This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT
3B M1
1S3
3A M1 F

M1

1S3

M1

S017
S011 4 UD F

S26.1

WR16-4-A-200-CS

BOLT LIST
BOLT SIZE LENGTH
No (IN) (MM)
Phan Van Thai Bui Van Hoi
2023.01.05 2023.01.07
10:45:02 +07'00' 07:49:18 +07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

Phan Van Thai


2022.12.31
SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM
REASON FOR MODIFICATIONS BY SUBCONTRACTOR: 15:50:23 +07'00' SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
CUT AND REWELD DUE FIELD FABRICATION ERROR WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2) DIMENSIONS, LAYOUTS AND SUPPORTING OF 1.5" AND BELOW ARE INDICATVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT THE JOB SITE BEFORE FABRICATION / ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
1S3 05/01/2023 AS - BUILT MARK UP 1S2 31/12/2022 AS - BUILT MARK UP 1S1 27/12/2022 AS-BUILT MARK UP DRAWING
NO ISO of S3
S2
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara Technip Energies, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

1B 102 1/2 THD F

1S3

1S3

102

BOLT LIST
BOLT SIZE LENGTH
No (IN) (MM)
Phan Van Thai
2023.01.05
10:44:49 +07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


REASON FOR MODIFICATIONS BY SUBCONTRACTOR: SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
ADDING NEW JOINT WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2) DIMENSIONS, LAYOUTS AND SUPPORTING OF 1.5" AND BELOW ARE INDICATVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT THE JOB SITE BEFORE FABRICATION / ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
1S3 05/01/2023 AS - BUILT MARK UP 1S2 31/12/2022 AS - BUILT MARK UP 1S1 27/12/2022 AS-BUILT MARK UP DRAWING
NO ISO of S3
S2
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara Technip Energies, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,

054 M1
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

052 M1

M1

3A M1 F
17 SUPPORT 1
18 SUPPORT 1
3A M1 F 19 SUPPORT 1
S18.1 3A M1 F 20 SUPPORT 1
1S3 WR16-4-A-200-CS M1

3A M1 F
S013
M1
3A M1 F

3A M1 F
S17.1 M1
WR16-4-A-200-CS

3A M1 F

3B M1
1S3 S012 4 UD F
M1 S013 4 UD F
046 M1 S014 4 UD F
S015 4 UD F

S19.1 BOLT LIST


S012
WR16-4-A-200-CS S015 BOLT SIZE LENGTH
No (IN) (MM)
Phan Van Thai Bui Van Hoi
Phan Van Thai 2023.01.03
2023.01.05 2022.12.31 07:44:08
10:45:15 +07'00' 15:50:39 +07'00' +07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
S014 STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
S20.1 STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
WR16-4-A-200-CS (inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


REASON FOR MODIFICATIONS BY SUBCONTRACTOR: SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
CUT AND REWELD DUE FIELD FABRICATION ERROR WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2) DIMENSIONS, LAYOUTS AND SUPPORTING OF 1.5" AND BELOW ARE INDICATVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT THE JOB SITE BEFORE FABRICATION / ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
1S3 05/01/2023 AS - BUILT MARK UP 1S2 31/12/2022 AS - BUILT MARK UP 1S1 27/12/2022 AS-BUILT MARK UP DRAWING
NO ISO of S3
S2
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara Technip Energies, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

3B M1

1S3

1S3

M1

BOLT LIST
BOLT SIZE LENGTH
No (IN) (MM)
Phan Van Thai
2023.01.05
10:45:26 +07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


REASON FOR MODIFICATIONS BY SUBCONTRACTOR: SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
CUT AND REWELD DUE FIELD FABRICATION ERROR WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2) DIMENSIONS, LAYOUTS AND SUPPORTING OF 1.5" AND BELOW ARE INDICATVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT THE JOB SITE BEFORE FABRICATION / ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
1S3 05/01/2023 AS - BUILT MARK UP 1S2 31/12/2022 AS - BUILT MARK UP 1S1 27/12/2022 AS-BUILT MARK UP DRAWING
NO ISO of S3
S2
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara Technip Energies, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

M1

M1
1S3

3A M1 F
S016
3B M1
S016 4 UD F
1S3
25 SUPPORT 1

S25.1

WR16-4-A-200-CS BOLT LIST


BOLT SIZE LENGTH
No (IN) (MM)
Phan Van Thai
Phan Van Thai
2023.01.05 2022.12.31
10:45:38 +07'00' 15:51:05 +07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


REASON FOR MODIFICATIONS BY SUBCONTRACTOR: SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
CUT AND REWELD DUE FIELD FABRICATION ERROR WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2) DIMENSIONS, LAYOUTS AND SUPPORTING OF 1.5" AND BELOW ARE INDICATVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT THE JOB SITE BEFORE FABRICATION / ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
1S3 05/01/2023 AS - BUILT MARK UP 1S2 31/12/2022 AS - BUILT MARK UP 1S1 27/12/2022 AS-BUILT MARK UP DRAWING
NO ISO of S3
S2
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara Technip Energies, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

3B M1
3B M1
3B M1

M1 1S3

1S3

M1

M1 BOLT LIST
BOLT SIZE LENGTH
No (IN) (MM)
Phan Van Thai
2023.01.05
1S3 10:45:49 +07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


REASON FOR MODIFICATIONS BY SUBCONTRACTOR: SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
CUT AND REWELD DUE FIELD FABRICATION ERROR WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2) DIMENSIONS, LAYOUTS AND SUPPORTING OF 1.5" AND BELOW ARE INDICATVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT THE JOB SITE BEFORE FABRICATION / ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
1S3 05/01/2023 AS - BUILT MARK UP 1S2 31/12/2022 AS - BUILT MARK UP 1S1 27/12/2022 AS-BUILT MARK UP DRAWING
NO ISO of S3
S2
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara Technip Energies, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

1B 103 1/2 THD F

1S3

1S3

103

BOLT LIST
BOLT SIZE LENGTH
No (IN) (MM)
Phan Van Thai
2023.01.05
10:45:59 +07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


REASON FOR MODIFICATIONS BY SUBCONTRACTOR: SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
ADDING NEW JOINT WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2) DIMENSIONS, LAYOUTS AND SUPPORTING OF 1.5" AND BELOW ARE INDICATVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT THE JOB SITE BEFORE FABRICATION / ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
1S3 05/01/2023 AS - BUILT MARK UP 1S2 31/12/2022 AS - BUILT MARK UP 1S1 27/12/2022 AS-BUILT MARK UP DRAWING
NO ISO of S3
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara Technip Energies, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia

You might also like