a
TRIPA
-Membertan yang terbalk
No. c00686/DN/10/02119 CONTRIBUTION NOTE
Ta: 23 Februagi.2019
1001551900002
111001851800001
Nama & Alamat Peserta PT JASA MEDIVEST (M01EJ00018)
Name & Address of Participant JL. CICENDO NO.19 BANDUNG
Janka Waktu 28/02/2019 - 23/02/2020 denis Asuransi INDUSTRIAL ALL RISK
Period Type of Insurance SHARIA
- tatan | Notes Perincian / Details
{flease pay the amount shown in this Contribution Note immediately o finalize | Kontribusi_ IDR 197,067,986.12
the transaction. Payment should be made with a crossed cheque in the name | Contribution - -
Te RRANSITR! PAKARTA or transfered o our current account with one of | origi Nat = IDR |
the following bank :
~ BNI SYARIAH FATMAWATI Ace. No, 0081839499
Instatimont
fst 26/03/2019 1DR,
sed 25/0572019 10K
| Please nde te Foley no or Note one message coun onthe tans ip, shoul payment be
‘made using bank vanstor
|
Note Kortribusinbukan merigakantnda buts pembayaca,
‘Ths Contibuton Note snot» rece.
134,402,846.25 2nd 26/04/2019 OR
34341,846.25 ath 25/06/2019 IDR
197,367,386.12
‘Not Contibution
Biaya Polis: IDR 5,000.00,
Policy Cost
Blaya Materal ; IDR 6,000.00
Duty Cost
“re oR (0.12)
| Jumian IR | 137,428,385,00
Total |
34,941 806.25
34,301,846.25 |
PT. ASURANS! TRI PAKARTA
preci
(sear semana 2600128482597
wo
PT ASURANSITRI AKA
ATOR GABANG SYARIA, JL FALATENAN INO, 1-18 Kan cePOLIS ASURANSI SYARIAH
KEBAKARAN INDONESIA
ios
oy be
“Tarn
Memberikan y
ae
PT ASURANS! TRI PAKARTA
ee
ee a
. .
el -TRIPA
No Polis
Policy Number
Nama Tertangaung
Insured Name
Alamat Tertangqung
‘Address of the Insured
Jangka Waktu Pertangoungan
Period of insured
Kelas Konstruks
Construction Class
Kode Okupasi
Occupation
Lokasi Risiko
Risk Location
Jaminan
Coverage
Harga Pertangaungan
‘Sum Insured
IKHTISAR PERTANGGUNGAN
POLICY SCHEDULE
INDUSTRIAL ALL RISK SHARIA
41001581900001 RENEWAL
PTJASA MEDIVEST
UL. NANAS NO.43 BANDUNG
BANDUNG - 40114 JAWA BARAT
Muli dari tanggal 23 Februari 2019 sampai dengan 23 Februari 2020 , kedua
‘tanggal tersebut pada pukul 12.00 siang waktu setempat dimana harta benda
yang dipertanggungkan berada
Commencing from February 23, 2019 To February 23, 2020 both days at 12
O'clock noon, local tine at the location of the insured property,
Class |
Other Chemical and Physical Treatments, Washing, Desaliniating
esis)
JL. INTERCHANGE DAWUAN DESA DAWUAN TENGAH KEG
CIKAMPEK KAB. KARAWANG JAWA BARAT 41958
Jaminan Utama
others
+ Industrial All Risk (Exclude Business Interruption and Earthquake, Volcanic
Eruption & Tsunami, Typhoon, Storm, Floed & Water Damage/4 3A)
- Fire, Lightning, Explosion, Aircraft Impact ané Smoke (FLEXAS)
- Riots, Sikes & Malicious Damage plus Cull Commotion (RSMOCC)
SECTION | - Material / Property Damage
Covering unforseen physical los dasinction of of damage to Property
of the insured or for which heihis legally leble as spectied Inthe
schedule
BANGUNAN IDR 5,985,940,000.00
‘SARANA PELENGKAP IDR 381,640,000.00
= PERALATAN PABRIK IDR 329,090,000.00
= PERALATAN KANTOR 1DR __232,870,000.00
- MESIN DAN PERALATAN, IDR 78,095,030,000.00
‘Total Harga Pertanggungan JOR 86,004,570,000.00ts nes teen
‘sete taming par Pay Ne
Klausule
Clauses
ee
~ ALL OTHER CONTENTS CLAUSE ( PAR ) (|DR 50,000,000.- in aggregate)
ALTERATIONS CLAUSE (1AR )
APPRAISEMENT CLAUSE (6% of sum insured)
ARCHITECTS, SURVEYORS AND CONSULTING ENGINEERS EXPENSES.
