You are on page 1of 113

1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 5 11/01/2023 18:34


First Published: 19/07/2022 12:20

SUVARNA SUTERA - ASHTA CLUSTER SHOPHOUSE


SHOPHOUSES (39) - new - 2 & 3 storey
Jalan Padi Utama, Kelurahan Pasir Gadung, Kecamatan Cikupa, Kabupaten Tangerang, Special Capital Region of
Jakarta 15710, Indonesia

Information

 Status: MAIN CONTRACTOR APPOINTED BY NEGOTIATION | CONSTRUCTION EXPECTED TO COMMENCE MARCH


2023

 Project ID 220021002  Categories Retail


 Project Stage Pre-Construction  Subcategories Shop, Shopping Centre,
Supermarket
 Project Status Contract Awarded / Builder
Appointed  DA Number -
 Project Value Estimated 30,566.00m IDR  BCI Researcher Hanny Sekar Utami
(2.05m USD)
 Town Kabupaten Tangerang
 Province Special Capital Region of
Jakarta
 Region Java

Overview

 Floor Area 5,557 Square Meters  Main Contractor Yes


Appointed
 Site Area -
 Storeys 3 storeys  Main Contractor Yes
Listed
 Units Residential units - 39
 Main Contractor Non-Tender
 Green Building -
Appointment Method
 Related Projects
220678002 -  Main Contractor -
SUVARNA SUTERA - Tender Closing Date
ASHTA CLUSTER  Construction Start March 2023
(PHASE 2)
 Construction End September 2023
220677002 -
SUVARNA SUTERA -
ASHTA CLUSTER
(PHASE 3)
220675002 -
SUVARNA SUTERA -
ASHTA CLUSTER

https://app-leadmanager.bcicentral.com/main/search 1/113
1/13/23, 2:21 PM LeadManager | BCI Central

SHOPHOUSE
(PHASE 2)
220676002 -
SUVARNA SUTERA -
ASHTA CLUSTER
SHOPHOUSE
(PHASE 3)
220020002 -
SUVARNA SUTERA -
ASHTA CLUSTER

 Ownership Type Commercial


 Development Type New construction

Project Details
39 x 2 & 3 storey shophouses (2 types of units :
approx. 100 & 185 sq m)
At grade car park

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : lightweight steel
Aluminium framed doors & windows / fabricated
wood doors
Sanitary ware / plumbing

Estimated 6 months project

https://app-leadmanager.bcicentral.com/main/search 2/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Delta Mega Persada PT (subsidiary of Alam Sutera Realty Tbk PT)


 Ms Stacia Andini
 Quantity Surveyor - Procurement Manager
 62 21 592 8989 / 2977 9788
 stacia.andini@alam-sutera.com
 suvarnasutera.com
 Jalan Padi Utama No. 1, Suvarna Sutera, Kelurahan Cikupa,
Kecamatan Cikupa , Kabupaten Tangerang , 15710 , Banten ,
Indonesia

 Mr Irwan Soetanto
 Project Coordinator
 62 21 592 8989 / 2977 9788
 irwan@alam-sutera.com
 suvarnasutera.com
 Jalan Padi Utama No. 1, Suvarna Sutera, Kelurahan Cikupa,
Kecamatan Cikupa , Kabupaten Tangerang , 15710 , Banten ,
Indonesia

Architect/Designer

 Company Role: Architect
 Role Status: Appointed

 Remarks: -

Alam Sutera Realty Tbk PT


 Ms Mira Rani Naga
 Planning Manager
 62 21 3043 8888 / 3110 3838
 mira@alam-sutera.com
 www.alam-sutera.com
 Sinergy Building Lantai 17, Jalan Jalur Sutera Barat Kavling 17,
Kelurahan Panunggangan Timur, Kecamatan Pinang , Kota

https://app-leadmanager.bcicentral.com/main/search 3/113
1/13/23, 2:21 PM LeadManager | BCI Central

Tangerang , 15143 , Banten , Indonesia

Engineering/Technical/Services Consultant

 Company Role: Quantity Surveyor


 Role Status: Appointed
 Remarks: -

Delta Mega Persada PT (subsidiary of Alam Sutera Realty Tbk PT)


 Ms Cindy Novianti Tantama
 Quantity Surveyor
 62 21 592 8989 / 2977 9788
 cindy.tantama@alam-sutera.com
 suvarnasutera.com
 Jalan Padi Utama No. 1, Suvarna Sutera, Kelurahan Cikupa,
Kecamatan Cikupa , Kabupaten Tangerang , 15710 , Banten ,
Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed
 Remarks: -

Hasco Reka Cipta PT


 Mr Priadi Wirawan
 Project Coordinator
 62 21 3193 5808
 Jalan Haji Agus Salim No.38A, Kelurahan Kebon Sirih, Kecamatan
Menteng , Jakarta Pusat , 10340 , Special Capital Region of
Jakarta , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

https://app-leadmanager.bcicentral.com/main/search 4/113
1/13/23, 2:21 PM LeadManager | BCI Central

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 5/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 1 11/01/2023 18:30


First Published: 11/01/2023 18:30

SIAGIAN AGRO RESIDENCE (PHASE 2)


HOUSES (45) - new - single storey
Jalan Lintas Sumatera, Dusun II Pirbun, Dusun II Pirbun, Desa Mampang, Kecamatan Kotapinang, Labuhanbatu
Selatan, North Sumatera 21464, Indonesia

Information

 Status: DEVELOPER BUILDER LISTED | ARCHITECT NOT DISCLOSED

 Project ID 225987002  Categories Residential


 Project Stage Pre-Construction  Subcategories House, Villa, Bungalow /
 Project Status Contract Awarded / Builder Residential Estate
Appointed  DA Number -
 Project Value Estimated 10,044.00m IDR  BCI Researcher M. Ibnu Sofyan Harahap
(0.64m USD)
 Town Labuhanbatu Selatan
 Province North Sumatera
 Region Sumatera

Overview

 Floor Area 1,620 Square Meters  Main Contractor Yes


 Site Area - Appointed

 Storeys 1 storeys  Main Contractor Yes


Listed
 Units Residential units - 45
 Main Contractor Non-Tender
 Green Building -
Appointment Method
 Related Projects
225986002 -  Main Contractor -
SIAGIAN AGRO Tender Closing Date
RESIDENCE (PHASE  Construction Start Quarter 4,2023
1)
 Construction End Quarter 1, 2024

 Ownership Type Commercial


 Development Type New construction

Project Details
45 single storey houses (single type of house :
approx. 36 sq m)

https://app-leadmanager.bcicentral.com/main/search 6/113
1/13/23, 2:21 PM LeadManager | BCI Central

Units to have 2 bedrooms

Building elements include:


Flooring : ceramic tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : brick walls
Roofing : metal sheet roofing
Roof truss : lightweight steel
Timber framed doors & windows / solid wood
doors
Sanitary ware / plumbing

https://app-leadmanager.bcicentral.com/main/search 7/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Narasaon Abadi Property PT


 Mr Haris Amaluddin
 Director
 62 813 7677 0103
 narasaonabadiproperty@gmail.com
 Jalan Lintas Sumatera, Dusun II Pirbun, Dusun II Pirbun, Desa
Mampang, Kecamatan Kotapinang , Labuhanbatu Selatan , 21464
, North Sumatera , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed
 Remarks: -

Narasaon Abadi Property PT


 Mr Martadinata Sitorus
 Project Manager
 62 853 7313 4496
 narasaonabadiproperty@gmail.com
 Jalan Lintas Sumatera, Dusun II Pirbun, Dusun II Pirbun, Desa
Mampang, Kecamatan Kotapinang , Labuhanbatu Selatan , 21464
, North Sumatera , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

https://app-leadmanager.bcicentral.com/main/search 8/113
1/13/23, 2:21 PM LeadManager | BCI Central

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 9/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 1 11/01/2023 17:52


First Published: 11/01/2023 17:52

RELOKASI PASAR SENTUL


MARKET - new - single storey
Jalan Batikan, Kelurahan Pandeyan, Kecamatan Umbulharjo, Yogyakarta, Yogyakarta 55161, Indonesia

Information

 Status: OPEN TENDERS FOR MAIN CONTRACT ADVERTISED | CONTRACT EXPECTED TO BE AWARDED 30 JANUARY
2023 | ARCHITECT NOT DISCLOSED

 Project ID 225970002  Categories Retail


 Project Stage Pre-Construction  Subcategories Showroom, Retail
 Project Status Tender Called Warehouse, Market

 Project Value Approximate 2,499.00m  DA Number -


IDR (0.16m USD)  BCI Researcher Nur Saddia Maulinda
 Town Yogyakarta
 Province Yogyakarta
 Region Java

Overview

 Floor Area 400 Square Meters  Main Contractor No


 Site Area - Appointed

 Storeys 1 storeys  Main Contractor No


Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
 Main Contractor 17 January 2023
 Ownership Type Government Tender Closing Date
 Development Type New construction
 Construction Start February 2023
 Construction End May 2023

Project Details
Single storey market building (approx. 400 sq m)
Retail kiosks & stalls
Public restroom
At grade car park

https://app-leadmanager.bcicentral.com/main/search 10/113
1/13/23, 2:21 PM LeadManager | BCI Central

Building elements include:


Flooring : ceramic tile / hardened concrete floor
Structural : reinforced concrete
Ceiling : gypsum board
Walling : brick walls
Roofing : metal sheet roofing
Roof truss : steel frame
Aluminium framed doors & windows / rolling
doors / folding gates
Sanitary ware / plumbing

https://app-leadmanager.bcicentral.com/main/search 11/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Government Implementing Agency


 Role Status: Appointed

 Remarks: -

Dinas Pekerjaan Umum, Perumahan dan Kawasan Permukiman Kota Yogyakarta


 Mr Hari Setyowacono
 Head Officer
 62 274 515 865 / 586 795 / 515 866
 upik@jogjakota.go.id
 pu.jogjakota.go.id
 Kompleks Balai Kota Timoho Yogyakarta, Jalan Kenari No. 56,
Kelurahan Muja Muju, Kecamatan Umbulharjo , 55165 ,
Yogyakarta , Indonesia

 Mr Budi Iswanto
 Head Section of Building Management
 62 274 515 865 / 586 795 / 515 866 (ext. 178)
 upik@jogjakota.go.id
 pu.jogjakota.go.id
 Kompleks Balai Kota Timoho Yogyakarta, Jalan Kenari No. 56,
Kelurahan Muja Muju, Kecamatan Umbulharjo , 55165 ,
Yogyakarta , Indonesia

 Company Role: Tender Office


 Role Status: Appointed
 Remarks: -

Pemerintah Kota Yogyakarta - Unit Layanan Pengadaan (ULP)


 Mr Joko Budi Prasetyo
 Head of Procurement Department
 62 274 515 865 / 515 866 ext. 267
 ulp@jogjakota.go.id
 Kompleks Balaikota Timoho Yogyakarta, Gedung Sayap Barat
Lantai 3, Jalan Kenari No. 56, Kelurahan Muja Muju, Kecamatan
Umbulharjo , 55165 , Yogyakarta , Indonesia

https://app-leadmanager.bcicentral.com/main/search 12/113
1/13/23, 2:21 PM LeadManager | BCI Central

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: To be appointed
 Tender Opening Date: 11 January 2023  Tender Closing Date: 17 January 2023
 Remarks: Qualification : Small scale business. Qualification method : Post-qualification. The aanwijzing
(tender explanation) is scheduled on 13 January 2023. SBU BG009 atau KBLI 41019.

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 13/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 2 11/01/2023 17:28


First Published: 28/12/2022 16:59

DETASEMEN MARKAS BESAR TENTARA NASIONAL INDONESIA ANGKATAN DARAT


(DENMABESAD) - RUMAH SUSUN
FLATS (140) - new - 8 storey
Jalan Ir. H. Jaunda 1, Kelurahan Kebon Kelapa, Kecamatan Gambir, Jakarta Pusat, Special Capital Region of
Jakarta 10120, Indonesia

Information

 Status: OPEN TENDERS FOR MAIN CONTRACT CLOSED | BID LISTED | PREFERRED TENDERER LISTED | CONTRACT
EXPECTED TO BE AWARDED 31 JANUARY 2023

 Project ID 225536002  Categories Residential


 Project Stage Pre-Construction  Subcategories Apartment, Condominium,
 Project Status Tender Closed - Tenderers Townhouse
Listed  DA Number -
 Project Value Approximate 80,260.00m  BCI Researcher Dinda Ayu Prameswari
IDR (5.12m USD)
 Town Jakarta Pusat
 Province Special Capital Region of
Jakarta
 Region Java

Overview

 Floor Area 16,000 Square Meters  Main Contractor No


 Site Area - Appointed

 Storeys 8 storeys  Main Contractor No


Listed
 Units Residential units - 140
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
 Main Contractor 02 January 2023
 Ownership Type Government Tender Closing Date
 Development Type New construction
 Construction Start February 2023
 Construction End December 2023

Project Details
8 storey public housing flats (approx. 16,000 sq
m)

https://app-leadmanager.bcicentral.com/main/search 14/113
1/13/23, 2:21 PM LeadManager | BCI Central

140 flats (single type of units : approx. 45 sq m)


At grade car park

Building elements include:


Flooring : ceramic tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : steel frame
Aluminium framed doors & windows / solid wood
doors
Lift
Fire protection system
Sanitary ware / plumbing

https://app-leadmanager.bcicentral.com/main/search 15/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Government Implementing Agency


 Role Status: Appointed

 Remarks: -

Pusat Zeni TNI Angkatan Darat (PUSZIAD)


 Mr Bambang Karyawan Pinilih
 Head of Tender Committee
 Not available
 Jalan Kesatrian II No.5, RT 005 / RW 003, Kelurahan Kebon
Manggis, Kecamatan Matraman , Jakarta Timur , 13150 , Special
Capital Region of Jakarta , Indonesia
 Please contact by Mail.

