & GAS ● POWER
GAS ● POWERGENERATION
GENERATION www.itascainternational.com
III16-PPT-ItascaIntroduction-04 Itasca International Inc. – An Introduction Slide 2
ITASCA INTERNATIONAL
• Engineering consulting and software development company
• Our state-of-the-art numerical modeling programs are among the most widely used and
respected tools of their kind
• Itasca benefits from the dynamic interplay between our consulting, software
development and contract research activities
• Our engineers and software developers have a proven track record of innovation,
leading to new strategies and tools to better understand the complex environments in
which our clients work
ORGANIZATION
ITASCA SERVICES
CIVIL ENGINEERING
Project Types Problems Solved
MINING ENGINEERING
Project Types Problems Solved
• Open Pit and Surface Mining • Excavation Stability & Ground Control
• Underground Mining • Infrastructure Design
• Caving Mining • Subsidence
• Solution (Evaporates) Mining • Blasting Efficiency
• Materials Handling • Cavability & Fragmentation
• Tailings and Waste Rock • Recovery and Dilution
• Underground Coal Gasification • Backfill
• Tailings Impoundment
• Tailing Dam Design and Stability
• Solution Mining
• Heap Leach Optimization
• Mine Dewatering
• Fate and Transport Analysis of Chemicals
• Water Supply, Quality and Resource Impacts
• Hydrogeological Characterization
• Rock Mass Characterization
POWER GENERATION
Project Types Problems Solved
www.itascacg.com/flac
www.itascacg.com/flac3d
www.itascacg.com/udec
www.itascacg.com/3dec
www.itascacg.com/pfc
MINEDW Software
•General groundwater flow modeling tool with
enhanced capabilities for mine dewatering studies
•www.itascadenver.com/minedw.html
www.itascainternational.com
6° CONGRESO LATINOAMERICANO DE
TÚNELES Y OBRAS SUBTERRÁNEAS
LIMA, PERU
ITASCA S.A.
21 de Agosto, 2017
CIVIL
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● MANUFACTURING
● POWER GENERATION● MINING ● OIL & GAS ● POWER GENERATION
Mayo 2017 Lámina 2
INTRODUCCIÓN
INTRODUCCIÓN..
CIVIL
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● MANUFACTURING
● POWER GENERATION● MINING ● OIL & GAS ● POWER GENERATION
5Mayo 2017 Lámina 5
• Sin embargo, dicha solución no era factible a su paso bajo la actual Avda. Kennedy,
donde se proponía una solución de túnel en mina excavado mediante Método Alemán
• El túnel se ataca desde un pozo situado entre los dos estribos Norte del actual viaducto
de Américo Vespucio. En la vertical del túnel se sitúan los estribos y pilas centrales
del viaducto
• La modelización se realizó dentro de una fase de diseño conceptual, por lo que se hizo
necesario introducir algunas simplificaciones por falta de información detallada
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
6Mayo 2017 Lámina 6
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
7Mayo 2017 Lámina 7
Geometría del túnel en mina propuesto
• Ancho de excavación = 18 m
• Altura de excavación = 16.16 m
• Espesor hastiales = 2.5 m
• Espesor costillas en clave = 2 m
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
8Mayo 2017 Lámina 8
Galerias temporales
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
9Mayo 2017 Lámina 9
Geometría del pozo de ataque
En la fase final de modelización se va
a considerar la excavación de los
ramales AVO y 4AA, que dejan muy
poco espesor de tierras sobre clave
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
10 Sostenimiento y construcción del pozo
Lámina 10
Pile (d=80/100 cm)→ elementos 1-d de dos nodos por elemento, 6 grados de
libertad por nodo, comportamiento elástico lineal y un acoplamiento rígido- Vigas de hormigón armado, que se simularán mediante
plástico al mallado, para simular la resistencia por fuste . elementos tipo beam
Cables →elementos 1d, con dos nodos por elemento, 1 grado de libertad
por nodo (1 desplazamiento coaxial con el cable), un comportamiento
elástico-plástico (para simular la resistencia límite del cable) y un
acoplamiento rígido-plástico al mallado (para simular el límite de
adherencia del bulbo).
