You are on page 1of 2
aaa tare TTR ‘GOVERNHIENT OF INDIA From Goctecaiotvern — | ghar —Aanforfiem —| CENTRAL PUBLIC WORKS * ‘nea ries atic DEPARTIENT, i Bermosonosess [BMEET ame mele | enieseome | fad moimrocb, ENGINEER, — son, desert, [maxes & ares, hart | esrvsHecL Mutiplex Comes, | Suber. cheat exon}, Te, Fae 500020 (FHEH | Oppo tone br tnd, Cob Bar ow denne ome,” basa) Road, HUBLI-580030, Reewier de, na, 258030, framing ey (wameAs9 0% [PAT 0836 2232009 email: hubeshed.cpwd@sov.in / cpwdi44002@yahoo.co.in No:69(1)/EE/HUBLI/2022-23/ (9 |@ we - Date : 02.01.2023 CORRIGENDUM / ADDENDUM - 1 Name of work : Construction of ‘A’ Type Schoo! Building and 9 Nos. Staff Quarters (4 Nos. Type- 114 Nos. Type-III and 1 No. Type-V) for Kendriya Vidyalaya at Sadalaga, Chikodi Taluk, Dist. Belagavi, Karnataka, SH: Building portion including internal water supply, sanitary installations, drainage development and bulk services internal electrical installations and fans lighting conductor earthing fire fighting with down ‘comer system including fire extinguisher etc. Ref This office Itr No. No.69(1)/EE/Hubli/2022-23/1002 (H) Date : 21.12.2022. NIT No, + 23/Hubli/SE/EE/e-Tender/ 2022-23 ‘The following modification/ Additions are made in the tender document for the above work. | Sl.No] Page No. | As existing To be read as 1 24 ‘Clause 10 CA- Applicable. ‘Not applicable | (As this clause was deleted vide | Gircular No. DG/CON- ‘Construction-2020/336 Dated 22.12.2022 and same is | merged in the clause 10¢C) 2 5 ‘Clause 10 CC- Applicable Schedule of component of other | 10 CC Applicable and materials, Labour etc. for price | percentage of relevant | escalation ‘component of material/labour | [Component OF GM) | for calculation of price oe” 40% | | £Scalation is given in the Table | covered under clause aS 10CA expressed as Percent of total value of civil work. Component of Labour | 25% expressed as percent | of total value of the work | [ Component of Pol NIL 3 121 (Part | Clause 10 CC- Applicable c Schedule of component of other | 10 CC Applicable and Electrical) | materials, Labour etc. for price | percentage of relevant escalation. component of materiaitabour for calculation of price ‘Component of escalation is given in the Table | Electrical: Xm 80% | | 2 attached. | Component of Labour: | 20% | y 4 216 | Unit against item No.11.5 not ‘Cum - mentioned. Table 1 |Sl.No. | Relevant Component of Material / Labour for | Percentage of total value price escalation. of work of Civil L Component. _| 1 Component of Cement 10% 2 Component of Labour for CIVIL works 25% . il f 3. Civil Component of other Construction Materials a 4 | Component of POL (Diesel) NI | Reinforcement Steel bars / TMT bars / Structural Steel (including strands and cables) /c CRS | Steel. 15% 6 Component of Bitumen - Total ~ 100% Table 2 SI. No. Relevant Component of Material / Labour etc. | Percentage of total value | for price escalation. of work of Electrical Component. | 1 Component of Labour for E&M works amie a Electrical and Mechanical (E&M) Component of Construction Materials 80% _| Total 100% Due to Administrative Reasons the date of submission and opening of bid is postponed to 07.01.2023 at 15.00 Hrs for submission and 15.30 Hrs for opening instead of 04.01.2023, Allother terms and conditions of the NIT remain unaltered. ew — LL — 02) 01 cordureres sifirat 7 EXECUTIVE alae 8 &.c1.F.{. geet / CPwD, HUBLI.

You might also like