 Mr Mohammad Munib
 Head Officer
 Not available
 Jalan Kesatrian II No.5, RT 005 / RW 003, Kelurahan Kebon
Manggis, Kecamatan Matraman , Jakarta Timur , 13150 , Special
Capital Region of Jakarta , Indonesia
 Please contact by Mail.

 Company Role: Tender Office


 Role Status: Appointed

 Remarks: -

Kementerian Pertahanan Republik Indonesia - Markas Besar TNI Angkatan Darat


 Mr Irwan
 Member of Tender Committee
 62 21 345 6838
 datinrenhan@kemhan.go.id
 tniad.mil.id
 Jalan Veteran No. 5, Kelurahan Gambir, Kecamatan Gambir ,
Jakarta Pusat , 10110 , Special Capital Region of Jakarta ,
Indonesia

https://app-leadmanager.bcicentral.com/main/search 16/113
1/13/23, 2:21 PM LeadManager | BCI Central

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Open tender
 Tender Opening Date: 27 December 2022  Tender Closing Date: 02 January 2023
 Remarks: End of objection 16 January 2023.

Tendering:

Wijaya Perdana PT  Bids:80.26m IDR

 Mr Kemal Adriansjah
 Director
 62 21 750 7322
 logistik.wp@yahoo.com
 Ruko Lantai 3, Jalan RS Fatmawati No. 1B, Kelurahan Cilandak
Barat, Kecamatan Cilandak , Jakarta Selatan , 12430 , Special
Capital Region of Jakarta , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 17/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 3 11/01/2023 17:25


First Published: 04/08/2022 19:20

TIGARAKSA II - TIGARAKSA HIGH-VOLTAGE TRANSMISSION LINES (150 KV)


(SECTION II)
TRANSMISSION LINES - new
Kecamatan Tigaraksa & Kecamatan Solear, Kabupaten Tangerang, Special Capital Region of Jakarta 15720,
Indonesia

Information

 Status: MAIN CONTRACT AWARDED | CONSTRUCTION EXPECTED TO COMMENCE FEBRUARY 2023

 Project ID 220646002  Categories Utilities / Infrastructure


 Project Stage Pre-Construction  Subcategories Power Station, Electricity
 Project Status Contract Awarded / Builder Distribution / Civil Works,
Appointed Excavation / Radio, TV
Station, Optical
 Project Value Confirmed 54,583.00m IDR
Fibre/Transmitting Tower
(3.50m USD)
 DA Number -
 Town Kabupaten Tangerang
 BCI Researcher Adhi Rachma Kanitra
 Province Special Capital Region of
Wardhana
Jakarta
 Region Java

Overview

 Floor Area -  Main Contractor Yes


 Site Area - Appointed

 Storeys -  Main Contractor Yes


Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
 Main Contractor -
 Ownership Type Commercial Tender Closing Date
 Development Type New construction
 Construction Start February 2023
 Construction End November 2023

Project Details
High-voltage transmission lines (capacity of 150
kilo volt (kV)

https://app-leadmanager.bcicentral.com/main/search 18/113
1/13/23, 2:21 PM LeadManager | BCI Central

Type of conductor : 2 cct with 20 (kilometer


sirkuit) kms
Link Tigaraksa II / Citra Maja - Tigaraksa
Latticed steel tower
Foundation work
44 towers erection
Commissioning test

https://app-leadmanager.bcicentral.com/main/search 19/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Perusahaan Listrik Negara (Persero) PT - Unit Induk Pembangunan Jawa Bagian Barat
(UIP V)
 Mr Octavianus Padudung
 General Manager
 62 21 753 5500 / 754 3554
 pengadaan.uip.v@gmail.com
 www.pln.co.id
 Jalan Ehave, Kelurahan Gandul, Kecamatan Cinere , Depok ,
16514 , West Java , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed

 Remarks: -

Bukaka Teknik Utama Tbk PT (member of Bukaka group)


 Mr Mawardi Maliki
 Procurement Manager
 62 21 823 2323 / 823 1146
 mawardi@bukaka.com
 www.bukaka.com
 Kompleks Bukaka Industrial, Jalan Raya Bekasi Narogong Km.
19,5, Limus Nunggal, Kecamatan Cileungsi , Kabupaten Bogor ,
16820 , West Java , Indonesia

 Mr Irsal Kamaruddin
 Director
 62 21 823 2323 / 823 1146
 corsec@bukaka.com
 www.bukaka.com
 Kompleks Bukaka Industrial, Jalan Raya Bekasi Narogong Km.
19,5, Limus Nunggal, Kecamatan Cileungsi , Kabupaten Bogor ,

https://app-leadmanager.bcicentral.com/main/search 20/113
1/13/23, 2:21 PM LeadManager | BCI Central

16820 , West Java , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 21/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 1 11/01/2023 17:04


First Published: 11/01/2023 17:04

DI. SIMAN REHABILITATION (PHASE 5) (PACKAGE 2)


IRRIGATION - upgrade
Daerah Irigasi Siman, Desa Siman, Kecamatan Kepung, Kediri, East Java, Indonesia

Information

 Status: OPEN TENDERS CLOSED MAIN CONTRACT CLOSED | CONTRACT EXPECTED TO BE AWARDED 17 FEBRUARY
2023 | OPEN TENDERS ADVERTISED FOR SUPERVISORY CONSULTANT | CONTRACT EXPECTED TO BE AWARDED 14
APRIL 2023

 Project ID 225958002  Categories Infrastructure


 Project Stage Pre-Construction  Subcategories Dam, Reservoir, Channel,
 Project Status Tender Closed - Contract Irrigation / Civil Works,
Not Yet Awarded Excavation

 Project Value Approximate 75,000.00m  DA Number -


IDR (4.79m USD)  BCI Researcher Dita Fitrianti
 Town Kediri
 Province East Java
 Region Java

Overview

 Floor Area -  Main Contractor No


Appointed
 Site Area -
 Storeys -  Main Contractor No
Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
208864002 - D.I  Main Contractor -
SIMAN Tender Closing Date
REHABILITATION  Construction Start April 2023
(PHASE 2)
 Construction End December 2023
213812002 - DI.
SIMAN
REHABILITATION
(PHASE 3)
219832002 - DI.
SIMAN
REHABILITATION
(PHASE 4)

https://app-leadmanager.bcicentral.com/main/search 22/113
1/13/23, 2:21 PM LeadManager | BCI Central

225955002 - DI.
SIMAN
REHABILITATION
(PHASE 5)
(PACKAGE 1)

 Ownership Type Government


 Development Type Refurbishment

Project Details
Irrigation system (approx. 30 km length)
Primary irrigation channel
Secondary irrigation channel
Water control & irrigation gates
Civil works

https://app-leadmanager.bcicentral.com/main/search 23/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Government Implementing Agency


 Role Status: Appointed

 Remarks: -

Kementerian Pekerjaan Umum dan Perumahan Rakyat - Direktorat Jenderal Sumber


Daya Air - Balai Besar Wilayah Sungai Brantas
 Mr Agung Purnayudha
 Project Contract Officer - Irrigation & Swamp I
 62 31 752 3488 / 752 1645
 bbwsbrantas@pu.go.id
 sda.pu.go.id/balai/bbwsbrantas
 Jalan Raya Menganti No. 312, Kelurahan Babatan, Kecamatan
Wiyung , Surabaya , 60227 , East Java , Indonesia

 Mr Danny Riyadi Tama


 Head of SNVT Implementation of Water Utilization Network
 62 31 752 3488 / 752 1645 (ext. 298)
 satkerpjpabrantas@gmail.com
 sda.pu.go.id/balai/bbwsbrantas
 Jalan Raya Menganti No. 312, Kelurahan Babatan, Kecamatan
Wiyung , Surabaya , 60227 , East Java , Indonesia

 Company Role: Supervisory Consultant


 Role Status: To be appointed
 Tender Opening Date: 11 January 2023  Tender Closing Date: 18 January 2023
 Remarks: Qualification : Non small scale business. Qualification method : Pre qualification. The
aanwijzing (tender explanation) is scheduled on 06 March 2023. SBU RE203 : Jasa Pengawas
Pekerjaan Konstruksi Teknik Sipil Air

 Company Role: Tender Office


 Role Status: Appointed

 Remarks: -

Kementerian Pekerjaan Umum dan Perumahan Rakyat - Balai Pelaksana Pemilihan Jasa
Konstruksi (BP2JK) Wilayah Jawa Timur
 Mr Agus Kurniawan

https://app-leadmanager.bcicentral.com/main/search 24/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Head Officer
 62 31 9914 1698
 bp2jk.jatim@pu.go.id
 ulp.pu.go.id
 Jalan Bukit Darmo Raya No. 1, Kelurahan Pradah Kali Kendal,
Kecamatan Dukuh Pakis , Surabaya , 60226 , East Java ,
Indonesia

Engineering/Technical/Services Consultant

 Company Role: Civil Engineer


 Role Status: Appointed

 Remarks: -

Vitraha Consindotama PT
 Mr Agung Pambudi
 Director
 62 22 603 4869
 vitraha@yahoo.co.id
 Jalan Katalina II No. 6 RT 01 / RW 03, Kelurahan Campaka,
Kecamatan Andir , Kota Bandung , 40184 , West Java , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: To be appointed
 Remarks: Administrative & technical evaluation in progress.

Other

 Company Role: Environmental Impact Assessment


 Role Status: Appointed

 Remarks: -

Alam Raya Utama Sejahtera CV


 Mr Hendi Hidayat
 Director
 62 274 288 0164

https://app-leadmanager.bcicentral.com/main/search 25/113
1/13/23, 2:21 PM LeadManager | BCI Central

 arusjogja@gmail.com
 Jalan Pangukan Blok H No. 33, RT 002 / RW 009, Kelurahan
Tridadi, Kecamatan Sleman , Sleman , 55511 , Yogyakarta ,
Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 26/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 1 11/01/2023 16:29


First Published: 11/01/2023 16:29

DI. BONDOYUDO REHABILITATION (PHASE 3)


IRRIGATION - upgrade
Daerah Irigasi Bondoyudo, Kecamatan Semboro, Jember, East Java 68111, Indonesia

Information

 Status: OPEN TENDERS FOR MAIN CONTRACT CLOSED | CONTRACT EXPECTED TO BE AWARDED 17 FEBRUARY 2023 |
OPEN TENDERS ADVERTISED FOR SUPERVISORY CONSULTANT | CONTRACT EXPECTED TO BE AWARDED 28 MARCH
2023 | CIVIL ENGINEER NOT DISCLOSED

 Project ID 225968002  Categories Infrastructure


 Project Stage Pre-Construction  Subcategories Dam, Reservoir, Channel,
 Project Status Tender Closed - Contract Irrigation / Civil Works,
Not Yet Awarded Excavation

 Project Value Approximate 27,500.00m  DA Number -


IDR (1.76m USD)  BCI Researcher Dita Fitrianti
 Town Jember
 Province East Java
 Region Java

Overview

 Floor Area -  Main Contractor No


Appointed
 Site Area -
 Storeys -  Main Contractor No
Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
219828002 - DI.  Main Contractor -
BONDOYUDO Tender Closing Date
REHABILITATION  Construction Start April 2023
(PHASE 2)
 Construction End December 2023

 Ownership Type Government


 Development Type Refurbishment

Project Details
Irrigation system (approx. 1.00 km length)

https://app-leadmanager.bcicentral.com/main/search 27/113
1/13/23, 2:21 PM LeadManager | BCI Central

Primary irrigation channel


Secondary irrigation channel
Water control & irrigation gates
Civil works

https://app-leadmanager.bcicentral.com/main/search 28/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Government Implementing Agency


 Role Status: Appointed

 Remarks: -

Kementerian Pekerjaan Umum dan Perumahan Rakyat - Direktorat Jenderal Sumber


Daya Air - Balai Besar Wilayah Sungai Brantas
 Mr Agung Purnayudha
 Project Contract Officer - Irrigation & Swamp I
 62 31 752 3488 / 752 1645
 bbwsbrantas@pu.go.id
 sda.pu.go.id/balai/bbwsbrantas
 Jalan Raya Menganti No. 312, Kelurahan Babatan, Kecamatan
Wiyung , Surabaya , 60227 , East Java , Indonesia

 Mr Danny Riyadi Tama


 Head of SNVT Implementation of Water Utilization Network
 62 31 752 3488 / 752 1645 (ext. 298)
 satkerpjpabrantas@gmail.com
 sda.pu.go.id/balai/bbwsbrantas
 Jalan Raya Menganti No. 312, Kelurahan Babatan, Kecamatan
Wiyung , Surabaya , 60227 , East Java , Indonesia

 Company Role: Supervisory Consultant


 Role Status: To be appointed
 Tender Opening Date: 10 January 2023  Tender Closing Date: 17 January 2023
 Remarks: Qualification : Non small scale business. Qualification method : Pre qualification. The
aanwijzing (tender explanation) is scheduled on 27 February 2023. SBU RE203 : Jasa
Pengawas Pekerjaan Konstruksi Teknik Sipil Air

 Company Role: Tender Office


 Role Status: Appointed

 Remarks: -

Kementerian Pekerjaan Umum dan Perumahan Rakyat - Balai Pelaksana Pemilihan Jasa
Konstruksi (BP2JK) Wilayah Jawa Timur
 Mr Agus Kurniawan

https://app-leadmanager.bcicentral.com/main/search 29/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Head Officer
 62 31 9914 1698
 bp2jk.jatim@pu.go.id
 ulp.pu.go.id
 Jalan Bukit Darmo Raya No. 1, Kelurahan Pradah Kali Kendal,
Kecamatan Dukuh Pakis , Surabaya , 60226 , East Java ,
Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: To be appointed

 Remarks: Administrative & technical evaluation in progress.