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
11 Simulación del viaducto actual Avda. Kennedy
Lámina 11
• Se prevé una ampliación futura del viaducto actual, lo que supondrá un incremento de las cargas que lleguen
al túnel en el futuro
• Además de la geometría actual, se añadió la futura actuación
• Como fase final del análisis, se incorporó la ampliación con sus correspondientes cargas
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
12 Nivel Freático
Lámina 12
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
13 Fraguado del Hormigón
Lámina 13
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
14 Lámina 14
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
16 Análisis de resultados
Lámina 16
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
17 Análisis de resultados
Lámina 17
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
18 Análisis de resultados
Lámina 18
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
19 Análisis de resultados
Lámina 19
Tracciones en el hormigón
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
20 Conclusiones
Lámina 20
Se analiza túnel en mina, que se prevé construir por el Método Alemán, previstos en la Autopista
Américo Vespucio Oriente a su paso bajo la Avda. Kennedy.
Tanto las sobrecargas de tráfico de la Avda. Kennedy, como las del viaducto actual de la Avda. Américo
Vespucio han sido introducidas en la modelización, para cuantificar su interacción con el túnel.
El análisis del modelo se ha centrado en los asientos susceptibles de producirse en la Avda. Kennedy y
en la cimentación del viaducto de la Avda. Américo Vespucio, así como en las cargas en los
sostenimientos del túnel
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017 Lámina 21
CIVIL
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● MANUFACTURING
● POWER GENERATION● MINING ● OIL & GAS ● POWER GENERATION
Mayo 2017 Lámina 22
INTRODUCCIÓN
• Se incluyen todos los elementos y estructuras presentes en la zona: cimentación y estructura del
Templo de la Sagrada Familia, estación y túnel de la Línea 2 de FMB, elementos de protección
previstos, así como el propio túnel AVE (tuneladora EPB).
• La profundidad del eje del túnel en una sección transversal por el centro del Templo es de 31.85
3. Comportamiento observado
4. Conclusiones
Fase de Proyecto
• Geometría de la EPB
• Alternativas de trazados
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
25/36 Lámina 25
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
26/36 Lámina 26
Fase de Estudio Informativo – Templo y obras aledañas
FLAC3D 2.10
p 7303 Model Perspective
00:53 Fri Oct 11 2002
nter: Rotation:
-3.815e+001 X: 40.000
1.826e+002 Y: 0.000
5.894e-007 Z: 310.000
Línea y Estación Metro
t: 7.957e+002 Mag.: 1.25
Ang.: 22.500
ock Group
nucleo
Linea2
NLinea2
Estacion
Encepado
Muro
Losa
edificio
pila
mampost
abside
absidem
columna
Túnel AVE
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
27/36 Entorno del Túnel y EPB
Lámina 27
El avance es discontinuo, excavando de forma instantánea cilindros de túnel de longitud igual a la de los
anillos del revestimiento:
i) Se aplica sobre el frente recién excavado una presión total correspondiente a la presión de tierras en la
cámara de excavación de la EPB.
ii) Se avanza la coraza del escudo hasta el frente de excavación. El diámetro de la tuneladora es inferior al
de excavación, y además su geometría es troncocónica, por lo que el terreno de la clave es susceptible de
experimentar una semiconvergencia hasta llegar a contactar con la coraza del escudo
iii) Inmediatamente tras avanzar el escudo, se activan los elementos del mallado que simulan tanto el anillo
de dovelas como la inyección continua de mortero por la cola del escudo entre el terreno y el extradós de
las dovelas.
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
28/36 Lámina 28
Obras de Mitigación
Pantalla de Pilotes
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
29/36 Lámina 29
0.00E+00
-2.00E-03
-4.00E-03
-6.00E-03
Desplazamiento vertical (m)
-8.00E-03
-1.00E-02
-1.20E-02
-1.40E-02
-1.60E-02
-1.80E-02
-150 -100 -50 0 50 100 150
Distancia al eje (m)
Sin pantalla 2 pantallas continuas-8 m
Pilotes ambos lados Pilotes lado Sagrada Familia
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
30/36 Lámina 30
Fase de Proyecto – Análisis del Pórtico de La Gloria
2 TORRES SOBRE CADA CONJUNTO:
-1950 Ton cada torre durante la excavación del túnel
- 6111 Ton cada torre al final de la construcción
FLAC3D 2.10
Step 17366 Model Perspective
13:32:02 Wed Nov 30 2005
Construcción
Center: Rotation:
X: 1.307e+001 X: 20.000 futura del
Y: -5.286e+001 Y: 0.000
Z: 2.305e+001 Z: 330.000 templo..