CLAUSE (10% OF TS! ANYONE LOCATION)
AUTOMATIC REINSTATEMENT OF SUM INSURED CLAUSE (SUBJECT
TO ADDITIONAL PREMIUM)
AVERAGE RELIEF CLAUSE (85%)
AWNINGS BLINDS SIGNS OR OTHER OUTOOOR FITTINGS OF EVERY
DESCRIPTION CLAUSE (Max Rp. 10,000,000.00)
BANKERS CLAUSE PT BANK SYARIAH MANDIR
BRAND AND LABEL CLAUSE
BURST PIPES ENDORSEMENT
+ CAPITAL ADDITIONS (10% of TS!)
CIVIL AUTHORITIES CLAUSE
CLAIM PREPARATION CLAUSE
‘COMPUTER RECORDS CLAUSE
CONTRACT PRICE CLAUSE.
COST OF RE-ERECTION CLAUSE
(COST OF RE-WRITING RECORDS AND CLAIMS PREPARATION CLAUSE
CYBER AGGREGATION CLAUSE - NMA 2015
DEFERRED PREMIUM CLAUSE
~ DEFINITION CLAUSE
DESIGNATION CLAUSE(S)
DISPUTE CLAUSE (Syariah)
EARTHQUAKE EXCLUSION CLAUSE
ELECTRONIC DATE RECOGNITION EXCLUSION CLAUSE (A)
EMPLOYEES PERSONAL EFFECTS CLAUSE
ERRORS AND OMISSION CLAUSE
- ESCALATION CLAUSE (15%)
EXPEDITING EXPENSES CLAUSE (10% OF LOSS)
EXTRA CONTRACTUAL OBLIGATION EXCLUSION CLAUSE
FIRE BRIGADES CHARGES (max IDR 100,000,000)
FIRE EXTINGUISHING COST CLAUSE (max IDR 100,000,000)
GENERAL INTEREST CLAUSE
IMPACT BY OWN VEHICLES CLAUSE
INDUSTRIES, SEEPAGE, POLLUTION AND CONTAMINATION
EXCLUSION CLAUSE ( NMA 1685 )
INFORMATION TECHNOLOGY HAZARD CLARIFICATION CLAUSE (NMA
2912)
INTERNAL REMOVAL CLAUSE
KLAUSULA WAKALAH BIL LURAH
LOSS NOTIFICATION CLAUSE (30 DAYS)
LOSS OF DAMAGED GOODS CLAUSETRIPA
Morborsan yang ter
man staan sito
Konsisi
Condition
eae
MINOR ALTERATIONS AND REPAIRS CLAUSE
MISDESCRIPTION CLAUSE
NON-INVALIDATION CLAUSE
~ NOTICE OF CANCELLATION CLAUSE (30 DAYS EXCEPT FOR. 1A*CC3
DAYS)
NUCLEAR ENERGY EXCLUSION CLAUSE 1994 - NMA 1975 (A) (
WORLDWIDE EXCLUDING USA AND CANADA)
OCCUPATION AND /OR ILLICIT OBJECT CLAUSE,
OUTBUILDINGS CLAUSE
PAIR AND SET CLAUSE
PAYMENT ON ACCOUNT CLAUSE
PROFESIONAL FEES CLAUSE
PROPERTY DAMAGE CLARIFICATION CLAUSE
PRORATA RETURN OF PREMIUM CLAUSE
PUBLIC AUTHORITIES CLAUSE
REINSTATEMENT VALUE CLAUSE
REMOVAL OF DEBRIS CLAUSE (10% of Sum Insured inal. In TS!)
REPLACEMENT VALUE CLAUSE.
RIOTS, STRIKES, MALICIOUS DAMAGE AND CIVIL COMMOTIONS
ENDORSEMENT (Code : 4.18 / 2007)
SANCTION LIMITATION AND EXCLUSION CLAUSE - JW2010/004
SELLING PRICE CLAUSE
- SERVICES CLAUSE
SMOKE AND VEHICLE IMPACT ENDORSEMENT (CODE : 4.11 -
o1/i2/199a)
‘SPRINKLER LEAKAGE CLAUSE (IF APPLICABLE)
‘STRUCTURAL ALTERATION CLAUSE.