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 30/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 1 11/01/2023 16:11


First Published: 11/01/2023 16:11

DI. SIMAN REHABILITATION (PHASE 5) (PACKAGE 1)


IRRIGATION - upgrade
Daerah Irigasi Siman, Desa Siman, Kecamatan Kepung, Kediri, East Java, Indonesia

Information

 Status: OPEN TENDERS CLOSED MAIN CONTRACT CLOSED | CONTRACT EXPECTED TO BE AWARDED 17 FEBRUARY
2023 | OPEN TENDERS ADVERTISED FOR SUPERVISORY CONSULTANT | CONTRACT EXPECTED TO BE AWARDED 14
APRIL 2023

 Project ID 225955002  Categories Infrastructure


 Project Stage Pre-Construction  Subcategories Dam, Reservoir, Channel,
 Project Status Tender Closed - Contract Irrigation / Civil Works,
Not Yet Awarded Excavation

 Project Value Approximate 75,000.00m  DA Number -


IDR (4.79m USD)  BCI Researcher Dita Fitrianti
 Town Kediri
 Province East Java
 Region Java

Overview

 Floor Area -  Main Contractor No


Appointed
 Site Area -
 Storeys -  Main Contractor No
Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
197738002 - SIMAN  Main Contractor -
ELECTRICAL Tender Closing Date
SUBSTATION (150  Construction Start April 2023
KV)
 Construction End December 2023
208864002 - D.I
SIMAN
REHABILITATION
(PHASE 2)
213812002 - DI.
SIMAN
REHABILITATION
(PHASE 3)

https://app-leadmanager.bcicentral.com/main/search 31/113
1/13/23, 2:21 PM LeadManager | BCI Central

219832002 - DI.
SIMAN
REHABILITATION
(PHASE 4)

 Ownership Type Government


 Development Type Refurbishment

Project Details
Irrigation system (approx. 30 km length)
Primary irrigation channel
Secondary irrigation channel
Water control & irrigation gates
Civil works

https://app-leadmanager.bcicentral.com/main/search 32/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Government Implementing Agency


 Role Status: Appointed

 Remarks: -

Kementerian Pekerjaan Umum dan Perumahan Rakyat - Direktorat Jenderal Sumber


Daya Air - Balai Besar Wilayah Sungai Brantas
 Mr Agung Purnayudha
 Project Contract Officer - Irrigation & Swamp I
 62 31 752 3488 / 752 1645
 bbwsbrantas@pu.go.id
 sda.pu.go.id/balai/bbwsbrantas
 Jalan Raya Menganti No. 312, Kelurahan Babatan, Kecamatan
Wiyung , Surabaya , 60227 , East Java , Indonesia

 Mr Danny Riyadi Tama


 Head of SNVT Implementation of Water Utilization Network
 62 31 752 3488 / 752 1645 (ext. 298)
 satkerpjpabrantas@gmail.com
 sda.pu.go.id/balai/bbwsbrantas
 Jalan Raya Menganti No. 312, Kelurahan Babatan, Kecamatan
Wiyung , Surabaya , 60227 , East Java , Indonesia

 Company Role: Supervisory Consultant


 Role Status: To be appointed
 Tender Opening Date: 11 January 2023  Tender Closing Date: 18 January 2023
 Remarks: Qualification : Non small scale business. Qualification method : Pre qualification. The
aanwijzing (tender explanation) is scheduled on 06 March 2023. SBU RE203 : Jasa Pengawas
Pekerjaan Konstruksi Teknik Sipil Air

 Company Role: Tender Office


 Role Status: Appointed

 Remarks: -

Kementerian Pekerjaan Umum dan Perumahan Rakyat - Balai Pelaksana Pemilihan Jasa
Konstruksi (BP2JK) Wilayah Jawa Timur
 Mr Agus Kurniawan

https://app-leadmanager.bcicentral.com/main/search 33/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Head Officer
 62 31 9914 1698
 bp2jk.jatim@pu.go.id
 ulp.pu.go.id
 Jalan Bukit Darmo Raya No. 1, Kelurahan Pradah Kali Kendal,
Kecamatan Dukuh Pakis , Surabaya , 60226 , East Java ,
Indonesia

Engineering/Technical/Services Consultant

 Company Role: Civil Engineer


 Role Status: Appointed

 Remarks: -

Vitraha Consindotama PT
 Mr Agung Pambudi
 Director
 62 22 603 4869
 vitraha@yahoo.co.id
 Jalan Katalina II No. 6 RT 01 / RW 03, Kelurahan Campaka,
Kecamatan Andir , Kota Bandung , 40184 , West Java , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: To be appointed
 Remarks: Administrative & technical evaluation in progress.

Other

 Company Role: Environmental Impact Assessment


 Role Status: Appointed

 Remarks: -

Alam Raya Utama Sejahtera CV


 Mr Hendi Hidayat
 Director
 62 274 288 0164

https://app-leadmanager.bcicentral.com/main/search 34/113
1/13/23, 2:21 PM LeadManager | BCI Central

 arusjogja@gmail.com
 Jalan Pangukan Blok H No. 33, RT 002 / RW 009, Kelurahan
Tridadi, Kecamatan Sleman , Sleman , 55511 , Yogyakarta ,
Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 35/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 2 11/01/2023 16:08


First Published: 28/12/2022 17:51

MASKAR BESAR TNI ANGKATAN DARAT (MABESAD) - RUMAH SUSUN PASAR BARU
FLATS (58) - new - 8 storey
Jalan Pasar Baru, Kelurahan Pasar Baru, Kecamatan Sawah Besar, Jakarta Pusat, Special Capital Region of
Jakarta 10710, Indonesia

Information

 Status: OPEN TENDERS FOR MAIN CONTRACT CLOSED | BID LISTED | PREFERRED TENDERER LISTED | CONTRACT
EXPECTED TO BE AWARDED 31 JANUARY 2023

 Project ID 225533002  Categories Residential


 Project Stage Pre-Construction  Subcategories Apartment, Condominium,
 Project Status Tender Closed - Tenderers Townhouse
Listed  DA Number -
 Project Value Approximate 66,750.00m  BCI Researcher Dinda Ayu Prameswari
IDR (4.26m USD)
 Town Jakarta Pusat
 Province Special Capital Region of
Jakarta
 Region Java

Overview

 Floor Area 13,000 Square Meters  Main Contractor No


Appointed
 Site Area -
 Storeys 8 storeys  Main Contractor No
Listed
 Units Residential units - 58
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
 Main Contractor 02 January 2023
 Ownership Type Government Tender Closing Date
 Development Type New construction
 Construction Start February 2023
 Construction End December 2023

Project Details
8 storey public housing flats (approx. 13,000 sq
m)
58 flats (single type of units : approx. 57 sq m)

https://app-leadmanager.bcicentral.com/main/search 36/113
1/13/23, 2:21 PM LeadManager | BCI Central

At grade car park

Building elements include:


Flooring : ceramic tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : steel frame
Aluminium framed doors & windows / solid wood
doors
Fire protection system
Sanitary ware / plumbing

https://app-leadmanager.bcicentral.com/main/search 37/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Government Implementing Agency


 Role Status: Appointed

 Remarks: -

Pusat Zeni TNI Angkatan Darat (PUSZIAD)


 Mr Bambang Karyawan Pinilih
 Head of Tender Committee
 Not available
 Jalan Kesatrian II No.5, RT 005 / RW 003, Kelurahan Kebon
Manggis, Kecamatan Matraman , Jakarta Timur , 13150 , Special
Capital Region of Jakarta , Indonesia
 Please contact by Mail.

 Mr Mohammad Munib
 Head Officer
 Not available
 Jalan Kesatrian II No.5, RT 005 / RW 003, Kelurahan Kebon
Manggis, Kecamatan Matraman , Jakarta Timur , 13150 , Special
Capital Region of Jakarta , Indonesia
 Please contact by Mail.

 Company Role: Tender Office


 Role Status: Appointed

 Remarks: -

Kementerian Pertahanan Republik Indonesia - Markas Besar TNI Angkatan Darat


 Mr Irwan
 Member of Tender Committee
 62 21 345 6838
 datinrenhan@kemhan.go.id
 tniad.mil.id
 Jalan Veteran No. 5, Kelurahan Gambir, Kecamatan Gambir ,
Jakarta Pusat , 10110 , Special Capital Region of Jakarta ,
Indonesia

https://app-leadmanager.bcicentral.com/main/search 38/113
1/13/23, 2:21 PM LeadManager | BCI Central

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Open tender
 Tender Opening Date: 27 December 2022  Tender Closing Date: 02 January 2023
 Remarks: End of objection 16 January 2023.

Tendering:

Permata Anugerah Yalapersada PT  Bids:66.04m IDR

 Mr Heriyanto
 Director
 62 31 829 0235
 ptpay.group@gmail.com
 Jalan Wisma Menanggal IV No. 2, Kelurahan Menanggal,
Kecamatan Gayungan , Surabaya , 60234 , East Java , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 39/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 5 11/01/2023 14:22


First Published: 27/04/2021 17:35

SEKOLAH AL-AZHAR KAHURIPAN NIRWANA VILLAGE (KNV) SIDOARJO - TK & SD


(PHASE 2)
SCHOOL - new - 4 storey
Perumahan Kahuripan Nirwana Village, Jalan Kahuripan Raya, Kelurahan Entalsewu, Kecamatan Buduran,
Sidoarjo, East Java 61226, Indonesia

Information

 Status: CONSTRUCTION EXPECTED TO COMMENCE 3RD QUARTER 2023 | PILING CONTRACTOR TO BE APPOINTED BY
NEGOTIATION | CONTRACT NEGOTIATIONS CURRENTLY UNDERWAY | PROSPECTIVE PILING CONTRACTOR LISTED

 Project ID 209938002  Categories Education / Infrastructure


 Project Stage Pre-Construction / Community & Cultural /
Sport & Recreation
 Project Status Contract Awarded / Builder
Appointed  Subcategories School / Landscaping /
Library / Outdoor Sports
 Project Value Estimated 60,000.00m IDR
Court / Religious Building /
(3.84m USD)
Research Centre,
 Town Sidoarjo Laboratory, Observatory
 Province East Java
 DA Number -
 Region Java  BCI Researcher Raudina Husanty

Overview

 Floor Area 3,000 Square Meters  Main Contractor Yes


 Site Area 11,000 Square Meters Appointed

 Storeys 4 storeys  Main Contractor Yes


Listed
 Units -
 Main Contractor Non-Tender
 Green Building -
Appointment Method
 Related Projects
209939002 -  Main Contractor -
SEKOLAH AL- Tender Closing Date
AZHAR KAHURIPAN  Construction Start Quarter 3,2023
NIRWANA VILLAGE
 Construction End Quarter 4, 2024
(KNV) SIDOARJO -
SMP ISLAM AL
AZHAR 54 (PHASE
1)
224065002 -
SEKOLAH AL-
AZHAR KAHURIPAN

https://app-leadmanager.bcicentral.com/main/search 40/113
1/13/23, 2:21 PM LeadManager | BCI Central

NIRWANA VILLAGE
(KNV) SIDOARJO -
SMA (PHASE 3)

 Ownership Type Commercial


 Development Type New construction

Project Details
4 storey kindergarten & primary school building
(approx. 3,000 sq m)
Classrooms
Teacher rooms
Library rooms
Outdoor sports
Administrative office
Laboratories
At grade car park
Mosque
Landscaping

Building elements include :


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Facade : glass wall cladding / bricks terracotta
wall cladding
Roofing : concrete slab roof
Roof truss : steel frame
Piling : bored pile / precast pile
Aluminium framed doors & windows / fabricated
wood doors / solid wood doors
Lifts
Split type air conditioning
Fire protection system
Sanitary ware / plumbing / drainage

https://app-leadmanager.bcicentral.com/main/search 41/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Al Azhar Sarana Propertindo PT


 Mr Hengky Budiharto
 President Director
 62 31 9900 5376 / 5953 145
 project@alazharicon.com
 alazharicon.com
 TGA Building, Jalan Raya Kertajaya Indah Timur Blok P 110 No.
141, Kelurahan Gebang Putih, Kecamatan Sukolilo , Surabaya ,
60117 , East Java , Indonesia

 Ms Retno Pujiani
 Technical Officer
 62 31 9900 5376 / 5953 145
 spretno@gmail.com
 alazharicon.com
 TGA Building, Jalan Raya Kertajaya Indah Timur Blok P 110 No.
141, Kelurahan Gebang Putih, Kecamatan Sukolilo , Surabaya ,
60117 , East Java , Indonesia

Yayasan Pesantren Islam Al-Azhar (YPIA) Pusat


 Mr Shobirin
 Head Officer
 62 21 739 5980
 bagian.umum@al-azhar.or.id
 www.al-azhar.or.id
 Komplek Masjid Agung Al-Azhar, Jalan Sisingamangaraja,
Kelurahan Selong, Kecamatan Kebayoran Baru , Jakarta Selatan ,
12110 , Special Capital Region of Jakarta , Indonesia

Mutiara Masyhur Sejahtera PT (Subsidiary of Bakrie Swasakti Utama PT (aka Bakrieland


Group))
 Mr Aloysius Yudo
 Planning & Design Manager

https://app-leadmanager.bcicentral.com/main/search 42/113
1/13/23, 2:21 PM LeadManager | BCI Central

 62 31 8833 999 / 8071 634


 info@kahuripan-nirwana.com
 kahuripan-nirwana.com
 Jalan Kahuripan Raya Kavling 9-11, Kelurahan Entalsewu,
Kecamatan Buduran , Sidoarjo , 61252 , East Java , Indonesia
 Land owner.

 Mr Boy Arifin
 President Director
 62 31 8833 999 / 8071 634
 info@kahuripan-nirwana.com
 kahuripan-nirwana.com
 Jalan Kahuripan Raya Kavling 9-11, Kelurahan Entalsewu,
Kecamatan Buduran , Sidoarjo , 61252 , East Java , Indonesia
 Land owner.