Dist: 9.140e+002 Mag.: 5.96
Ang.: 22.500
Block Group
nucleo
pilote
losa
fachada
SEL Geometry
Magfac = 1.000e+000
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
31/36 Lámina 31
Fase de Proyecto – Análisis del Pórtico de La Gloria
Job Title: Hipótesis C:semilosa+muerto de hormigón+consolidación con cargas actuales
FLAC3D 2.10
Step 97951 Model Projection View Title:
13:12:08 Wed Dec 28 2005
Center: Rotation:
X: -9.358e-001 X: 90.000
Y: -2.328e+000 Y: 0.000
Z: -2.407e+000 Z: 0.000
Dist: 9.095e+002 Size: 3.000e+002
Contour of Z-Displacement
Plane: on
Magfac = 1.000e+000
-8.5089e-003 to -8.0000e-003
-8.0000e-003 to -7.0000e-003
-7.0000e-003 to -6.0000e-003 Job Title: Hipótesis C:semilosa+muerto de hormigón+consolidación con cargas actuales
-6.0000e-003 to -5.0000e-003 FLAC3D 2.10
-5.0000e-003 to -4.0000e-003 Step 97951 Model Perspective View Title:
-4.0000e-003 to -3.0000e-003 13:12:31 Wed Dec 28 2005
-3.0000e-003 to -2.0000e-003
-2.0000e-003 to -1.0000e-003 Center: Rotation:
-1.0000e-003 to -9.5344e-005 X: 3.151e+000 X: 0.000
Interval = 1.0e-003 Y: -2.814e+001 Y: 0.000
Z: 1.093e+001 Z: 0.000
Sketch Dist: 9.095e+002 Mag.: 4.77
Magfac = 1.000e+000 Ang.: 22.500
Linestyle
Itasca Consulting Group, Inc. Plane Origin: Plane Orientation:
Minneapolis, MN USA X: 0.000e+000 Dip: 90.000
Y: -5.150e+001 DD: 0.000
Z: 0.000e+000
Contour of Z-Displacement
Plane: on
Magfac = 1.000e+000
-3.8140e-002 to -3.7500e-002
-3.5000e-002 to -3.2500e-002
-3.0000e-002 to -2.7500e-002
-2.5000e-002 to -2.2500e-002
-2.0000e-002 to -1.7500e-002
-1.5000e-002 to -1.2500e-002
-1.0000e-002 to -7.5000e-003
-5.0000e-003 to -2.5000e-003
0.0000e+000 to 0.0000e+000
Interval = 2.5e-003
Displacement
Plane: on
Itasca Consulting Group, Inc.
Minneapolis, MN USA
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
32/36 Lámina 32
Fase de Proyecto – Análisis del Pórtico de La Gloria
Efecto de la aplicación de cargas finales en el Pórtico
0.0
-5.0 Construcción
futura del templo
presenta un
Desplazamiento vertical (mm)
-15.0
-20.0
-25.0
-150 -100 -50 0 50 100 150
Distancia al eje (m)
Sin pilotes Con pilotes carga actual Con pilotes tras carga final
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
33/36 Lámina 33
• Esto suponía pasar el túnel bajo varias manzanas de edificios, por lo que se
proponían tratamientos a base de inyecciones de compensación
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
34/36 Lámina 34
FLAC3D 2.10
Step 4519 Model Projection
14:02:04 Wed Feb 11 2004
Center: Rotation:
X: 5.000e+000 X: 90.000
Y: 1.044e+002 Y: 0.000
Z: 0.000e+000 Z: 0.000
Dist: 6.987e+002 Size: 3.474e+002
Block Group
pad234
mall458
mall478
pad232
cast259
cast248
vilar17
pad228
pad226
val497
val499
val485
val503
nucleo
Sketch
Magfac = 0.000e+000
Linestyle
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
35/36 Lámina 35
Fase de Proyecto - Alternativa de Trazado
Modelo sin tratamientos
FLAC3D 2.10
Step 88590 Model Projection
