You are on page 1of 11

Mobile No: +919930686477

E-Mail: utsav.b100@gmail.com

UTSAV BAKSHI

Experience Summary
 SAP Basis Consultant with 11 years 11 months of experience in SAP Implementation,
Support, OS/DB Migration and Upgrade projects currently working for DXC.
 Extensively worked on R/3, NetWeaver products with experience on following databases
and operating systems: -
Database: Oracle, DB2, MS SQL, Sybase, HANA
Operating systems: AIX, HP-UX, LINUX and Windows operating systems
 Experience in SAP implementation, OS/DB migration (Classical Migration as well as
DMO), upgrade and support which includes administering SAP Applications in
ABAP/JAVA stack, administration across SAP Business Suite, SAP Basis, Portal and
NetWeaver.
 Target oriented work and keenness to learn & try new technologies.
 Ability to work collaboratively and commitment in achieving corporate goals.
 Good at interpersonal communication skill.
 Good analytical skills and problem-solving abilities
 Companies I have Worked for:

Company Name Start Date End Date


DXC Technology 19/06/2022 Till Date
Wipro Ltd 30/06/2021 01/07/2022
Capgemini Technology Services 15/10/2019 07/06/2021
L&T InfoTech Ltd 2/5/2016 30/08/2019
Solysnch Technologies Pvt Ltd 1/4/2014 30/04/2016
Coconut Softwares Pvt Ltd 1/12/2010 29/03/2014

Skills Summary
Domain Pharma , Manufacturing, Automotive , Textile ,Utilities
Programming Languages ABAP
Operating System / ERP Version WINDOWS , RHEL LINUX , HPUX ,AIX / ECC 6.0,
Tools / DB / Packages / Framework / ORACLE, DB2, MS-SQL, SYBASE, MAXDB,
ERP Components HANA2.0/ SAP NETWEAVER BI ,PORTAL,
Hardware Platforms X86 , PPC

Page 1 of 1
Mobile No: +919930686477
E-Mail: utsav.b100@gmail.com

UTSAV BAKSHI

Work Experience
Project 1
Project Name EDW OCRM Project Team Size 6
Start Date July 2022 End Date Till Date

Project Description IDBI Bank Project

Role: SAP BASIS ADMIN


Contributions:
 Created PRE-PROD System for CRM Marketing Module
Role & Contribution Go-Live
 Involved in DR Drill Planning , Execution and Testing
 Day to Day monitoring of CRM & Fiori Systems
 Also involved in Support Activities
Technology & Tools SAP CRM EHP4, NW Fiori 7,50 System , Web Dispatcher

Work Experience
Project 2
Project Name TPCL Support Project Team Size 6
Start Date June 2021 End Date Till Date

Project Description Tata Power Basis Support Project


Role & Contribution Role: Basis Team Lead L3 Consultant:
Contributions:
 Managing a Team of 6 Basis Consultants
 Guiding and mentoring the team for handling P2 and P3
Tickets. Also Solving Performance issues in any of the
systems or alerts
 Creating detailed Plan for all Basis Tasks and sharing it
with Customer.
 Leading/tracking all day to day activities, special projects
activities that the customer has requested
 Customer Handling and SPOC for all BASIS Activities
 Interacting and coordinating with Different Teams i.e
Page 2 of 2
Mobile No: +919930686477
E-Mail: utsav.b100@gmail.com

UTSAV BAKSHI

N/W, Storage, Server team as well as different Vendor


Teams in case of dependency
 DR Drill Planning and leading the execution for the same
Technology & Tools ECC6 EHP7, N/W CRM 7.4, HANA 2.0, NW 7.5 ABAP and
JAVA, ,

Work Experience
Project 3
CCAS Automation
Project Name Team Size 6
Project
Start Date October 2020 End Date March 2021

Leading a Team for Automating of different SAP Tasks i.e


Project Description Installation/System Copy/System Refresh etc. on different Cloud
Platforms

Role: Basis Consultant Team Lead responsible for


Contributions:
 Planning and Building the infra required for Testing of
the Automation Code
 Doing POC’s and Building the Logic required for writing
the Code
 Testing the steps manually before explaining the steps to
Role & Contribution the developer
 Work with Team to Developers who write the code and
see to it that correct logic is being written.
 Leading/tracking the team to Basis
Consultants/Developers/Infra who are writing the code as
well as building Cloud Infra
 Preparing Test Cases for Testing the Script
 Writing Scripts for DB Restore (Sybase/HANA)
Technology & Tools SAP4 HANA 1709, ECC EHP8, Sybase 16.0 SP03, HANA 2.0,
NW 7.5 ABAP and JAVA, Terraform, Jenkins,

Page 3 of 3
Mobile No: +919930686477
E-Mail: utsav.b100@gmail.com

UTSAV BAKSHI

Work Experience
Project 4
BURBERRY UK AMS
Project Name Support/Cloud Migration Team Size 16
Project
Start Date Feb 2020 End Date September 2020