Architect/Designer

 Company Role: Architect
 Role Status: Appointed
 Remarks: -

Tata Pola Harmoni PT (member of Al Azhar Sarana Propertindo PT)


 62 31 9900 5376
 project@alazharicon.com
 TGA Building, Jalan Raya Kertajaya Indah Timur Blok P 110 No.
141, Kelurahan Gebang Putih, Kecamatan Sukolilo , Surabaya ,
60117 , East Java , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed

 Remarks: -

Berkah Gemilang PT
 Mr Hartono Suwandoko
 Project Manager
 62 21 2793 9830

https://app-leadmanager.bcicentral.com/main/search 43/113
1/13/23, 2:21 PM LeadManager | BCI Central

 hrdbga@gmail.com
 www.berkahgemilang.co.id
 Jalan Laksana 1 No 18. RT 06 /RW 06, Kelurahan Rawa Barat,
Kecamatan Kebayoran Baru , Jakarta Selatan , 12180 , Special
Capital Region of Jakarta , Indonesia

 Mr Amir Hamzah
 President Director
 62 21 2793 9830
 hrdbga@gmail.com
 www.berkahgemilang.co.id
 Jalan Laksana 1 No 18. RT 06 /RW 06, Kelurahan Rawa Barat,
Kecamatan Kebayoran Baru , Jakarta Selatan , 12180 , Special
Capital Region of Jakarta , Indonesia

 Company Role: Piling & Foundation Contractor


 Role Status: Select tender

 Remarks: -

Tendering:

Wahana Cipta Concretindo PT (aka Wahana Pile)


 Mr Dharmanto Djaja Purnama
 Director
 62 31 879 1555 / 879 2655
 wahana_cipta_sby@yahoo.com
 Ruko Rungkut Megah Blok L No. 17, Jalan Raya Rungkut No. 5,
Kelurahan Kali Rungkut, Kecamatan Rungkut , Surabaya , 60293 ,
East Java , Indonesia

Subcontractor

 Company Role: Landscaping Subcontractor


 Role Status: Appointed

 Remarks: -

Excel Properti Manajemen PT (Subsidiary of Bakrie Swasakti Utama PT (aka Bakrieland


Group)
 Mr Ida Arifin
 Project Manager
 62 31 9970 4599

https://app-leadmanager.bcicentral.com/main/search 44/113
1/13/23, 2:21 PM LeadManager | BCI Central

 excelpropertimgt@gmail.com
 Ruko Boulevard Kavling 8, Perumahan Kahuripan Nirwana, Desa
Jati, Kecamatan Sidoarjo , Sidoarjo , 61226 , East Java , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 45/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 1 11/01/2023 14:18


First Published: 11/01/2023 14:18

GRAND HARMONI 2 BALARAJA


HOUSES (50) - new - single storey
Jalan Raya Saga - Bunar Kampung Kopo, Kelurahan Bunar, Kecamatan Sukamulya, Kabupaten Tangerang, Special
Capital Region of Jakarta 15610, Indonesia

Information

 Status: DEVELOPER BUILDER LISTED

 Project ID 225966002  Categories Residential


 Project Stage Pre-Construction  Subcategories House, Villa, Bungalow /
 Project Status Contract Awarded / Builder Residential Estate
Appointed  DA Number -
 Project Value Estimated 9,000.00m IDR  BCI Researcher Shabrina Hasnadhiya
(0.58m USD) Retnoasih
 Town Kabupaten Tangerang
 Province Special Capital Region of
Jakarta
 Region Java

Overview

 Floor Area 1,500 Square Meters  Main Contractor Yes


Appointed
 Site Area -
 Storeys 1 storeys  Main Contractor Yes
Listed
 Units Residential units - 50
 Main Contractor Non-Tender
 Green Building -
Appointment Method
 Related Projects
 Main Contractor -
 Ownership Type Commercial Tender Closing Date
 Development Type New construction  Construction Start April 2023
 Construction End December 2023

Project Details
50 single storey residential houses (single type of
houses : approx. 30 sq m)
Units to have 2 bedrooms
Internal road network

https://app-leadmanager.bcicentral.com/main/search 46/113
1/13/23, 2:21 PM LeadManager | BCI Central

Communal garden
Perimeter fence walls

Building elements include:


Flooring : ceramic tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : lightweight steel
Fabricated wood doors & windows
Sanitary ware / plumbing

Please find more information at www.grandharmoni.id/balaraja/

https://app-leadmanager.bcicentral.com/main/search 47/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Panca Bangun Propertindo PT


 Ms Tia
 Administration Officer
 62 81 1957 8088
 Jalan Citra Dua Extension Blok BE 1B No.12A, Kelurahan
Pegadungan, Kecamatan Kalideres , Jakarta Barat , 11830 ,
Special Capital Region of Jakarta , Indonesia

 Mr Reni Hapsari
 Purchasing & Administration Officer
 62 21 550 0908
 reni.pancaland@gmail.com
 Jalan Citra Dua Extension Blok BE 1B No.12A, Kelurahan
Pegadungan, Kecamatan Kalideres , Jakarta Barat , 11830 ,
Special Capital Region of Jakarta , Indonesia

Architect/Designer

 Company Role: Architect
 Role Status: Appointed
 Remarks: -

Panca Bangun Propertindo PT


 Mr Rian Sasmita
 Technical Officer
 62 21 550 0908
 riansasmita.work@gmail.com
 Jalan Citra Dua Extension Blok BE 1B No.12A, Kelurahan
Pegadungan, Kecamatan Kalideres , Jakarta Barat , 11830 ,
Special Capital Region of Jakarta , Indonesia

https://app-leadmanager.bcicentral.com/main/search 48/113
1/13/23, 2:21 PM LeadManager | BCI Central

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed

 Remarks: -

Panca Bangun Propertindo PT


 Mr Zainal Mustafa
 Project Manager
 62 21 550 0908
 znltkb32007@gmail.com
 Jalan Citra Dua Extension Blok BE 1B No.12A, Kelurahan
Pegadungan, Kecamatan Kalideres , Jakarta Barat , 11830 ,
Special Capital Region of Jakarta , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 49/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 2 11/01/2023 12:39


First Published: 28/12/2022 13:15

PANGKALAN UTAMA TNI ANGKATAN LAUT V - KANTOR DINAS ANGKUTAN (PHASE 2)


OFFICES for MILITARY FACILITIES - completion - 2 storey
Jalan Kalimas Baru No.146-148, Kelurahan Ujung, Kecamatan Semampir, Surabaya, East Java 60165, Indonesia

Information

 Status: OPEN TENDERS FOR MAIN CONTRACT CLOSED | BID LISTED | PREFERRED TENDERER LISTED | CONTRACT
EXPECTED TO BE AWARDED 17 JANUARY 2023

 Project ID 225514002  Categories Office / Legal & Military


 Project Stage Pre-Construction  Subcategories Office / Military
 Project Status Tender Closed - Tenderers Installations, Facilities
Listed  DA Number -
 Project Value Approximate 5,481.00m  BCI Researcher Nur Saddia Maulinda
IDR (0.35m USD)
 Town Surabaya
 Province East Java
 Region Java

Overview

 Floor Area 1,500 Square Meters  Main Contractor No


 Site Area 18,000 Square Meters Appointed

 Storeys 2 storeys  Main Contractor No


Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
 Main Contractor 31 December 2022
 Ownership Type Government Tender Closing Date
 Development Type Extension
 Construction Start February 2023
 Construction End September 2023

Project Details
Completion of 2 storey office (approx. 1,500 sq m), to include:
Work stations & office space
Meeting rooms
Public administration service counters
Waiting room

https://app-leadmanager.bcicentral.com/main/search 50/113
1/13/23, 2:21 PM LeadManager | BCI Central

Building elements include:


Flooring : ceramic tile / homogeneous tile
Ceiling : gypsum board
Structural : reinforced concrete
Walling : light brick walls / weathershield paint
finishing wall
Roofing : concrete roof tile
Roof truss : lightweight steel
Aluminium framed doors & windows
Split type air conditioning
Fire protection system
Sanitary ware / plumbing

https://app-leadmanager.bcicentral.com/main/search 51/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Government Implementing Agency


 Role Status: Appointed

 Remarks: -

Kementerian Pertahanan Republik Indonesia - TNI Angkatan Laut - Pangkalan Utama TNI
Angkatan Laut V (LANTAMAL V)
 Ms Weningingtyas Alindri
 Assitant of Planning Division
 62 31 329 3576
 lantamal5-koarmada2.tnial.mil.id
 Jalan Laksda Moh. Nazir No.56, Kelurahan Perak Utara,
Kecamatan Pabean Cantikan , Surabaya , 60177 , East Java ,
Indonesia

 Ms Dewi Kristiawati
 Staff of Planning Division
 62 31 329 3576
 lantamal5-koarmada2.tnial.mil.id
 Jalan Laksda Moh. Nazir No.56, Kelurahan Perak Utara,
Kecamatan Pabean Cantikan , Surabaya , 60177 , East Java ,
Indonesia

 Company Role: Tender Office


 Role Status: Appointed

 Remarks: -

Kementerian Pertahanan Republik Indonesia - TNI Angkatan Laut - Pangkalan Utama TNI
Angkatan Laut V (LANTAMAL V)
 Mr Mohamad Soleh
 Member of Tender Committee
 62 31 329 3576
 lantamal5-koarmada2.tnial.mil.id
 Jalan Laksda Moh. Nazir No.56, Kelurahan Perak Utara,
Kecamatan Pabean Cantikan , Surabaya , 60177 , East Java ,
Indonesia

https://app-leadmanager.bcicentral.com/main/search 52/113
1/13/23, 2:21 PM LeadManager | BCI Central

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Open tender
 Tender Opening Date: 27 December 2022  Tender Closing Date: 31 December 2022
 Remarks: End of objection period on 15 January 2023.

Tendering:

Garuda Nusantara Construction PT  Bids:5.45m IDR

 Ms Meita Rebby Farizi


 Director
 Not available
 pt.garudanusantara@gmail.com
 Perum Taman Indah Soekarno Hatta No. 22 RT 04 / RW 18,
Kelurahan Mojolangu, Kecamatan Lowokwaru , Kota Malang ,
65142 , East Java , Indonesia
 Please contact by Email or Mail.

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 53/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 3 11/01/2023 12:29


First Published: 25/08/2022 18:31

CALABAI SEAPORT - WHARF & FACILITIES REHABILITATION


WHARF for SEAPORT - refurbishment
Pelabuhan Calabai, Kandai Dua, Woja, Kabupaten Dompu, West Nusa Tenggara 84261, Indonesia

Information

 Status: OPEN TENDERS FOR MAIN CONTRACT CLOSED | BID LISTED | PREFERRED TENDERER LISTED | CONTRACT
EXPECTED TO BE AWARDED 10 FEBRUARY 2023

 Project ID 221046002  Categories Infrastructure


 Project Stage Pre-Construction  Subcategories Marina, Dock, Pier / Civil
 Project Status Tender Closed - Tenderers Works, Excavation
Listed  DA Number -
 Project Value Approximate 58,502.00m  BCI Researcher Yurizal
IDR (3.73m USD)
 Town Kabupaten Dompu
 Province West Nusa Tenggara
 Region Nusa Tenggara

Overview

 Floor Area -  Main Contractor No


 Site Area - Appointed

 Storeys -  Main Contractor No


Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
 Main Contractor 02 January 2023
 Ownership Type Government Tender Closing Date
 Development Type Refurbishment
 Construction Start March 2023
 Construction End November 2023

Project Details
Reinforced concrete wharf (approx 300 m)
Breakwater
Retaining wall

https://app-leadmanager.bcicentral.com/main/search 54/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Government Implementing Agency


 Role Status: Appointed
 Remarks: -

Kementerian Perhubungan Republik Indonesia - Direktorat Jenderal Perhubungan Laut -


Kantor Unit Penyelenggara Pelabuhan Kelas III Calabai
 Mr Rodrieggo Obethnego Diaz
 Head Officer
 62 812 1946 4252
 kupp_calabai@yahoo.co.id
 Jalan Raya Pelabuhan Calabai, Kelurahan Potu, Kecamatan
Dompu , Kabupaten Dompu , 84214 , West Nusa Tenggara ,
Indonesia
 Please contact by WhatsApp's and Email

Kementerian Perhubungan Republik Indonesia - Direktorat Jenderal Perhubungan Laut -


Direktorat Pelabuhan dan Pengerukan - Satuan Kerja Peningkatan Fungsi Kepelabuhanan
Pusat
 Mr Aries Wibowo
 Head of Sub Directorate of Port Development Planning and Ports
Directorate
 62 21 350 5550 / 384 7955 ext 4175 / 4173
 kemenhub151@dephub.go.id
 hubla.dephub.go.id
 Gedung Karya Lantai 15 Kementerian Perhubungan, Jalan Medan
Merdeka Barat No. 8, Kelurahan Gambir, Kecamatan Gambir ,
Jakarta Pusat , 10110 , Special Capital Region of Jakarta ,
Indonesia

 Company Role: Tender Office


 Role Status: Appointed
 Remarks: -

Kementerian Perhubungan Republik Indonesia - Direktorat Jenderal Perhubungan Laut -


Kantor Unit Penyelenggara Pelabuhan Kelas III Calabai
 62 812 1946 4252
 kupp_calabai@yahoo.co.id

https://app-leadmanager.bcicentral.com/main/search 55/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Jalan Raya Pelabuhan Calabai, Kelurahan Potu, Kecamatan


Dompu , Kabupaten Dompu , 84214 , West Nusa Tenggara ,
Indonesia
 Please contact by Email or Mail

Engineering/Technical/Services Consultant

 Company Role: Feasibility Consultant


 Role Status: Appointed
 Remarks: -

Cita Prisma PT
 Ms Meta Safitri
 Team Leader
 62 22 250 3547
 citaprisma@yahoo.co.id
 Jalan Pesantren No. 47, Kelurahan Cigadung, Kecamatan
Cibeunying Kaler , Kota Bandung , 40191 , West Java , Indonesia