11:54:35 Fri Feb 13 2004
Center: Rotation:
X: 5.000e+000 X: 90.000
Y: 1.098e+002 Y: 0.000
Z: -8.247e+000 Z: 0.000
Dist: 6.430e+002 Size: 2.558e+002
Contour of Z-Displacement
Plane: on
Magfac = 1.000e+000
-2.5008e-002 to -2.5000e-002
Cubetas de asientos a distintas cotas
-2.5000e-002 to -2.2500e-002
-2.2500e-002 to -2.0000e-002 MODELO 2 - SIN TRATAMIENTO
-2.0000e-002 to -1.7500e-002
-1.7500e-002 to -1.5000e-002
-1.5000e-002 to -1.2500e-002 0.00E+00
-1.2500e-002 to -1.0000e-002
-1.0000e-002 to -7.5000e-003 -5.00E-03
-7.5000e-003 to -5.0000e-003
-5.0000e-003 to -2.5000e-003
-2.5000e-003 to -1.6833e-003 -1.00E-02
Interval = 2.5e-003
Sketch -1.50E-02
-3.00E-02
-3.50E-02
-4.00E-02
-4.50E-02
-5.00E-02
-75 -50 -25 0 25 50 75
Distancia al eje del túnel (m)
z=8.547 z=12.547 z=20.047 z=27.547 (superficie)
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
36/36 Lámina 36
Fase de Proyecto - Alternativa de Trazado
Modelo sin tratamientos
FLAC3D 2.10
Step 99044 Model Perspective
12:01:53 Fri Feb 13 2004
Center: Rotation:
X: 6.600e+000 X: 30.000
Y: 9.485e+001 Y: 0.000
Z: 1.460e+001 Z: 310.000
Dist: 6.430e+002 Mag.: 1
Ang.: 22.500
Contour of Z-Displacement
Magfac = 8.000e+002
Exaggerated Grid Distortion
-2.2105e-002 to -2.0000e-002
-2.0000e-002 to -1.7500e-002
-1.7500e-002 to -1.5000e-002
-1.5000e-002 to -1.2500e-002
-1.2500e-002 to -1.0000e-002
-1.0000e-002 to -7.5000e-003
Cubetas de asientos tras el tratamiento
-7.5000e-003 to -5.0000e-003 5.00E-03
-5.0000e-003 to -2.5000e-003
-2.5000e-003 to -4.1423e-005
Interval = 2.5e-003
0.00E+00
-5.00E-03
-1.50E-02
Deformada tras el tratamiento
(magnificada x800) -2.00E-02
-2.50E-02
-3.00E-02
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80
Distancia al eje (m)
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
37/36 Lámina 37
Fase de Obra
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
38/36 Fase de Obra – Modelo estructural del Templo
Lámina 38
Estructura de la cimentación
FLAC3D 3.10
©2006 Itasca Consulting Group, Inc.
Settings: Model Projection
13:10:50 Thu Jun 25 2009
Center: Rotation:
X: -4.755e+001 X: 90.000
Y: 9.000e+001 Y: 0.000
Z: 2.027e+001 Z: 0.000
Dist: 2.545e+002 Size: 1.013e+002
FLAC3D 3.10
©2006 Itasca Consulting Group, Inc. Block Group
Live & unassigned mech zones shown
Step 28381 Model Perspective enc5
11:26:08 Wed Aug 19 2009 enc7
enc8
enc3
Center: Rotation: enc12
X: -4.905e+001 X: 30.000 enc16
Y: 9.626e+001 Y: 0.000 enc32
Z: 3.217e+001 Z: 320.000 enc51
enc33
Dist: 8.146e+002 Mag.: 3.5
enc38
Ang.: 22.500 enc24
enc27
enc35
SEL Geometry enc11
Magfac = 0.000e+000 enc28
enc44
Block Group enc25
enc29
Live mech zones shown enc23
enc51 Itasca Consulting Group, Inc.
enc50 Minneapolis, MN USA
enc40
enc42
enc39 FLAC3D 3.10
enc44 ©2006 Itasca Consulting Group, Inc.
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
39/36 Fase de Obra – Modelo estructural del Templo
Lámina 39
FLAC3D 3.10
©2006 Itasca Consulting Group, Inc.
