GUIDELINES & ASSESSMENT
PART TWO: GSAS-CM CATEGORIES — GUIDELINES & ASSESSMENT
GSAS Construction Management framework consists of eight categories each associated with a
specific environmental aspect having potential environmental impact/s, The table below lists all
categories and their associated criteria,
URBAN CONSIDERATIONS 7.00%
UC.1 Traffic and Transportation Management 2.50%
UC.2 Sewer and Waterway Contamination 2.50%
UC.3 Reclamation and Dredging 2.00%
S SITE 15.00%
$1 Land Preservation 3.00%
S2 Habitat Preservation 2.00%
$3 Erosion and Sediment Control 2.00%
5.4 Soil and Earthworks Control 3.00%
S5 Groundwater and Dewatering Control 5.00%
E ENERGY 16.00% 3.00%
E1 Energy Management 10.00% 1.50%
E2 Overall CO, Emissions 6.00% 1.50%
W WATER 14.00% 2.00%
W.1 Domestic Water Management 6.00% 1.00%
W2 —_ Non-domestic Water Management 8.00% 1.00%
M MATERIALS 13.00%
M1 Materials Reuse 4.00%
M2 — Recycled Materials 6.00%
M3 Materials Recovery 3.00%
{5AS Construction Management: Guidelines & Assessment 2017 - v2.1 -Issue 3.0 PAGE 20GUIDELINES & ASSESSMENT
OE
OE
06.2
0&3
OE4
sD
sD
SD.2
Mo
Mo.
MO.2
MO.3
M04
OUTDOOR ENVIRONMENT
Dust Control
Noise and Vibration Control
Light Pollution and Visual Impact Control
Odor and VOe's Emissions Control
‘SOCIO-CULTURAL DIMENSION
Protection of Archaeological Sites
Socio-Cultural Interaction
MANAGEMENT AND OPERATIONS.
Waste Management
Welfare Facilities
Construction Health and Safety
Workers’ Accommodation
16.00%
7.00%
5.00%
2.00%
2.00%
5.00%
2.00%
3.00%
16.00%
6.00%
3.00%
3.00%
2.00%
2.00%
2.00%
4.00%
GSAS Construction Management: Guidelines & Assessment 2017 - v2.1 -Issue 3.0