 Mr Rai Subisma Iriantono


 President Director
 62 22 250 3547
 citaprisma@yahoo.co.id
 Jalan Pesantren No. 47, Kelurahan Cigadung, Kecamatan
Cibeunying Kaler , Kota Bandung , 40191 , West Java , Indonesia

 Company Role: Civil Engineer


 Role Status: Appointed
 Remarks: -

Rayasurverindo Tirtasarana PT
 Mr Imam Yudawinata
 Engineer
 62 22 250 4343
 rayasurverindo@yahoo.com
 Jalan Tubagus Ismail VIII No. 27, Kelurahan Sekeloa, Kecamatan
Coblong , Kota Bandung , 40134 , West Java , Indonesia

 Mr Muhammad Ratman
 Director

https://app-leadmanager.bcicentral.com/main/search 56/113
1/13/23, 2:21 PM LeadManager | BCI Central

 62 22 250 4343
 rayasurverindo@yahoo.com
 Jalan Tubagus Ismail VIII No. 27, Kelurahan Sekeloa, Kecamatan
Coblong , Kota Bandung , 40134 , West Java , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Open tender
 Tender Opening Date: 28 December 2022  Tender Closing Date: 02 January 2023
 Remarks: End objection until 16 January 2023

Tendering:

Sulawesi Makmur Pratama PT  Bids:52,947.00m IDR

 Mr Rizky Maulana
 Director
 62 411 444 131
 sulawesimakmurpratama@gmail.com
 Jalan Topaz Raya Ruko Zamrud B. 10 No. 18, Kelurahan Masale,
Kecamatan Panakkukang , Makassar , 90231 , South Sulawesi ,
Indonesia

Other

 Company Role: Environmental Impact Assessment


 Role Status: Appointed

 Remarks: -

Galuh Rekasindo Konsultan PT


 Mr Galih Reza Yudhistira
 Engineer
 62 22 710 4141
 galuhrekasindo@yahoo.com
 Jalan Blora No. 12A RT 04 / RW 12, Kelurahan Antapani Kidul,
Kecamatan Antapani , Kota Bandung , 40291 , West Java ,
Indonesia

 Mr Ryan Adhitya Nugraha


 Project Director

https://app-leadmanager.bcicentral.com/main/search 57/113
1/13/23, 2:21 PM LeadManager | BCI Central

 62 22 710 4141
 galuhrekasindo@yahoo.com
 Jalan Blora No. 12A RT 04 / RW 12, Kelurahan Antapani Kidul,
Kecamatan Antapani , Kota Bandung , 40291 , West Java ,
Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 58/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 9 10/01/2023 19:31


First Published: 14/10/2021 19:09

CITRALAND KAIRAGI MANADO - CLUBHOUSE


CLUBHOUSE for HOUSES - new - 2 storey
Jalan Arie Lasut, Kelurahan Kairagi Satu, Kecamatan Mapanget, Manado, North Sulawesi 95232, Indonesia

Information

 Status: MAIN CONTRACT AWARDED | CONSTRUCTION EXPECTED TO COMMENCE MARCH 2023

 Project ID 213117002  Categories Sport & Recreation /


 Project Stage Pre-Construction Infrastructure /
Community & Cultural /
 Project Status Contract Awarded / Builder
Residential
Appointed
 Subcategories Sports Club House,
 Project Value Estimated 8,000.00m IDR
Ablution Block, Dressing
(0.56m USD)
Room / Civil Works,
 Town Manado Excavation / Community
 Province North Sulawesi Hall, Community Centre /
 Region Sulawesi Landscaping / Outdoor
Sports Court / Pipeline /
Residential Estate /
Swimming Pool, Aquatic
Centre, Sauna
 DA Number -
 BCI Researcher Nurul Astriany

Overview

 Floor Area 1,200 Square Meters  Main Contractor Yes


Appointed
 Site Area 140,000 Square Meters
 Storeys 2 storeys  Main Contractor Yes
Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
213111002 -  Main Contractor -
CITRALAND Tender Closing Date
KAIRAGI MANADO -  Construction Start March 2023
THE SOMERSET
 Construction End December 2023
CLUSTER
213112002 -
CITRALAND
KAIRAGI MANADO -

https://app-leadmanager.bcicentral.com/main/search 59/113
1/13/23, 2:21 PM LeadManager | BCI Central

MIDLANDS
CLUSTER
213113002 -
CITRALAND
KAIRAGI MANADO -
PRIMROSE HILL
CLUSTER
213114002 -
CITRALAND
KAIRAGI MANADO -
SALISBURY
CLUSTER
213115002 -
CITRALAND
KAIRAGI MANADO -
RIVERTRENT
CLUSTER
213116002 -
CITRALAND
KAIRAGI MANADO -
CARNABY STREET
SHOPHOUSES

 Ownership Type Commercial


 Development Type New construction

Project Details
2 storey clubhouse (approx. 1,200 sq m)
Swimming pool
Gym area
Hall
Half basketball court
Children playground
Land grading work
Sanitary & drainage work

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : lightweight steel
Aluminium framed doors & windows / fabricated
wood doors
Sanitary ware / plumbing

https://app-leadmanager.bcicentral.com/main/search 60/113
1/13/23, 2:21 PM LeadManager | BCI Central

https://app-leadmanager.bcicentral.com/main/search 61/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Citraland Kairagi Manado (members of Ciputra Group)


 Ms Sonya Lasut
 General Manager
 62 431 880 4215
 citralandkairagimanado@ciputra.com
 www.citralandkairagimanado.com
 Jalan A. A. Maramis, Ruko No. 8 D, Kelurahan Kairagi Satu,
Kecamatan Mapenget , Manado , 95253 , North Sulawesi ,
Indonesia

 Mr Suharto Budisantoso
 Technical Manager
 62 431 880 4215
 suharto.budisantoso@gmail.com
 www.citralandkairagimanado.com
 Jalan A. A. Maramis, Ruko No. 8 D, Kelurahan Kairagi Satu,
Kecamatan Mapenget , Manado , 95253 , North Sulawesi ,
Indonesia

Architect/Designer

 Company Role: Architect
 Role Status: Appointed

 Remarks: -

Citraland Kairagi Manado (members of Ciputra Group)


 Mr Marchall Kolanus
 Architect
 62 431 880 4215
 marchall.kolanus@ciputra.com
 www.citralandkairagimanado.com
 Jalan A. A. Maramis, Ruko No. 8 D, Kelurahan Kairagi Satu,
Kecamatan Mapenget , Manado , 95253 , North Sulawesi ,

https://app-leadmanager.bcicentral.com/main/search 62/113
1/13/23, 2:21 PM LeadManager | BCI Central

Indonesia

Engineering/Technical/Services Consultant

 Company Role: Structural Engineer


 Role Status: Appointed
 Remarks: -

Citraland Kairagi Manado (members of Ciputra Group)


 Mr Adrian Manoppo
 Project Coordinator
 62 431 880 4215
 adrian.manoppo@ciputra.com
 www.citralandkairagimanado.com
 Jalan A. A. Maramis, Ruko No. 8 D, Kelurahan Kairagi Satu,
Kecamatan Mapenget , Manado , 95253 , North Sulawesi ,
Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed
 Remarks: -

Eureka CV - Manado
 Mr William Nanjaya Yau
 Project Coordinator
 62 853 1365 9559
 eurekananjaya@gmail.com
 Jalan Walanda Maramis, Kelurahan Komo Luar, Kecamatan
Wenang , Manado , 95122 , North Sulawesi , Indonesia

 Company Role: Road Work Contractor


 Role Status: Appointed
 Remarks: -

Brata Adjie Nugraha PT

https://app-leadmanager.bcicentral.com/main/search 63/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Mr Fetno Pontoh
 Project Coordinator
 62 812 4853 8996
 pt.brataadjienugraha@gmail.com
 Jalan Raya Pantoloan Km.16, Kelurahan Pantoloan, Kecamatan
Tawaeli , Palu , 94143 , Central Sulawesi , Indonesia

Subcontractor

 Company Role: Earthworks, Excavation & Civil Subcontractor


 Role Status: Appointed
 Remarks: Land Grading Contractor.

Brata Adjie Nugraha PT


 Mr Andi Adit Aqhar
 Project Coordinator
 Not available
 pt.brataadjienugraha@gmail.com
 Jalan Raya Pantoloan Km.16, Kelurahan Pantoloan, Kecamatan
Tawaeli , Palu , 94143 , Central Sulawesi , Indonesia
 Please contact by Email.

Eureka CV - Manado
 Ms Natasya
 Staff of Project Division
 Not available
 eurekananjaya@gmail.com
 Jalan Walanda Maramis, Kelurahan Komo Luar, Kecamatan
Wenang , Manado , 95122 , North Sulawesi , Indonesia
 Please contact by Email.

 Company Role: Sanitary, Plumbing & Drainage Subcontractor


 Role Status: Appointed
 Remarks: Sanitary & drainage work.

Krisna Jaya Persada PT


 Mr Muhammad Isnan
 Project Coordinator

https://app-leadmanager.bcicentral.com/main/search 64/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Not available
 krisnajayapersada@gmail.com
 Dusun Purut RT 06 / RW 04, Desa Bades, Kecamatan Pasirian ,
Lumajang , 67372 , East Java , Indonesia
 Please contact by Email.

Cahaya Gilang Matahari PT


 Mr Muhammad Akbar Azkari
 Project Coordinator
 62 431 351 050
 pt.cahayagilangmatahari@gmail.com
 Jalan Raya Tomohon, Lingkungan II, Kelurahan Kakaskasen Dua,
Kecamatan Tomohon Utara , Tomohon , 95415 , North Sulawesi ,
Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 65/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 4 10/01/2023 19:29


First Published: 03/12/2018 19:39

SERANG SELATAN / BAROS ELECTRICAL SUBSTATION (150 KV)


ELECTRICAL SUBSTATION - new
Kelurahan Tejamari, Kecamatan Baros , Kabupaten Serang, Banten 42173, Indonesia

Information

 Status: MAIN CONTRACT AWARDED | CONSTRUCTION EXPECTED TO COMMENCE FEBRUARY 2023

 Project ID 185564002  Categories Utilities


 Project Stage Pre-Construction  Subcategories Power Station, Electricity
 Project Status Contract Awarded / Builder Distribution / Substation
Appointed  DA Number -
 Project Value Confirmed 72,693.00m IDR  BCI Researcher Adhi Rachma Kanitra
(4.66m USD) Wardhana
 Town Kabupaten Serang
 Province Banten
 Region Java

Overview
 Floor Area -  Main Contractor Yes
Appointed
 Site Area -
 Storeys -  Main Contractor Yes
Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
215129002 -  Main Contractor -
SERANG Tender Closing Date
ELECTRICAL  Construction Start February 2023
SUBSTATION
 Construction End Quarter 4, 2023

 Ownership Type Commercial


 Development Type New construction

Project Details
Electrical substation (capacity of 150 kilovolt (kV))
Electrical power transformer (capacity of 120
mega volt ampere (mva)

https://app-leadmanager.bcicentral.com/main/search 66/113
1/13/23, 2:21 PM LeadManager | BCI Central

Primary & secondary power lines


Ground wire
Overhead lines
Disconnect switch
Circuit breaker
Lightning arrester
Control building
Security fence

https://app-leadmanager.bcicentral.com/main/search 67/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Perusahaan Listrik Negara (Persero) PT - Unit Induk Pembangunan Jawa Bagian Barat
(UIP V)
 Mr Octavianus Padudung
 General Manager
 62 21 753 5500 / 754 3554
 pengadaan.uip.v@gmail.com
 www.pln.co.id
 Jalan Ehave, Kelurahan Gandul, Kecamatan Cinere , Depok ,
16514 , West Java , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed

 Remarks: -

Citramasjaya Teknikmandiri PT
 Mr Alar
 Staff of Procurement
 62 21 2278 8700 / 2278 8889
 admin.proc@citramas.co.id
 www.citramas.co.id
 Gedung Menara 165 Lantai 16, Jalan TB. Simatupang, Kavling 1,
Kelurahan Cilandak Timur, Kecamatan Pasar Minggu , Jakarta
Selatan , 12560 , Special Capital Region of Jakarta , Indonesia

 Mr Ahmad Fahmi
 Director
 62 21 2278 8700 / 2278 8889
 citramas@citramas.co.id
 www.citramas.co.id
 Gedung Menara 165 Lantai 16, Jalan TB. Simatupang, Kavling 1,
Kelurahan Cilandak Timur, Kecamatan Pasar Minggu , Jakarta

https://app-leadmanager.bcicentral.com/main/search 68/113
1/13/23, 2:21 PM LeadManager | BCI Central

Selatan , 12560 , Special Capital Region of Jakarta , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 69/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 1 10/01/2023 19:27


First Published: 10/01/2023 19:27

GRAND HARMONI 2 EXTENTION (PHASE 2)


HOUSES (42) - new - single & 1.5 storey
Jalan Raya Saga - Bunar Kampung Kopo, Kelurahan Bunar, Kecamatan Sukamulya, Kabupaten Tangerang, Special
Capital Region of Jakarta 15610, Indonesia

Information

 Status: DEVELOPER BUILDER LISTED

 Project ID 225949002  Categories Residential


 Project Stage Pre-Construction  Subcategories House, Villa, Bungalow /
 Project Status Contract Awarded / Builder Residential Estate
Appointed  DA Number -
 Project Value Estimated 9,450.00m IDR  BCI Researcher Shabrina Hasnadhiya
(0.60m USD) Retnoasih
 Town Kabupaten Tangerang
 Province Special Capital Region of
Jakarta
 Region Java

Overview

 Floor Area 1,575 Square Meters  Main Contractor Yes


Appointed
 Site Area -
 Storeys 2 storeys  Main Contractor Yes
Listed
 Units Residential units - 42
 Main Contractor Non-Tender
 Green Building -
Appointment Method
 Related Projects
 Main Contractor -
 Ownership Type Commercial Tender Closing Date
 Development Type New construction  Construction Start Quarter 1, 2024
 Construction End Quarter 4, 2024

