Badr University in Cairo (BUC) Frist Semester

Faculty of Engineering and Technology 2022 – 2023


Operating Systems
Eng. Doaa Hamdi

1- Consider three processes P1 , P2 and P3 where p1 = 30, t1=10, p2 =40, and


t2=15, and p3= 50 and t3= 25

i) Can these processes be scheduled using rate-monotonic (RMS) scheduling?


Illustrate your answer using Gantt chart
ii) Illustrate the scheduling of these processes using earliest-deadline-first
(EDF) scheduling.

Good Luck