Step 28381 Model Perspective
11:37:06 Wed Aug 19 2009
Y Center: Rotation:
X: -4.693e+001 X: 17.500
Z X Y: 1.081e+002 Y: 0.000
Z: 5.197e+001 Z: 327.500
Dist: 8.146e+002 Mag.: 3.1
Ang.: 22.500
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
40/36 Fase de Obra – Modelo estructural del Templo
Lámina 40
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
41/36 Fase de Obra – Modelo estructural del Templo
Lámina 41
Job Title: Modelo completo - Inyección coraza=100% - Cut=130 Job Title: Modelo completo - Inyección coraza=0% - Cut=130
FLAC3D 3.10 FLAC3D 3.10
©2006 Itasca Consulting Group, Inc. View Title: ©2006 Itasca Consulting Group, Inc. View Title:
Step 171725 Model Projection Step 145645 Model Projection
13:31:10 Sat Aug 29 2009 10:39:55 Sat Aug 29 2009
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
42/36 Fase de Obra – Modelo estructural del Templo
Lámina 42
Job Title: Modelo completo - Sin túnel AVE - Fin construcción Sagrada Familia
FLAC3D 3.10
©2006 Itasca Consulting Group, Inc. View Title:
Step 41412 Model Perspective
09:14:38 Wed Aug 26 2009
Center: Rotation:
X: -5.097e+001 X: 60.000
Y: 8.786e+001 Y: 0.000
Z: 3.248e+001 Z: 300.000
Dist: 8.086e+002 Mag.: 2.44
Ang.: 22.500
Contour of Z-Displacement
Magfac = 0.000e+000
Live mech zones shown
-3.0720e-002 to -3.0000e-002
-3.0000e-002 to -2.5000e-002
-2.5000e-002 to -2.0000e-002
-2.0000e-002 to -1.5000e-002
-1.5000e-002 to -1.0000e-002
-1.0000e-002 to -5.0000e-003
-5.0000e-003 to -2.8064e-003
Interval = 5.0e-003
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
43/36 Fase de Obra – Calibración modelo de cálculo
Lámina 43
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
44/36 Lámina 44
Módulos small-strain
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
45/36 Lámina 45
Módulos small-strain
Análisis de la excavación del aparcamiento de New Palace Yard sobre el Big Ben (Londres)
Fuente: Muir Wood, D. (1990). Soil behaviour and critical state soil mechanics, pp. 428-431.
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
46/36 Lámina 46
Módulos small-strain
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
47/36 Lámina 47
Módulos small-strain
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
48/36 Fase de Obra – Calibración modelo de cálculo
Lámina 48
Hipótesis de partida:
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
49/36 Fase de Obra – Calibración modelo de cálculo
Lámina 49
PK 4800.
0.000
-0.002
-0.004
-0.008
-0.010
-0.012
-0.014
-0.016
-0.018
-0.020
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
Distancia al eje del túnel (m)
Desplazamientos Verticales H1 Desplazamientos Verticales H2
Desplazamientos Verticales H3 Desplazamientos Verticales H4
Desplazamientos Verticales H5 Desplazamientos Verticales H6
Desplazamientos Verticales H7 Desplazamientos Verticales H8
Desplazamientos Verticales H9 Desplazamientos verticales medidos
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
50/36 Fase de Obra – Calibración modelo de cálculo
Lámina 50
Hipótesis sin inyección de coraza con modelo constitutivo de Hardening con small-
strain:
nº calculo Nº Hipótesis f epb_en_cabeza(m) f epb_en_cola(m) Ko Modelo_constitutivo gs g s_ref
Hardening en carga y
10 11.52 10.49 0.8
14 descarga con small-strain 1.00E-02 4.00E-04
Hardening en carga y
11 11.52 10.49 0.8
15 descarga con small-strain 1.00E-02 2.00E-04
g70=4E-4 g70=2E-4
1.00E+00 1.00E+00
9.00E-01 9.00E-01
8.00E-01 8.00E-01
7.00E-01 7.00E-01
6.00E-01 6.00E-01
G/Go
G/Go
5.00E-01 5.00E-01
4.00E-01 4.00E-01
3.00E-01 3.00E-01
2.00E-01 2.00E-01
1.00E-01 1.00E-01
0.00E+00 0.00E+00
1.E-07 1.E-06 1.E-05 1.E-04 1.E-03 1.E-02 1.E-01 1.E+00 1.E-07 1.E-06 1.E-05 1.E-04 1.E-03 1.E-02 1.E-01 1.E+00
gamma gamma
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
51/36 Fase de Obra – Calibración modelo de cálculo
Lámina 51
PK 4800.
