No:69(1)/EE/HUBLI/2022-23/ (9 |@ we - Date : 02.01.2023
CORRIGENDUM / ADDENDUM - 1
Name of work : Construction of ‘A’ Type Schoo! Building and 9 Nos. Staff Quarters (4 Nos. Type-
114 Nos. Type-III and 1 No. Type-V) for Kendriya Vidyalaya at Sadalaga, Chikodi
Taluk, Dist. Belagavi, Karnataka, SH: Building portion including internal water
supply, sanitary installations, drainage development and bulk services internal
electrical installations and fans lighting conductor earthing fire fighting with down
‘comer system including fire extinguisher etc.
Ref This office Itr No. No.69(1)/EE/Hubli/2022-23/1002 (H) Date : 21.12.2022.
NIT No, + 23/Hubli/SE/EE/e-Tender/ 2022-23
‘The following modification/ Additions are made in the tender document for the above work.
| Sl.No] Page No. | As existing To be read as
1 24 ‘Clause 10 CA- Applicable. ‘Not applicable |
(As this clause was deleted vide |
Gircular No. DG/CON-
‘Construction-2020/336 Dated
22.12.2022 and same is
| merged in the clause 10¢C)
2 5 ‘Clause 10 CC- Applicable
Schedule of component of other | 10 CC Applicable and
materials, Labour etc. for price | percentage of relevant
| escalation ‘component of material/labour
| [Component OF GM) | for calculation of price
oe” 40% | | £Scalation is given in the Table
| covered under clause aS
10CA expressed as
Percent of total value
of civil work.
Component of Labour | 25%
expressed as percent |
of total value of the
work
| [ Component of Pol NIL3 121 (Part | Clause 10 CC- Applicable
c Schedule of component of other | 10 CC Applicable and
Electrical) | materials, Labour etc. for price | percentage of relevant
escalation. component of materiaitabour
for calculation of price
‘Component of escalation is given in the Table
| Electrical: Xm 80% | | 2 attached. |
Component of Labour: | 20% |
y
4 216 | Unit against item No.11.5 not ‘Cum
- mentioned.
Table 1
|Sl.No. | Relevant Component of Material / Labour for | Percentage of total value
price escalation. of work of Civil
L Component. _|
1 Component of Cement 10%
2 Component of Labour for CIVIL works
25%
. il f
3. Civil Component of other Construction Materials a
4 | Component of POL (Diesel) NI |
Reinforcement Steel bars / TMT bars / Structural
Steel (including strands and cables) /c CRS |
Steel. 15%
6 Component of Bitumen
- Total ~ 100%
Table 2
SI. No. Relevant Component of Material / Labour etc. | Percentage of total value |
for price escalation. of work of Electrical
Component. |
1 Component of Labour for E&M works amie
a Electrical and Mechanical (E&M) Component of
Construction Materials 80% _|
Total 100%
Due to Administrative Reasons the date of submission and opening of bid is
postponed to 07.01.2023 at 15.00 Hrs for submission and 15.30 Hrs for opening
instead of 04.01.2023,
Allother terms and conditions of the NIT remain unaltered.
ew — LL — 02) 01
cordureres sifirat 7 EXECUTIVE alae 8
&.c1.F.{. geet / CPwD, HUBLI.