Project Details
42 single & 1.5 storey residential houses (2 types
of houses : approx. 30 & 45 sq m)
Units to have 2 bedrooms
Internal road network

https://app-leadmanager.bcicentral.com/main/search 70/113
1/13/23, 2:21 PM LeadManager | BCI Central

Communal garden
Perimeter fence walls

Building elements include:


Flooring : ceramic tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : lightweight steel
Fabricated wood doors & windows
Sanitary ware / plumbing

Please find more information at www.grandharmoni.id/grand-harmoni-balaraja-ext/

https://app-leadmanager.bcicentral.com/main/search 71/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Tritunggal Jaya Prima PT


 Ms Tia
 Administration Officer
 62 81 1957 8088
 www.grandharmoni.id/grand-harmoni-balaraja-ext/
 Perumahan Grand Harmoni 2 Blok A6 No.1-2 Jalan Saga-Bunar,
Kampung Kopo, Kelurahan Bunar, Kecamatan Sukamulya ,
Kabupaten Tangerang , 15610 , Banten , Indonesia

Architect/Designer

 Company Role: Architect
 Role Status: Appointed
 Remarks: -

Tritunggal Jaya Prima PT


 Mr Rian Sasmita
 Technical Officer
 62 81 1957 8088
 riansasmita.work@gmail.com
 www.grandharmoni.id/grand-harmoni-balaraja-ext/
 Perumahan Grand Harmoni 2 Blok A6 No.1-2 Jalan Saga-Bunar,
Kampung Kopo, Kelurahan Bunar, Kecamatan Sukamulya ,
Kabupaten Tangerang , 15610 , Banten , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed

 Remarks: -

https://app-leadmanager.bcicentral.com/main/search 72/113
1/13/23, 2:21 PM LeadManager | BCI Central

Tritunggal Jaya Prima PT


 Mr Zainal Mustafa
 Project Manager
 62 81 1957 8088
 znltkb32007@gmail.com
 www.grandharmoni.id/grand-harmoni-balaraja-ext/
 Perumahan Grand Harmoni 2 Blok A6 No.1-2 Jalan Saga-Bunar,
Kampung Kopo, Kelurahan Bunar, Kecamatan Sukamulya ,
Kabupaten Tangerang , 15610 , Banten , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 73/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 8 10/01/2023 19:12


First Published: 28/05/2020 11:54

UNIVERSITAS AIRLANGGA (UNAIR) - GEDUNG PRINGGODIGDO KAMPUS B


UNIVERSITY - new - 10 storey
Kampus B Universitas Airlangga, Jalan Airlangga No.4 - 6, Kelurahan Airlangga, Kecamatan Gubeng, Surabaya,
East Java 60115, Indonesia

Information

 Status: MAIN CONTRACT AWARDED | CONSTRUCTION EXPECTED TO COMMENCE MARCH 2023

 Project ID 201729002  Categories Education


 Project Stage Pre-Construction  Subcategories University, College,
 Project Status Contract Awarded / Builder Institute / Research
Appointed Centre, Laboratory,
Observatory
 Project Value Confirmed 170,420.00m
IDR (10.87m USD)  DA Number -

 Town Surabaya  BCI Researcher Raudina Husanty

 Province East Java


 Region Java

Overview

 Floor Area 30,000 Square Meters  Main Contractor Yes


 Site Area - Appointed

 Storeys 10 storeys  Main Contractor Yes


Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
195078002 -  Main Contractor 31 October 2022
UNIVERSITAS Tender Closing Date
AIRLANGGA  Construction Start March 2023
(UNAIR) - GEDUNG
 Construction End December 2023
KULIAH BERSAMA
219641002 -
UNIVERSITAS
AIRLANGGA -
AIRLANGGA MALL
KAMPUS C
220130002 -
UNIVERSITAS
AIRLANGGA
(UNAIR) - GEDUNG

https://app-leadmanager.bcicentral.com/main/search 74/113
1/13/23, 2:21 PM LeadManager | BCI Central

SOETANDYO
WIGNJOSOEBROTO
FISIP
223028002 -
UNIVERSITAS
AIRLANGGA -
GEDUNG HEALTH
SCIENCE KAMPUS A

 Ownership Type Government


 Development Type New construction

Project Details
10 storey campus building (approx. 30,000 sq m)
Classrooms
Lecturer rooms
Laboratory
Administrative office
At grade car park

Building elements include:


Flooring : ceramic tile
Structural : reinforced concrete & composite steel
concrete beam
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete slab roof / metal sheet roofing
Roof truss : steel frame
Aluminium framed doors & windows / fabricated
wood doors
Piling : bored pile
Split type air conditioning
Sanitary ware / plumbing
Fire protection system
2 lifts

https://app-leadmanager.bcicentral.com/main/search 75/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Universitas Airlangga
 Ms Dini Setyowati
 Head of Planning & Development Division
 62 31 591 4042 / 591 2546
 adm@bpp.unair.ac.id
 www.unair.ac.id
 Kampus C Unair, Kantor Manajemen Lantai 1, Jalan Airlangga No.
4 - 6, Kelurahan Mulyorejo, Kecamatan Mulyorejo , Surabaya ,
60115 , East Java , Indonesia

Architect/Designer

 Company Role: Architect
 Role Status: Appointed
 Remarks: -

Yodya Karya (Persero) PT - Surabaya


 Mr Siswandi
 Branch Manager - Kepala Cabang
 62 31 853 9363
 siswandithok79@gmail.com
 Perumahan Deltasari, Jalan Delta Pelangi 3 No. 52, Kelurahan
Ngingas, Kecamatan Waru , Sidoarjo , 61256 , East Java ,
Indonesia

https://app-leadmanager.bcicentral.com/main/search 76/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Mr Alvin Naura
 Operational Technical Officer
 62 31 853 9363
 yokasurabaya@gmail.com
 Perumahan Deltasari, Jalan Delta Pelangi 3 No. 52, Kelurahan
Ngingas, Kecamatan Waru , Sidoarjo , 61256 , East Java ,
Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed

 Remarks: -

Pembangunan Perumahan (Persero) Tbk PT - Head Office


 Mr Joko Raharjo
 General Manager of Building Operation Division
 62 21 840 3883
 corsec@ptpp.co.id
 www.ptpp.co.id
 Plaza PP - Wisma Subiyanto, Jalan Letjen T. B. Simatupang No.
57, Kelurahan Gedong, Kecamatan Pasar Rebo , Jakarta Timur ,
13760 , Special Capital Region of Jakarta , Indonesia

 Company Role: Construction Manager


 Role Status: Appointed
 Remarks: -

Bina Karya (Persero) PT - Jakarta


 Mr Raharjo
 Team Leader Construction Manager
 62 21 819 8445 / 819 5135
 binakarya@binakarya.co.id
 binakarya.co.id
 Gedung Tamansari Hive Office Lantai 9, Jalan D.I. Panjaitan
Kavling 2, Kelurahan Cawang, Kecamatan Jatinegara , Jakarta
Timur , 13340 , Special Capital Region of Jakarta , Indonesia

https://app-leadmanager.bcicentral.com/main/search 77/113
1/13/23, 2:21 PM LeadManager | BCI Central

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 78/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 7 10/01/2023 19:00


First Published: 27/02/2021 22:58

QUR'AN CENTRE PEKANBARU - WISMA QORI : LANDSCAPING


LANDSCAPING for DORMITORIES - new
Kompleks Bandar Seni Raja Ali Haji / Purna MTQ, Jalan Jendral Sudirman, Kelurahan Simpang Tiga, Kecamatan
Bukit Raya, Pekanbaru, Riau 28282, Indonesia

Information

 Status: OPEN TENDERS FOR MAIN CONTRACT CANCELLED | OPEN TENDERS RE-ADVERTISED FOR MAIN CONTRACT |
CONTRACT EXPECTED TO BE AWARDED 30 JANUARY 2023 | OPEN TENDERS FOR CONSTRUCTION MANAGER
CLOSED | CONTRACT EXPECTED TO BE AWARDED 26 JANUARY 2023

 Project ID 208824002  Categories Infrastructure / Residential


 Project Stage Pre-Construction  Subcategories Landscaping / Dormitory
 Project Status Tender Called  DA Number -
 Project Value Approximate 7,333.00m  BCI Researcher M. Ibnu Sofyan Harahap
IDR (0.47m USD)
 Town Pekanbaru
 Province Riau
 Region Sumatera

Overview

 Floor Area -  Main Contractor No


Appointed
 Site Area 7,000 Square Meters
 Storeys -  Main Contractor No
Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
208822002 - QUR'AN  Main Contractor 02 December 2022
CENTRE Tender Closing Date
PEKANBARU  Construction Start February 2023
(PHASE 1)
 Construction End September 2023
208823002 - QUR'AN
CENTRE
PEKANBARU -
MOSQUE BUILDING :
LANDSCAPING
208825002 - QUR'AN
CENTRE
PEKANBARU -
WISMA QORIAH

https://app-leadmanager.bcicentral.com/main/search 79/113
1/13/23, 2:21 PM LeadManager | BCI Central

208826002 - QUR'AN
CENTRE
PEKANBARU -
LIBRARY BUILDING

 Ownership Type Government


 Development Type New construction

Project Details
Landscaping for dormitories building (approx.
7,000 sq m site)
Garden & park
Plaza / public area
Entrance gates
Internal road network
At grade car park

https://app-leadmanager.bcicentral.com/main/search 80/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Government Implementing Agency


 Role Status: Appointed

 Remarks: -

Dinas Pekerjaan Umum, Penataan Ruang, Perumahan, Kawasan Permukiman dan


Pertanahan Propinsi Riau
 Mr Thomas Larfo Dimiera
 Project Coordinator
 Not available
 ppidpuriau@gmail.com
 puprpkpp.riau.go.id
 Jalan S.M. Amin No. 92, Kelurahan Simpang Baru, Kecamatan
Tampan , Pekanbaru , 28292 , Riau , Indonesia
 Please contact by Email or Mail.

 Mr Muhamad Arief Setiawan


 Head Officer
 Not available
 ppidpuriau@gmail.com
 puprpkpp.riau.go.id
 Jalan S.M. Amin No. 92, Kelurahan Simpang Baru, Kecamatan
Tampan , Pekanbaru , 28292 , Riau , Indonesia
 Please contact by Email or Mail.

 Company Role: Tender Office


 Role Status: Appointed

 Remarks: -

Pemerintah Propinsi Riau - Biro Pengadaan Barang dan Jasa (BPBJ)

https://app-leadmanager.bcicentral.com/main/search 81/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Mr Rahmad Rahmadiyanto
 Head of Procurement Unit
 62 761 859 200 / 33736
 Kompleks Kantor Gubernur Riau, Gedung Menara Lancang Kuning
Lantai 6, Jalan Jendral Sudirman No. 460, Kelurahan Jadirejo,
Kecamatan Marpoyan Damai , Pekanbaru , 28156 , Riau ,
Indonesia

Architect/Designer

 Company Role: Landscape Consultant


 Role Status: Appointed
 Remarks: -

Multy Deseko CV
 Ms Fitriany
 Director
 62 813 6567 7779
 fitrianyst88@yahoo.co.id
 Jalan Gunung Raya Ujung Belang, Gang Ammar No. 2, RT 01 / RW
03, Kelurahan Rejosari, Kecamatan Tenayan Raya , Pekanbaru ,
28281 , Riau , Indonesia

 Mr Andan Mahariadi
 Design Team Leader
 Not available
 multydeseko17@gmail.com
 Jalan Gunung Raya Ujung Belang, Gang Ammar No. 2, RT 01 / RW
03, Kelurahan Rejosari, Kecamatan Tenayan Raya , Pekanbaru ,
28281 , Riau , Indonesia
 Please contact by Email or Mail.

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: To be appointed
 Tender Opening Date: 10 January 2023  Tender Closing Date: 16 January 2023
 Remarks: Qualification : Non small scale business. Qualification method : Post-qualification. The
aanwijzing (tender explanation) is scheduled on 12 January 2023. SBU :SP 015 & PB 010.

https://app-leadmanager.bcicentral.com/main/search 82/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Company Role: Construction Manager


 Role Status: To be appointed
 Tender Opening Date: 25 November 2022  Tender Closing Date: 02 December 2022
 Remarks: Administrative & technical evaluation in progress.

Other

 Company Role: Environmental Impact Assessment


 Role Status: Appointed

 Remarks: -

Riga Indonesia PT
 Mr Faiz Hanggi
 Environment Engineer
 Not available
 rigaindonesia@gmail.com
 Kompleks Perumahan Tiban Koperasi Blok E No. 39, Jalan P.
Diponegoro, Kelurahan Tiban Baru, Kecamatan Sekupang , Batam
, 29426 , Riau , Indonesia
 For enquiry, please contact by Email or Mail.