0.000
-0.002
-0.004
-0.008
-0.010
-0.012
-0.014
-0.016
-0.018
-0.020
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
Distancia al eje del túnel (m)
Desplazamientos Verticales H1 Desplazamientos Verticales H11
Desplazamientos Verticales H12 Desplazamientos Verticales medidos
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
52/36 Fase de Obra – Calibración modelo de cálculo
Lámina 52
PK 4800.
0.000
-0.002
-0.004
-0.006
Desplazamiento (m)
-0.008
-0.010
-0.012
-0.014
-0.016
-0.018
-0.020
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
Distancia al eje del túnel (m)
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
53/36 Fase de Obra – Recálculo con modelo small-strain
Lámina 53
FLAC3D 3.10 Job Title: Modelo completo - Small-Strain mod. Inyección coraza=0% - Cut=130
©2006 Itasca Consulting Group, Inc. View Title:
Step 109227 Model Projection
11:53:48 Thu Aug 12 2010
Center: Rotation:
X: -3.160e+001 X: 90.000
Y: 6.030e+001 Y: 0.000
Z: 1.410e+001 Z: 270.000
Dist: 8.084e+002 Size: 2.059e+002
Contour of Z-Displacement
Plane: on
Magfac = 1.000e+000
Live mech zones shown
-7.0246e-003 to -7.0000e-003
-7.0000e-003 to -6.0000e-003
-6.0000e-003 to -5.0000e-003
-5.0000e-003 to -4.0000e-003
FLAC3D 3.10 Job Title: Modelo completo - Small-Strain mod. Inyección coraza=0% - Cut=130
-4.0000e-003 to -3.0000e-003
-3.0000e-003 to -2.0000e-003 ©2006 Itasca Consulting Group, Inc. View Title:
-2.0000e-003 to -1.0000e-003 Step 109227 Model Projection
-1.0000e-003 to 0.0000e+000 11:54:35 Thu Aug 12 2010
Interval = 1.0e-003
Sketch Center: Rotation:
X: -2.050e+001 X: 90.000
Magfac = 1.000e+000
Y: 5.841e+001 Y: 0.000
Itasca Consulting Group, Inc. Z: -1.680e+001 Z: 0.000
Minneapolis, MN USA Dist: 8.084e+002 Size: 1.647e+002
Contour of Z-Displacement
Magfac = 1.000e+000
Live mech zones shown
-2.6574e-003 to -2.5000e-003
-2.5000e-003 to -2.2500e-003
-2.2500e-003 to -2.0000e-003
-2.0000e-003 to -1.7500e-003
-1.7500e-003 to -1.5000e-003
-1.5000e-003 to -1.2500e-003
-1.2500e-003 to -1.0000e-003
-1.0000e-003 to -7.5000e-004
-7.5000e-004 to -5.0000e-004
-5.0000e-004 to -2.5000e-004
-2.5000e-004 to -2.8411e-005
Interval = 2.5e-004
Sketch
Magfac = 1.000e+000
Live mech zones shown
Linestyle
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
54/36 Fase de Obra – Recálculo con modelo small-strain
Lámina 54
FLAC3D 3.10 Job Title: Modelo completo - Small-Strain mod. Inyección coraza=0% - Cut=60
©2006 Itasca Consulting Group, Inc. View Title:
Step 60635 Model Projection
11:58:03 Tue Aug 10 2010
Center: Rotation:
X: -3.160e+001 X: 90.000
Y: 6.030e+001 Y: 0.000
Z: 1.410e+001 Z: 270.000
Dist: 8.084e+002 Size: 2.059e+002
Contour of Z-Displacement
Plane: on
Magfac = 1.000e+000
Live mech zones shown
-3.7551e-003 to -3.5000e-003
-3.5000e-003 to -3.0000e-003
-3.0000e-003 to -2.5000e-003
-2.5000e-003 to -2.0000e-003
-2.0000e-003 to -1.5000e-003
-1.5000e-003 to -1.0000e-003
-1.0000e-003 to -5.0000e-004
-5.0000e-004 to 0.0000e+000
Interval = 5.0e-004
Sketch
Magfac = 1.000e+000
Itasca Consulting Group, Inc.