Multi Year AMS Support Project for Burberry as well as Cloud


Project Description Migration Project from SAP HANA Enterprise Cloud(PAAS) to
AWS Cloud Platform(IAAS)

Role: Senior Basis Consultant responsible for


Contributions:
 BASIS Incidents resolutions of all the ticket that have
been logged
 SAP Systems are in HEC, so basis team only responsible
for application level issues.
 BASIS Support in ongoing projects.
 Part of Cloud Migration Project from SAP HEC to AWS
Cloud Migration
Role & Contribution
 Install Native HANA Systems (1.0 SPS12) on AWS
Platform both as a single HANA and as a HA System
 Setup HANA HA Cluster (2 nodes) on AWS using
overlay IP
 Choosing replicate and go-live approach in which
systems are replicated from HEC to AWS Hyperscalar
 HANA SDA connections Setup with Hybris and
Databricks (3rd Party Tools)
 Backup Configuration using AWS Backint for HANA
Technology & Tools SAP S/4 HANA 1809,SAP BW NW 7.4,HANA 1.0
SPS12,HANA 2.0 SPS04

Work Experience
Project 5

Page 4 of 4
Mobile No: +919930686477
E-Mail: utsav.b100@gmail.com

UTSAV BAKSHI

Project Name NATS UK AMS Support Team Size 4


Start Date October 2019 End Date January 2020
Project Description Multi Year AMS Support Project for Client NATS

Role: Basis Consultant responsible for


Contributions:
 BASIS Incidents resolution as per SLA
Role & Contribution
 ECC/BW/EP System refresh activities
 Yearly SAP Support Pack Stack updates for ABAP as
well as JAVA systems
Technology & Tools SAP ECC 6.0 EHP4,SAP NETWEAVER 7.5,MS SQL 2012 R2

Work Experience
Project 6
Project Name GENRE AMS Support Team Size 9
Start Date March 2019 End Date Till Date
New AMS Project for LTI which included Multiple Year AMS
Project Description
Support as well as Hana Migration to be done on Azure

Role: Basis Consultant responsible for


Contributions:
 Lead Basis AMS Team starting from Transition (KT,
Shadow and Reverse Shadow)
Role & Contribution  BASIS SME(BASIS/CPS) during the entire shadowing
phase
 Ensuring error free execution of basis tasks after entering
the actual support phase
 Attending BASIS Operations meeting from BASIS Team
Technology & Tools SAP ECC 6.0 EHP4,SAP NETWEAVER 7.4,ORACLE 12.2.0.4

Work Experience

Page 5 of 5
Mobile No: +919930686477
E-Mail: utsav.b100@gmail.com

UTSAV BAKSHI

Project 7
Project Name PROJECT SUHANA 2.0 Team Size 8
Start Date August 2018 End Date Feb 2019
Project for Conversion to SAP HANA for all the L&T Group
Project Description
Companies.

Role: Basis Consultant responsible for


Contributions:
LTPC ECC Landscape
 Preparing Sandbox ECC System by copying the existing
Production System.
 Performing HANA Pre-checks on the parallel system,
running benchmarking tool of SUM (1st 10% of the
tables, then full database) for fast check for possible
migration speed prior to the DMO run.
 Running actual SUM with DMO option based upon the
benchmarking tool results to migrate the ECC Systems to
“SAP Business Suite on HANA”
 SUM with DMO option to upgrade as well migrate from
Oracle to HANA 2.0 database
 Similarly doing Migration with DMO for DEV, QA and
Role & Contribution
PROD ECC Systems by first creating Parallel Landscape
and then running SUM with DMO for Upgrade as well as
database migration.
 HANA 2.0 Database is created with Multitenancy for all
the LNT IC’s.
 All the Windows Systems (Original as well as parallel
Systems) are VM’s with O.S windows 2012 R2.
CRISP Landscape
 Performed OS/DB Migration (Classical Migration) for
all the Systems in CRISP Landscape (ECC/Portal/PI)
which were both Single as well as HA Systems
(Windows MSCS Cluster).
 Migrated all the systems from Oracle 12c Database to
Sybase 16.0 SP03.
 Preparing Installation Documents for the Project

Page 6 of 6
Mobile No: +919930686477
E-Mail: utsav.b100@gmail.com

UTSAV BAKSHI

Technology & Tools SAP ECC 6.0 EHP7,SWPM,SUM,SYBASE 16.0 SP03

Work Experience
Project 8
Project Name CICP(INDIAN ARMY) Team Size 7
Start Date SEPTEMBER 2017 End Date JULY 2018
INDIAN ARMY SAP Greenfield Implementation Project for
Project Description
which whole SAP Landscape needs to be build

Role: Basis Consultant responsible for building


Contributions:
 Installing SAP Systems(ECC/BW/EP/PO/BOBJ) as part
of Solution Building for Indian Army
Role & Contribution
 Performing Support activities as part of Implementation
Project
 Preparing SAP BASIS specific User Manuals and SOP
Documents
Technology & Tools SAP R/3, SAP NetWeaver 7.5 , SWPM,DB2 LUW 11.1 FP1