 Mr Muhammad Imannudin Hanggi


 Director
 62 812 7004 6614
 imanhanggi78@gmail.com
 Kompleks Perumahan Tiban Koperasi Blok E No. 39, Jalan P.
Diponegoro, Kelurahan Tiban Baru, Kecamatan Sekupang , Batam
, 29426 , Riau , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 83/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 7 10/01/2023 18:59


First Published: 27/02/2021 22:59

QUR'AN CENTRE PEKANBARU - MOSQUE BUILDING : LANDSCAPING


LANDSCAPING for MOSQUE - new
Kompleks Bandar Seni Raja Ali Haji / Purna MTQ, Jalan Jendral Sudirman, Kelurahan Simpang Tiga, Kecamatan
Bukit Raya, Pekanbaru, Riau 28282, Indonesia

Information

 Status: OPEN TENDERS FOR MAIN CONTRACT CANCELLED | OPEN TENDERS RE-ADVERTISED FOR MAIN CONTRACT |
CONTRACT EXPECTED TO BE AWARDED 30 JANUARY 2023 | OPEN TENDERS FOR CONSTRUCTION MANAGER
CLOSED | CONTRACT EXPECTED TO BE AWARDED 26 JANUARY 2023

 Project ID 208823002  Categories Infrastructure /


 Project Stage Pre-Construction Community & Cultural

 Project Status Tender Called  Subcategories Landscaping / Religious


Building
 Project Value Approximate 9,166.00m
IDR (0.58m USD)  DA Number -

 Town Pekanbaru  BCI Researcher M. Ibnu Sofyan Harahap

 Province Riau
 Region Sumatera

Overview

 Floor Area -  Main Contractor No


Appointed
 Site Area 10,000 Square Meters
 Storeys -  Main Contractor No
Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
208822002 - QUR'AN  Main Contractor 02 December 2022
CENTRE Tender Closing Date
PEKANBARU  Construction Start February 2023
(PHASE 1)
 Construction End September 2023
208824002 - QUR'AN
CENTRE
PEKANBARU -
WISMA QORI :
LANDSCAPING
208825002 - QUR'AN
CENTRE
PEKANBARU -
WISMA QORIAH

https://app-leadmanager.bcicentral.com/main/search 84/113
1/13/23, 2:21 PM LeadManager | BCI Central

208826002 - QUR'AN
CENTRE
PEKANBARU -
LIBRARY BUILDING

 Ownership Type Government


 Development Type New construction

Project Details
Landscaping for religious building (approx. 10,000
sq m site)
Entrance gates
Garden & public space
Walkways
At grade car park

https://app-leadmanager.bcicentral.com/main/search 85/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Government Implementing Agency


 Role Status: Appointed

 Remarks: -

Dinas Pekerjaan Umum, Penataan Ruang, Perumahan, Kawasan Permukiman dan


Pertanahan Propinsi Riau
 Mr Thomas Larfo Dimiera
 Project Coordinator
 Not available
 ppidpuriau@gmail.com
 puprpkpp.riau.go.id
 Jalan S.M. Amin No. 92, Kelurahan Simpang Baru, Kecamatan
Tampan , Pekanbaru , 28292 , Riau , Indonesia
 Please contact by Email or Mail.

 Mr Muhamad Arief Setiawan


 Head Officer
 Not available
 ppidpuriau@gmail.com
 puprpkpp.riau.go.id
 Jalan S.M. Amin No. 92, Kelurahan Simpang Baru, Kecamatan
Tampan , Pekanbaru , 28292 , Riau , Indonesia
 Please contact by Email or Mail.

 Company Role: Tender Office


 Role Status: Appointed

 Remarks: -

Pemerintah Propinsi Riau - Biro Pengadaan Barang dan Jasa (BPBJ)

https://app-leadmanager.bcicentral.com/main/search 86/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Mr Rahmad Rahmadiyanto
 Head of Procurement Unit
 62 761 859 200 / 33736
 Kompleks Kantor Gubernur Riau, Gedung Menara Lancang Kuning
Lantai 6, Jalan Jendral Sudirman No. 460, Kelurahan Jadirejo,
Kecamatan Marpoyan Damai , Pekanbaru , 28156 , Riau ,
Indonesia

Architect/Designer

 Company Role: Landscape Consultant


 Role Status: Appointed
 Remarks: -

Multy Deseko CV
 Ms Fitriany
 Director
 62 813 6567 7779
 fitrianyst88@yahoo.co.id
 Jalan Gunung Raya Ujung Belang, Gang Ammar No. 2, RT 01 / RW
03, Kelurahan Rejosari, Kecamatan Tenayan Raya , Pekanbaru ,
28281 , Riau , Indonesia

 Mr Andan Mahariadi
 Design Team Leader
 Not available
 multydeseko17@gmail.com
 Jalan Gunung Raya Ujung Belang, Gang Ammar No. 2, RT 01 / RW
03, Kelurahan Rejosari, Kecamatan Tenayan Raya , Pekanbaru ,
28281 , Riau , Indonesia
 Please contact by Email or Mail.

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: To be appointed
 Tender Opening Date: 10 January 2023  Tender Closing Date: 16 January 2023
 Remarks: Qualification : Non small scale business. Qualification method : Post-qualification. The
aanwijzing (tender explanation) is scheduled on 12 January 2023. SBU :SP 015 & PB 010.

https://app-leadmanager.bcicentral.com/main/search 87/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Company Role: Construction Manager


 Role Status: To be appointed
 Tender Opening Date: 25 November 2022  Tender Closing Date: 02 December 2022
 Remarks: Administrative & technical evaluation in progress.

Other

 Company Role: Environmental Impact Assessment


 Role Status: Appointed

 Remarks: -

Riga Indonesia PT
 Mr Faiz Hanggi
 Environment Engineer
 Not available
 rigaindonesia@gmail.com
 Kompleks Perumahan Tiban Koperasi Blok E No. 39, Jalan P.
Diponegoro, Kelurahan Tiban Baru, Kecamatan Sekupang , Batam
, 29426 , Riau , Indonesia
 For enquiry, please contact by Email or Mail.

 Mr Muhammad Imannudin Hanggi


 Director
 62 812 7004 6614
 imanhanggi78@gmail.com
 Kompleks Perumahan Tiban Koperasi Blok E No. 39, Jalan P.
Diponegoro, Kelurahan Tiban Baru, Kecamatan Sekupang , Batam
, 29426 , Riau , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 88/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 4 10/01/2023 18:55


First Published: 02/12/2022 18:28

GUDANG MODERN-DC SURABAYA


WAREHOUSE - new - single storey
Jalan Panjang Jiwo, Kelurahan Panjang Jiwo, Kecamatan Tenggilis Mejoyo, Surabaya, East Java 60299, Indonesia

Information

 Status: OPEN TENDERS FOR MAIN CONTRACT CANCELLED | OPEN TENDERS RE-ADVERTISED FOR MAIN CONTRACT |
CONTRACT EXPECTED TO BE AWARDED FEBRUARY 2023 | OPEN TENDERS FOR SUPERVISORY CONSULTANT CLOSED
| CONTRACT EXPECTED TO BE AWARDED FEBRUARY 2023

 Project ID 224655002  Categories Industrial


 Project Stage Pre-Construction  Subcategories Warehousing & Logistics
 Project Status Tender Called  DA Number -
 Project Value Approximate 42,039.00m  BCI Researcher Andiyan Rianditya
IDR (2.68m USD)
 Town Surabaya
 Province East Java
 Region Java

Overview

 Floor Area -  Main Contractor No


Appointed
 Site Area -
 Storeys 1 storeys  Main Contractor No
Listed
 Units Industrial units - 1
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
 Main Contractor 13 January 2023
 Ownership Type Commercial Tender Closing Date
 Development Type New construction
 Construction Start March 2023
 Construction End August 2023

Project Details
Single storey warehouse
Storage area
Loading bays
Administrative office
Sales area

https://app-leadmanager.bcicentral.com/main/search 89/113
1/13/23, 2:21 PM LeadManager | BCI Central

Wholesale
Packaging system installation
Cold storage

Building elements include:


Flooring : ceramic tile / hardened concrete floor
Structural : steel construction
Ceiling : metal ceiling
Walling : light brick walls / metal walling
Facade : aluminium composite cladding / metal
cladding
Roofing : metal sheet roofing
Roof truss : steel frame
Aluminium framed doors & windows / rolling
doors / folding gates
Sanitary ware / plumbing

https://app-leadmanager.bcicentral.com/main/search 90/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Government Implementing Agency


 Role Status: Appointed

 Remarks: -

Perusahaan Umum Badan Urusan Logistik (aka Perum Bulog)


 Mr Mokhamad Suyamto
 Director of Supply Chain & Public Services
 62 21 525 2209
 www.bulog.co.id
 Jalan Jendral Gatot Subroto Kavling 49, Kelurahan Kuningan
Timur, Kecamatan Setiabudi , Jakarta Selatan , 12950 , Special
Capital Region of Jakarta , Indonesia

 Company Role: Supervisory Consultant


 Role Status: To be appointed
 Remarks: Administrative & technical evaluation in progress.

 Company Role: Tender Office


 Role Status: Appointed

 Remarks: -

Perusahaan Umum Badan Urusan Logistik (aka Perum Bulog)


 Ms Veronika
 Goods and Services Division Staff
 62 822 1339 9967 / 62 21 525 2209 (ext. 2524)
 divisi.barjas@bulog.co.id
 www.bulog.co.id
 Jalan Jendral Gatot Subroto Kavling 49, Kelurahan Kuningan
Timur, Kecamatan Setiabudi , Jakarta Selatan , 12950 , Special
Capital Region of Jakarta , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor

https://app-leadmanager.bcicentral.com/main/search 91/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Role Status: To be appointed


 Tender Opening Date: 06 January 2023  Tender Closing Date: 13 January 2023
 Remarks: Qualification : Non small scale business. Qualification method : Pre-qualification. SBU BG003
BG004 BG009 BG002 MK001 IN008 EL010.

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 92/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 3 10/01/2023 18:52


First Published: 20/12/2021 19:46

SERANG ELECTRICAL SUBSTATION


ELECTRICAL SUBSTATION - upgrade
Jalan Magelaran No.63, Kelurahan Terondol, Kecamatan Serang, Kota Serang, Banten 42119, Indonesia

Information

 Status: MAIN CONTRACT AWARDED | CONSTRUCTION EXPECTED TO COMMENCE FEBRUARY 2023

 Project ID 215129002  Categories Utilities


 Project Stage Pre-Construction  Subcategories Power Station, Electricity
 Project Status Contract Awarded / Builder Distribution / Substation
Appointed  DA Number -
 Project Value Confirmed 72,693.00m IDR  BCI Researcher Adhi Rachma Kanitra
(4.66m USD) Wardhana
 Town Kota Serang
 Province Banten
 Region Java

Overview
 Floor Area -  Main Contractor Yes
Appointed
 Site Area -
 Storeys -  Main Contractor Yes
Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
185564002 -  Main Contractor -
SERANG SELATAN / Tender Closing Date
BAROS ELECTRICAL  Construction Start February 2023
SUBSTATION (150
 Construction End Quarter 4, 2023
KV)

 Ownership Type Commercial


 Development Type Refurbishment

Project Details
Electrical substation (capacity of 150 kilovolt (kV))

https://app-leadmanager.bcicentral.com/main/search 93/113
1/13/23, 2:21 PM LeadManager | BCI Central

Electrical power transformer (capacity of 2 line


bay)
Primary & secondary power lines
Ground wire
Overhead lines
Disconnect switch
Circuit breaker
Lightning arrester
Control building
Security fence

https://app-leadmanager.bcicentral.com/main/search 94/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Perusahaan Listrik Negara (Persero) PT - Unit Induk Pembangunan Jawa Bagian Barat
(UIP V)
 Mr Octavianus Padudung
 General Manager
 62 21 753 5500 / 754 3554
 pengadaan.uip.v@gmail.com
 www.pln.co.id
 Jalan Ehave, Kelurahan Gandul, Kecamatan Cinere , Depok ,
16514 , West Java , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed

 Remarks: -

Citramasjaya Teknikmandiri PT
 Mr Alar
 Staff of Procurement
 62 21 2278 8700 / 2278 8889
 admin.proc@citramas.co.id
 www.citramas.co.id
 Gedung Menara 165 Lantai 16, Jalan TB. Simatupang, Kavling 1,
Kelurahan Cilandak Timur, Kecamatan Pasar Minggu , Jakarta
Selatan , 12560 , Special Capital Region of Jakarta , Indonesia

 Mr Ahmad Fahmi
 Director
 62 21 2278 8700 / 2278 8889
 citramas@citramas.co.id
 www.citramas.co.id
 Gedung Menara 165 Lantai 16, Jalan TB. Simatupang, Kavling 1,
Kelurahan Cilandak Timur, Kecamatan Pasar Minggu , Jakarta

https://app-leadmanager.bcicentral.com/main/search 95/113
1/13/23, 2:21 PM LeadManager | BCI Central

Selatan , 12560 , Special Capital Region of Jakarta , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 96/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 3 10/01/2023 18:50


First Published: 26/08/2019 19:40

SERANG - SERANG SELATAN/BAROS ELECTRICAL SUBSTATION (150 KV)


TRANSMISSION LINES - new
Kelurahan Tejamari, Kecamatan Baros, Kabupaten Serang, Banten 42173, Indonesia

Information

 Status: MAIN CONTRACT AWARDED | CONSTRUCTION EXPECTED TO COMMENCE FEBRUARY 2023

 Project ID 193069002  Categories Utilities / Infrastructure


 Project Stage Pre-Construction  Subcategories Power Station, Electricity
 Project Status Contract Awarded / Builder Distribution / Civil Works,
Appointed Excavation / Radio, TV
Station, Optical
 Project Value Confirmed 74,375.00m IDR
Fibre/Transmitting Tower
(4.76m USD)
 DA Number -
 Town Kabupaten Serang
 BCI Researcher Adhi Rachma Kanitra
 Province Banten
Wardhana
 Region Java

Overview
 Floor Area -  Main Contractor Yes
Appointed
 Site Area -
 Storeys -  Main Contractor Yes
Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
 Main Contractor -
 Ownership Type Commercial Tender Closing Date
 Development Type New construction
 Construction Start February 2023
 Construction End October 2023

Project Details
High-voltage transmission lines (capacity of 150
kV)
Type of conductor : 2 cct with 60 kilometer sirkuit
(kms)
Link Serang - Serang Selatan/Baros
Latticed steel tower

https://app-leadmanager.bcicentral.com/main/search 97/113
1/13/23, 2:21 PM LeadManager | BCI Central