Minneapolis, MN USA
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
55/36 Fase de Obra – Recálculo con modelo small-strain
Lámina 55
FLAC3D 3.10 Job Title: Modelo completo - Small-Strain mod. Inyección coraza=0% - Cut=70
©2006 Itasca Consulting Group, Inc. View Title:
Step 66730 Model Projection
12:31:20 Tue Aug 10 2010
Center: Rotation:
X: -3.160e+001 X: 90.000
Y: 6.030e+001 Y: 0.000
Z: 1.410e+001 Z: 270.000
Dist: 8.084e+002 Size: 2.059e+002
Contour of Z-Displacement
Plane: on
Magfac = 1.000e+000
Live mech zones shown
-4.0345e-003 to -4.0000e-003
-4.0000e-003 to -3.5000e-003
-3.5000e-003 to -3.0000e-003
-3.0000e-003 to -2.5000e-003
-2.5000e-003 to -2.0000e-003
-2.0000e-003 to -1.5000e-003
-1.5000e-003 to -1.0000e-003
-1.0000e-003 to -5.0000e-004
-5.0000e-004 to 0.0000e+000
Interval = 5.0e-004
Sketch
Itasca Consulting Group, Inc.
Minneapolis, MN USA
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
56/36 Fase de Obra – Recálculo con modelo small-strain
Lámina 56
FLAC3D 3.10 Job Title: Modelo completo - Small-Strain mod. Inyección coraza=0% - Cut=80
©2006 Itasca Consulting Group, Inc. View Title:
Step 73296 Model Projection
12:46:27 Tue Aug 10 2010
Center: Rotation:
X: -3.160e+001 X: 90.000
Y: 6.030e+001 Y: 0.000
Z: 1.410e+001 Z: 270.000
Dist: 8.084e+002 Size: 2.059e+002
Contour of Z-Displacement
Plane: on
Magfac = 1.000e+000
Live mech zones shown
-4.1440e-003 to -4.0000e-003
-4.0000e-003 to -3.5000e-003
-3.5000e-003 to -3.0000e-003
-3.0000e-003 to -2.5000e-003
-2.5000e-003 to -2.0000e-003
-2.0000e-003 to -1.5000e-003
-1.5000e-003 to -1.0000e-003
-1.0000e-003 to -5.0000e-004
-5.0000e-004 to 0.0000e+000
Interval = 5.0e-004
Sketch
Itasca Consulting Group, Inc.
Minneapolis, MN USA
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
57/36 Fase de Obra – Recálculo con modelo small-strain
Lámina 57
FLAC3D 3.10 Job Title: Modelo completo - Small-Strain mod. Inyección coraza=0% - Cut=85
©2006 Itasca Consulting Group, Inc. View Title:
Step 76700 Model Projection
13:00:35 Tue Aug 10 2010
Center: Rotation:
X: -3.160e+001 X: 90.000
Y: 6.030e+001 Y: 0.000
Z: 1.410e+001 Z: 270.000
Dist: 8.084e+002 Size: 2.059e+002
Contour of Z-Displacement
Plane: on
Magfac = 1.000e+000
Live mech zones shown
-4.1895e-003 to -4.0000e-003
-4.0000e-003 to -3.5000e-003
-3.5000e-003 to -3.0000e-003
-3.0000e-003 to -2.5000e-003
-2.5000e-003 to -2.0000e-003
-2.0000e-003 to -1.5000e-003
-1.5000e-003 to -1.0000e-003
-1.0000e-003 to -5.0000e-004
-5.0000e-004 to 0.0000e+000
Interval = 5.0e-004
Sketch
Itasca Consulting Group, Inc.