- TEMPORARY REMOVAL CLAUSE
‘TERRORISM EXCLUSION CLAUSE (NMA 2920)
‘THEFT ENDORSEMENT (FORCIBLE ENTRY)
- TOTAL ASBESTOS EXCLUSION
TRANSMISSION AND DISTRIBUTION LINES EXCLUSION CLAUSE
VEHICLE IMPACT CLAUSE
WAIVER CLAUSE
WAIVER OF SUBROGATION CLAUSE
WAR AND CIVIL WAR EXCLUSION CLAUSE
WORKMENS CLAUSE
= Warranty sufficient and working FEA devices - Warranted 24 hours
security guards - Warranty safety measures in respect of theft risk -
Warranty all machineries are well maintained according to SOP - Not
Silent Risk - Detail Mesin bukan buatan Chinaa
“TRIPA
omen yang tera
esiko Sendiri
Deductible
Rate of Premium
Perhitungan Premi
Premium Caleulstion
alls ini metupakan perpaniang
+ Riots, Stikes and Malicious Damage (RSMD) : 10 % of Claim minimum
IDR 10,000,000.00 for any one accident
+ Others/Theft/Accidental Damage : IDR 2.600,000.00 for any one accident
~ Fite, Lightning, Explosion, Aircratt Impact and Smoke (FLEXAS) 0.1 % of
TSI oF 10 % of Claim (whichever is higher)
+ Civil Commotion : 10 % of Claim minimum ; IDR 10,000,000.00 for any
‘one accident
Riots, Strikes & Malicious Damage plus
Givil Commotion (RSMDCC)
Fire, Lightning, Explosion, Aircraft Impact
‘and Smoke (FLEXAS)
Others
IDR 85,004,570,000.00 x
0.00100000%e
IDR 85,004,570,000.00 x
0.00100000%.
IDR 85,004,570,000,00 x
1.61400000%.
Policy Cost
‘Stamp Duty
Total Premi
isn 11001551800001
‘This Policy is issued in renewal with Policy number(s)
tea. ste weuastn tpi o Parsoag.n
‘ness wo be Unsere bang ay satay Te ince sd onl hs Easoe ba fal ea
or
IDR
1oR,
oR
1oR
(0.00100
1.61400 %e
0.00100 te
185,004.57,
85,004.57
137,197,376.98
55,000.00,
6,000.00“~~ TRIPA
{inspotes etemng part ay Ne
JAKARTA, 23 Februari 2019
PT. ASURANS! TRI PAKARTA
BEAWATERA NS
Ro. 0000,
——
Pr ASURANSITRIPAKARTA
AWTOR CABANG SWARUN, JL FALATEKAN NO 1718 AKA edean aso
TRIPA
so suaote nn sossssna)
Detail Sum Insured:
No. Deskripsi unt] Hergafunit Harga Pertanggungan
1] BANGUNAN + | 4,137,270,0000 OR 4.187,270,000 60
a
2| LOADING Bay 1] 813,870,000.00 | 1oR 613,870,000.00,
3) MESS KARYAWAN 1] 149,280,000.00 | 1oR 149,230 000.00
4] RUMAH POMPA 1] 9,030,000.00 } 10 9,030,000.00
5] 7PS LIMBAH 83 1] 30,470,000.00 | 10 30,470,000.00
5] GUDANG LIMBAH 83 1 | 123,420,000 00 | 1oR 123.420,000.00
7| GUDANG LIMBAH Ba 1 | 176,760,000.00 | IDR 175,760,000.00
8) BANGUNAN TEMPaT CuCl 1] 82,700,000.00 | 10 82,700,000.00
8] BANGUNAN TRAFO. 4] 54,280,000.00 }10R '54,280,000.00
10] Pos uaca, 1] 24,380,000.00 J 108 224,380,000.00
11] KANTOR 4] 442,710,000.00 | 10R 442,710,000.00
12] BANGUNAN UTILITAS DAN WORKSHOP 1] 90,710,000.00 | 10R 90,710,000.00
13] BANGUNAN TANGK! SOLAR 1] 32,110,000.00 | oR 32,110,000.09,
TOTAL IDR 5,865,940,000.00
No. Deskripsi um] Hargafunit Harga Pertanggungan
7] INCENERATOR PLANT. 1 | 30,363,700,000,10R——-30,363,700, 000.00
00
2) GENERATOR SET +] 424,370,000.00 | 10 424,370,000.00
3] SCREW AIR COMPRESSOR 1} 130,920,000 .00 | 1oR 130,920,000.00
4) AiR DRYER 11] 12,660,000.00 | 10 12,650,000,00
5| PRESSURE TANK 1] 7,180,000.00 | 10R 7,190,000.00
6] TANGKI SOLAR 1] 40,700,000.00 | oR 40,700,000.00
7| TANGKIAIR 4] 99,820,000.00 | 10, #9,820,000.00
| FIRE EXTINGULER 4] 36,480,000 00 | 10 36 480,000.00
9] TIMBANGAN DIGITAL, 1 | 12,280,000.00 | 10 12,280,000.00
10] INSTALASI AIR 8ERSIH 1] 208,150,000.00 } 10 208,150,000.00
11] INCENERATOR PLANT (BARU) 1 | 46,488,860,000,|10R ———_45.488,650,000.00
00
12] SCREW AIR COMPRESSOR 4] 287,980,000.00 | 1oR 287,990,000.00
16] JEMBATAN TIMBANG 1,| 982,130,000.00 | 10 1282,130,000,00
TOTAL IDR 78,095,030,000.00