Work Experience
Project 9
Project Name ILMS(INDIAN NAVY) Team Size 7
SEPTEMBER
Start Date MAY 2017 End Date
2017
INDIAN NAVY SAP Greenfield Implementation Project for
Project Description
which whole SAP Landscape needs to be build
Role & Contribution Role: Basis Consultant responsible for Client co-ordination,
Solution building and Documentation

Contributions:
 Build Solution for DR Setup as per requirement from

Page 7 of 7
Mobile No: +919930686477
E-Mail: utsav.b100@gmail.com

UTSAV BAKSHI

Indian Navy
 Successfully done POC of Disaster Recovery solution
after which the solution was accepted by the client
 Performing day to day support activities as part of SAP
BASIS Team
 Taking requirements, attending meetings from SAP
BASIS Side
Technology & Tools SAP R/3, SAP NetWeaver 7.4 ,SWPM,DB2 LUW 10.5

Work Experience
Project 10
JOHNSON AND
Project Name Team Size 7
JOHNSON
Start Date MAY 2016 End Date MAY 2017
The scope of this project was to Migrate LYNX and Consumer
Project Description Landscape containing Physical servers to Virtual Servers (SDDC
Landscape)

Role: Basis Consultant for OS/DB Migration


Contributions:
 Servers Provisioning of New VM Servers
Role &
Contribution  Shell Build (Fresh Installation) of all the SAP Systems
 Performing OS/DB Migration using Parallel Export Method
 Support of Systems Post Migration after handing over the
system to business.
Technology & SAP R/3, SAP NetWeaver 7.3 EHP1 , SWPM,VMWARE Tools
Tools

Work Experience
Project 11
Connectwell Upgrade and
Project Name Team Size 4
Migration Project
Start Date October 2015 End Date April 2016

Page 8 of 8
Mobile No: +919930686477
E-Mail: utsav.b100@gmail.com

UTSAV BAKSHI

The scope of the project was to perform Upgradation of all the SAP
Project Description Product(ERP) Servers and well as migrating all the servers to New
Windows VM’s(Virtual Machines)

Role: Basis Consultant Responsible for Migration as well as Upgrade


Contributions:
 Installation of Solution Manager 7.1 and Configuration of
MOPZ.
 Source Environment: ECC5 SR1, MS SQL 2005, Windows
2003 R2 Standard
 Target Environment: EHP7 SR1, MS SQL 2008 R2, Windows
2008 R2 Standard It was a 2 step upgrade i.e. ECC5 SR1 to
Role &
ECC6 EHP5 and then from ECC6 EHP5 to ECC6 EHP7
Contribution
 Created New MOC System and upgraded it from ECC5 SR1 to
EHP7 SR1.
 Upgraded Development, Quality and Production System in
same way from ECC5 SR1 to EHP7 SR1
 Migrated Development, Quality and Production system from
Old Virtual Machines to New Virtual Machines.
 Migration was done through Homogenous System Copy
(Export-Import) method.
Technology & SAP ECC6 EHP7,SWPM,VMWARE Tools
Tools

Work Experience
Project 12
Project Name Rallis India Onsite Support Team Size 3
Start Date January 2014 End Date September 2015
Project Description The scope of this Project is to provide SAP BASIS support onsite.

Page 9 of 9
Mobile No: +919930686477
E-Mail: utsav.b100@gmail.com

UTSAV BAKSHI

Role: Basis Consultant for SAP BASIS Support


Contributions:
 Send Daily Health Check report to I.T manager regarding
performance.
 Provide missing authorizations to Users, transport change
Role & requests across the SAP Landscape when a ticket is raised in
Contribution Rallis Workflow.
 Ensure database backups are happening regularly.
 Giving support as and when required to Rallis Functional
Teams.
 Solving performance issues as and when it comes.
 Perform system refresh from production to quality system.
 Monitoring Users, Application servers and Background Jobs

Technology & SAP ECC 6.0, SAP NetWeaver 7.0


Tools

Project 13

Pinnacle Implementation 2
Project Name Team Size
Project

Start Date May 2013 End Date December 2013


The scope of the project was to perform a fresh installation of all the SAP
Project Systems (DEV, QA and PROD) as needed by the client.
Description

Role & Role : Basis Consultant for SAP BASIS Implementation


Contribution
Contributions:
 Installation of Solution Manager 7.1 SR1 on Windows Server
2008 R2 with Database as Sybase 15.7.0.101
 Installed Development and Production System as Central System
on Windows 2008 R2 with database as Sybase 15.7.0.101
 Performed post installation steps for all the installed systems.
 Performed local as well as remote client copies.
 Transported change requests to production server before
production go-live.

Page 10 of 10
Mobile No: +919930686477
E-Mail: utsav.b100@gmail.com

UTSAV BAKSHI

 Created New users in the system according to SAP User license


Agreement.
Technology & SAP R/3, ECC , Solution Manager, SWPM
Tools

Educational Qualification
Education & Credentials Completed Bachelor of Engineering in 2010 from Mumbai
University

Page 11 of 11

You might also like