Minneapolis, MN USA
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
58/36 Fase de Obra – Recálculo con modelo small-strain
Lámina 58
FLAC3D 3.10 Job Title: Modelo completo - Small-Strain mod. Inyección coraza=0% - Cut=130
©2006 Itasca Consulting Group, Inc. View Title:
Step 109227 Model Projection
11:53:48 Thu Aug 12 2010
Center: Rotation:
X: -3.160e+001 X: 90.000
Y: 6.030e+001 Y: 0.000
Z: 1.410e+001 Z: 270.000
Dist: 8.084e+002 Size: 2.059e+002
Contour of Z-Displacement
Plane: on
Magfac = 1.000e+000
Live mech zones shown
-7.0246e-003 to -7.0000e-003
-7.0000e-003 to -6.0000e-003
-6.0000e-003 to -5.0000e-003
-5.0000e-003 to -4.0000e-003
-4.0000e-003 to -3.0000e-003
-3.0000e-003 to -2.0000e-003
-2.0000e-003 to -1.0000e-003
-1.0000e-003 to 0.0000e+000
Interval = 1.0e-003
Sketch
Magfac = 1.000e+000
Itasca Consulting Group, Inc.
Minneapolis, MN USA
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
59/36 Fase de Obra – Recálculo con modelo small-strain
Lámina 59
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
60/36 Lámina 60
Conclusiones
• Queda demostrado que una obra con gran dificultad técnica como la presente, puede ser
ejecutada de forma segura si se emplean los suficientes recursos de análisis durante la
fase de estudio/proyecto, así como de seguimiento durante la fase de obra.
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017 Lámina 61
CIVIL
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● MANUFACTURING
● POWER GENERATION● MINING ● OIL & GAS ● POWER GENERATION
Mayo 2017
62 Lámina 62
• La empresa Murias Grupo Empresarial, constructora a cargo del túnel, encargó un estudio
a ITASCA de la intersección del túnel con la cimentación del edificio para comprobar
las medidas de refuerzo previstas
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
63 Lámina 63
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
64 Lámina 64
Modelo simplificado para análisis de refuerzos
• Profundidad de la rasante = 19 m
• Radio de excavación bóveda = 7.70 m
• Altura máxima excavación = 7.49 m
• Anchura máxima excavación = 9.48 m
• Sostenimiento con 35 cm de hormigón proyectado
HP-30 y marcos metálicos HEB-200 cada 1 m
Rellenos
antrópicos
Arcillas
Limolitas
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
65 Lámina 65
Hipótesis de refuerzo Nº1
Riostra
• 35 cm hormigón proyectado HP-30
Micropilotes
• Marcos HEB-200 cada 1 m
• Corona de paraguas de micropilotes F114/8.8 mm
Paraguas
y L=15 m con solape de 3 m
Corona de Jet
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
66 Lámina 66
Hipótesis de refuerzo Nº2
Jet-grouting:
E=1.0 GPa, =0.3
c=0.64 MPa,
t=0.06 MPa • 35 cm hormigón proyectado HP-30
Paraguas • Marcos HEB-200 cada 1 m
• 2 coronas de paraguas de micropilotes F114/8.8 mm
y L=15 m con solape de 3 m
• Tratamiento de consolidación a base de jet-grouting
en las arcillas sobre la traza del túnel
Cercha
HP-30
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
67 Lámina 67
Hipótesis de refuerzo Nº3
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
68 Análisis de las hipótesis de refuerzo – Desplazamiento vertical
Lámina 68
Hipótesis 1 Hipótesis 2
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
69 Modelo 3D con la cimentación detallada
Lámina 69
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
71 Modelo 3D con la cimentación detallada
Lámina 71
Paraguas de
pilotes
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
72 Análisis de resultados Hipótesis 1
Lámina 72
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
73 Análisis de resultados Hipótesis 1
Lámina 73
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
74 Análisis de resultados Hipótesis 2
Lámina 74
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
75 Análisis de resultados Hipótesis 2
Lámina 75
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION
Mayo 2017
76 Lámina 76
Conclusiones y recomendaciones
• Los desplazamientos obtenidos en la cimentación del edificio en las dos hipótesis de
resistencia del jet consideradas son tan pequeños que suponen un riesgo despreciable
para la integridad del edificio
CIVILCIVIL ● MANUFACTURING
● MANUFACTURING ● MINING
● MINING ● OIL●&OIL
GAS & ●GAS ● POWER
POWER GENERATION
GENERATION