Professional Documents
Culture Documents
General
Many markets, one partner
TO: Non-alcoholic beverage customers (water, carbonated soft drinks, liquid dairy products, juices, nectars, isotonics, soft
drinks and teas);
Alcoholic beverage and FHPC customers (beer, wine and spirits, as well as food, home and personal care products)
EXPERT IN: Blowing, filling and labelling, packaging design, material-handling, case packing, shrink-wrapping, end-of-line
palletizing and line-engineering solutions for multiple applications.
Page 2
General
Serving Danone from 3 regions
Customer Management
Customer Management Europe & Central Asia
Americas
Marina
Frederic De Barros
Sailly
Equipment Beverage
Equipment Beverage (NA) José Priante
Marcos Pilati Services
Services Gilles Bouvier
David Bonhomme Project Management
Project Management Paola Bertossi
Benoit Carbonneau
Customer Management
Asia, Oceania & Africa
Clive
Smith
Equipment Beverage
R. Persaud
Services
Simone Mondini
Project Management
Meiqing Zhang
Page 3
General
Key Account Organization
Global Key Account Project Manager Global Key Account Director Danone Global Key Account Services Manager
Fréderic Guillemin Philippe RUBACH Jessy DELALANDRE
Page 4
General
While Energy price is rising strongly
General
Sustainability : main Solutions for line
Blowmolder
Ecoven on S2 : ~60k€ - 20% to 45 %savings
Eco lamps Series1 & S2 : ~15k€ - 15% savings Packer
Oven top reflector S1 & S2 : ~7,5k€ - 15% savings Mini-blue pack--O&U id CLC-023
Air recovery kit S1 & S2 : ~50k€ - 15% to 40% savings Vacuum pump 2 - CLC_012
Universal blowing blocks on S2 : ~4k€/station - 40% Std by mode – Dev on going
savings
Twister blocks (S1) : ~70k€
Digital
Evo –ON Eco for electrical & HP Air :
Mesure to improve ~ 250 € /month New
Tunnel / Pasto
HP Air flow meter
Plant Energy Recovery System (VRP025) New
Budget price installation included: 140K
Estimated yearly Savings: 70K€ Shrink wrapper
Packaging & Molds Line down time duration: 5 days
Cutting Unit EV5 (LSX-002) - 40K€ ;4 D
Rpet line down
Tcap SWING on C VRP024 : ~150K€ New
LSX019 nested packs ROI 6 months,
5% saving on steam – 25% saving on water
Packaging light weighting ~500k€/y savings
New last rinsing sprayers VRB048 :
Mold - Super Vented New LSX 018 economic tunnel belt New
~30K€
Over wrap film New
Water saving up to 40%
24 months
24
20 18 months
ROI in months
16
12 months
12 months
12
9 months
8
6 months
0
0% 10% 20% 30% 40% 50% 60% 70%
Conveyors
74 kWh
18 kWh 18 kWh
Filler Labeler
General
Let’s look at our TOP energy Savings solutions for Blowers
ROI Less Than 2 Years
Blowers Serie 1
ECO Lamps & Oven Top reflectors;
Twister Blocks (3 Years ROI)
Blowers Series 2
ECO Lamps & Oven Top reflectors; Air Recovery Kit;
Blowing Blocks Optimized
Blowers Universal
ECO Lamps & Oven Top reflectors; Air Recovery Kit
Today, numerous customers use the SuperVent technology. The installed base is above 8.000 bases and
half on boby.
June 2022
Flex
Care Eco
Performance Quality
Remote Support
Page 22 Title, 08 November 2022
General
THANK YOU
Savings in 40b air of at least 15% and up to 40% depending on The amount of recovered air is linked to the type
process parameters of blowers and depends also on the production conditions
Savings in 7b air of 100% on 95% of the applications. Only 20 Nm3/h Machine rate, number of blowing stations, preblow and blow pressure, bottle
are necessary capacity
on start-up to prime system The recovered air could be re-used to generate
Constant bottle quality with no variation in process parameters Preblow air
Operating reliability. No maintenance necessary Stretching and nozzle cylinders air
Low pressure air out of the machine
Reduced investment as compressors are sized
(the blower acts as a LP compressor)
to perfect fit
The minimum required PCC version to install this O&U is V2.02; for
prior versions, an update of the PCC is mandatory
Universal technology installed on Series 2 machines results in On each blowing station, a single assembly combines the nozzle
reduction of air dead volume by reducing the air circuit pipes cylinder and the valves for pre-blow, blowing and exhaust
Constant 40 bars air savings, independently Available for the following S2 versions:
of process parameters Standard
Air savings of up to 20% for a 500ml on a S2 one D34 HR
Reliable assembly with easier maintenance CHP
Two possible variants
Compatible with air recovery option
Compatible with nozzle safety cam
Value: Cost Optimisation, Effciency, Product Quality € saved per year* 31.500 €
Equipment: Series 1 blowers
Catalogue code: 899 (*) Energy price 0,20€/kWh
(*) Including maintenance
20% to 45% less electrical consumption New adjustment block/oven support: Independent setting of neck
Fewer lamps for 11% less installed power cooling shield for more stability
Sharper heating: Sharp zoning on preform surface and optimized Eco oven module for lamps cooling: The Super Cobra is replaced by a
under-neck stretching fan dedicated to each module
Easier to maintain: Heating module can be serviced on the bench Heating modules: Only 8 IR lamps, more efficient lamps, ceramic wall
while the machine runs with a spare module and top reflector
Ceramics are self-cleaning via pyrolysis effect Ceramic oven top reflector, adjustable in height
to fit all preform lengths
Wiring: Pre-wired cabinet added to supply power
to the fans
New automation and process: Updated main electrical cabinet (power
supply, new functionalities and readjustment of all process sheets)
Value: Cost Optimisation, Sustainability Value: Cost Optimisation, Sustainability € saved per year* 60 800 €
Equipment: Universal blowers except heat-set version Equipment:Series 2 blowers, except PH & PM models
Catalogue code: 1021 Catalogue code: 978
(*) Energy price 0,20€/kWh