Foundation work
Tower erection
Commissioning test

https://app-leadmanager.bcicentral.com/main/search 98/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Perusahaan Listrik Negara (Persero) PT - Unit Induk Pembangunan Jawa Bagian Barat
(UIP V)
 Mr Octavianus Padudung
 General Manager
 62 21 753 5500 / 754 3554
 pengadaan.uip.v@gmail.com
 www.pln.co.id
 Jalan Ehave, Kelurahan Gandul, Kecamatan Cinere , Depok ,
16514 , West Java , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed

 Remarks: -

Bukaka Teknik Utama Tbk PT (member of Bukaka group)


 Mr Mawardi Maliki
 Procurement Manager
 62 21 823 2323 / 823 1146
 mawardi@bukaka.com
 www.bukaka.com
 Kompleks Bukaka Industrial, Jalan Raya Bekasi Narogong Km.
19,5, Limus Nunggal, Kecamatan Cileungsi , Kabupaten Bogor ,
16820 , West Java , Indonesia

 Mr Teguh Wicaksana Sari


 Director & Corporate Secretary
 62 21 823 2323 / 823 1146
 corsec@bukaka.com
 www.bukaka.com
 Kompleks Bukaka Industrial, Jalan Raya Bekasi Narogong Km.
19,5, Limus Nunggal, Kecamatan Cileungsi , Kabupaten Bogor ,

https://app-leadmanager.bcicentral.com/main/search 99/113
1/13/23, 2:21 PM LeadManager | BCI Central

16820 , West Java , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 100/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 1 10/01/2023 18:49


First Published: 10/01/2023 18:49

SOFIA CLUSTER @ RAJEG (PHASE 2)


HOUSES (40) - new - single storey
Jalan Sindang Jawaringan Kelurahan Sukamanah, Kecamatan Rajeg, Kabupaten Tangerang, Special Capital
Region of Jakarta 15540, Indonesia

Information

 Status: DEVELOPER BUILDER LISTED

 Project ID 225935002  Categories Residential


 Project Stage Pre-Construction  Subcategories House, Villa, Bungalow /
 Project Status Contract Awarded / Builder Residential Estate
Appointed  DA Number -
 Project Value Estimated 7,200.00m IDR  BCI Researcher Shabrina Hasnadhiya
(0.46m USD) Retnoasih
 Town Kabupaten Tangerang
 Province Special Capital Region of
Jakarta
 Region Java

Overview

 Floor Area 1,200 Square Meters  Main Contractor Yes


Appointed
 Site Area -
 Storeys 1 storeys  Main Contractor Yes
Listed
 Units Residential units - 40
 Main Contractor Non-Tender
 Green Building -
Appointment Method
 Related Projects
225934002 - SOFIA  Main Contractor -
CLUSTER @ RAJEG Tender Closing Date
 Construction Start Quarter 1, 2024
 Ownership Type Commercial
 Construction End Quarter 4, 2024
 Development Type New construction

Project Details
40 single storey residential houses (single type of
houses : approx. 30 sq m)
Units to have 2 bedrooms

https://app-leadmanager.bcicentral.com/main/search 101/113
1/13/23, 2:21 PM LeadManager | BCI Central

Internal road network


Communal garden
Perimeter fence walls

Building elements include:


Flooring : ceramic tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : lightweight steel
Fabricated wood doors & windows
Sanitary ware / plumbing

https://app-leadmanager.bcicentral.com/main/search 102/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Anugrah Seribu Dinar Persada PT


 Ms Tia
 Administration Officer
 62 81 1957 8088
 Perumahan Grand Harmoni 2 Blok A6 No.1-2 Jalan Saga-Bunar,
Kampung Kopo, Kelurahan Bunar, Kecamatan Sukamulya, ,
Kabupaten Tangerang , 15610 , Banten , Indonesia

Architect/Designer

 Company Role: Architect
 Role Status: Appointed

 Remarks: -

Anugrah Seribu Dinar Persada PT


 Mr Rian Sasmita
 Technical Officer
 62 81 1957 8088
 riansasmita.work@gmail.com
 Perumahan Grand Harmoni 2 Blok A6 No.1-2 Jalan Saga-Bunar,
Kampung Kopo, Kelurahan Bunar, Kecamatan Sukamulya, ,
Kabupaten Tangerang , 15610 , Banten , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed
 Remarks: -

Anugrah Seribu Dinar Persada PT


 Mr Zainal Mustafa

https://app-leadmanager.bcicentral.com/main/search 103/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Project Manager
 62 81 1957 8088
 znltkb32007@gmail.com
 Perumahan Grand Harmoni 2 Blok A6 No.1-2 Jalan Saga-Bunar,
Kampung Kopo, Kelurahan Bunar, Kecamatan Sukamulya, ,
Kabupaten Tangerang , 15610 , Banten , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 104/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 5 10/01/2023 18:45


First Published: 25/08/2022 16:34

LIPPO KARAWACI - CENDANA HOMES : CENDANA BOTANIC CLUSTER (PHASE 1)


HOUSES (362) - new - 2 storey
Jalan Diklat Pemda, Kelurahan Bojong Nangka, Kecamatan Kelapa Dua, Kabupaten Tangerang, Special Capital
Region of Jakarta 15810, Indonesia

Information

 Status: MAIN CONTRACTOR APPOINTED BY NEGOTIATION | CONSTRUCTION EXPECTED TO COMMENCED MARCH


2023 | ROAD WORK CONTRACTOR LISTED

 Project ID 221030002  Categories Residential / Infrastructure


 Project Stage Pre-Construction  Subcategories House, Villa, Bungalow /
 Project Status Contract Awarded / Builder Landscaping / Residential
Appointed Estate / Road, Surface, Car
Park
 Project Value Estimated 140,030.00m
IDR (8.93m USD)  DA Number -

 Town Kabupaten Tangerang  BCI Researcher Hanny Sekar Utami

 Province Special Capital Region of


Jakarta
 Region Java

Overview

 Floor Area 25,460 Square Meters  Main Contractor Yes


Appointed
 Site Area -
 Storeys 2 storeys  Main Contractor Yes
Listed
 Units Residential units - 362
 Main Contractor Non-Tender
 Green Building -
Appointment Method
 Related Projects
221032002 - LIPPO  Main Contractor -
KARAWACI - Tender Closing Date
CENDANA HOMES :  Construction Start March 2023
CENDANA BOTANIC
 Construction End March 2024
SHOPHOUSES
221031002 - LIPPO
KARAWACI -
CENDANA BOTANIC
CLUSTER : BOTANIC
NATURE
221033002 - LIPPO
KARAWACI -

https://app-leadmanager.bcicentral.com/main/search 105/113
1/13/23, 2:21 PM LeadManager | BCI Central

CENDANA HOMES :
CENDANA BOTANIC
CLUSTER (PHASE 2)

 Ownership Type Commercial


 Development Type New construction

Project Details
362 x 2 storey residential houses (3 types of
houses : approx. 55, 68 & 88 sq m)
Units to have 2 & 3 bedrooms
Internal road network
Landscaping
Roadworks

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : lightweight steel
Aluminium framed doors & windows / fabricated
wood doors
Piling : mini pile
Sanitary ware / plumbing

Estimated 12 months project

https://app-leadmanager.bcicentral.com/main/search 106/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Lippo Karawaci Tbk PT


 Mr Aradea Hadi
 Head of Procurement
 62 21 2566 9000
 www.lippokarawaci.co.id
 7 Boulevard Palem Raya #22-00, Menara Matahari Lippo
Karawaci Central, Kelurahan Kelapa Dua, Kecamatan Tangerang ,
Kabupaten Tangerang , 15811 , Banten , Indonesia

 Ms Devi Ardhiani
 Procurement Administrator
 62 21 2566 9000
 www.lippokarawaci.co.id
 7 Boulevard Palem Raya #22-00, Menara Matahari Lippo
Karawaci Central, Kelurahan Kelapa Dua, Kecamatan Tangerang ,
Kabupaten Tangerang , 15811 , Banten , Indonesia

Architect/Designer

 Company Role: Architect
 Role Status: Appointed
 Remarks: -

Genius Loci Asia PT (aka Genius Loci Architect) - Jakarta


 Ms Dita Octariana
 General Administration Officer
 62 21 535 9989
 dita_octariana@ymail.com
 Jalan H. Kelik No. 16A, RT 03 / RW 08, Kelurahan Kelapa Dua,
Kecamatan Kebon Jeruk , Jakarta Barat , 11550 , Special Capital
Region of Jakarta , Indonesia

 Mr Alex Bayu Saputra

https://app-leadmanager.bcicentral.com/main/search 107/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Principal Architect
 62 21 535 9989
 Jalan H. Kelik No. 16A, RT 03 / RW 08, Kelurahan Kelapa Dua,
Kecamatan Kebon Jeruk , Jakarta Barat , 11550 , Special Capital
Region of Jakarta , Indonesia

 Company Role: Landscape Consultant


 Role Status: Appointed

 Remarks: -

Sheils Flynn Asia - Indonesia


 Ms Nur Chairun Nisa
 Project Administration Staff
 62 251 832 6222
 adminsfa@sheilsflynn.com
 www.sheilsflynnasia.com
 Jalan Bogor Baru Blok A 5 No. 8, Desa Tegallega, Kecamatan
Bogor Tengah , Kabupaten Bogor , 16121 , West Java , Indonesia

 Mr Wondo Hendratmo
 Senior Landscape Architect
 62 251 832 6222
 wondo@sheilsflynnasia.com
 www.sheilsflynnasia.com
 Jalan Bogor Baru Blok A 5 No. 8, Desa Tegallega, Kecamatan
Bogor Tengah , Kabupaten Bogor , 16121 , West Java , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed
 Remarks: -

Bangun Prima Sentosa PT


 Ms Diana W
 Purchasing Staff
 62 21 5439 5721
 materialbps@gmail.com
 Jalan Taman Semanan Indah Blok C No. 29, Kelurahan Duri
Kosambi, Kecamatan Cengkareng , Jakarta Barat , 11750 ,

https://app-leadmanager.bcicentral.com/main/search 108/113
1/13/23, 2:21 PM LeadManager | BCI Central

Special Capital Region of Jakarta , Indonesia

 Company Role: Road Work Contractor


 Role Status: Appointed

 Remarks: -

Mandrosa Sukses PT
 Mr Hardy Suryana
 Project Manager
 62 21 5531 007
 mandrosa.sukses@yahoo.com
 Jalan Sentosa I No.57 Kelurahan Sukarasa, Kecamatan
Tangerang , Kota Tangerang , 15111 , Banten , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 109/113
1/13/23, 2:21 PM LeadManager | BCI Central

Timestamp: Project Version 2 10/01/2023 18:45


First Published: 21/12/2022 19:28

KTT LAUTAN BAJA INDONESIA HIGH-VOLTAGE TRANSMISSION LINES (150 KV)


TRANSMISSION LINES - new
Kelurahan Sukatani, Kecamatan Cikande, Kabupaten Serang, Banten 42186, Indonesia

Information

 Status: MAIN CONTRACT AWARDED | CONSTRUCTION EXPECTED TO COMMENCE FEBRUARY 2023

 Project ID 224666002  Categories Utilities


 Project Stage Pre-Construction  Subcategories Power Station, Electricity
 Project Status Contract Awarded / Builder Distribution / Radio, TV
Appointed Station, Optical
Fibre/Transmitting Tower
 Project Value Confirmed 51,691.00m IDR
(3.31m USD)  DA Number -

 Town Kabupaten Serang  BCI Researcher Adhi Rachma Kanitra


Wardhana
 Province Banten
 Region Java

Overview
 Floor Area -  Main Contractor Yes
Appointed
 Site Area -
 Storeys -  Main Contractor Yes
Listed
 Units -
 Main Contractor Tender
 Green Building -
Appointment Method
 Related Projects
 Main Contractor -
 Ownership Type Commercial Tender Closing Date
 Development Type New construction
 Construction Start February 2023
 Construction End Quarter 4, 2023

Project Details
High-voltage transmission lines 150 kilo volt
amper (kV))
Electrical power transformer (capacity of 2 Line
Bay)
Link New GI Puncak Ardi Mulya
Primary & secondary power lines

https://app-leadmanager.bcicentral.com/main/search 110/113
1/13/23, 2:21 PM LeadManager | BCI Central

Ground wire
Overhead lines
Disconnect switch
Circuit breaker

https://app-leadmanager.bcicentral.com/main/search 111/113
1/13/23, 2:21 PM LeadManager | BCI Central

Project Contacts

Developer/Property Manager

 Company Role: Developer
 Role Status: Appointed

 Remarks: -

Perusahaan Listrik Negara (Persero) PT - Unit Induk Pembangunan Jawa Bagian Barat
(UIP V)
 Mr Octavianus Padudung
 General Manager
 62 21 753 5500 / 754 3554
 pengadaan.uip.v@gmail.com
 www.pln.co.id
 Jalan Ehave, Kelurahan Gandul, Kecamatan Cinere , Depok ,
16514 , West Java , Indonesia

Main Contractor

 Company Role: Builder / Main Contractor


 Role Status: Appointed

 Remarks: -

Citicon Adhi Nugraha PT


 Mr Ari Rusdiarto
 Director
 62 21 5367 0077
 project@citicon.co.id
 Menara Citicon, 8th & 20th Floor, Jalan Letjen S. Parman Kavling
72, Kelurahan Slipi, Kecamatan Palmerah , Jakarta Selatan ,
11410 , Special Capital Region of Jakarta , Indonesia

https://app-leadmanager.bcicentral.com/main/search 112/113
1/13/23, 2:21 PM LeadManager | BCI Central

 Ms Hanka
 Project Administrator
 62 21 5367 0077
 project@citicon.co.id
 Menara Citicon, 8th & 20th Floor, Jalan Letjen S. Parman Kavling
72, Kelurahan Slipi, Kecamatan Palmerah , Jakarta Selatan ,
11410 , Special Capital Region of Jakarta , Indonesia

Other Information

 My Project Pipeline Folder: -


 Team Project Pipeline Folders: -
 Alert Me: No

DO NOT FORWARD this PDF without permission. No portion of the content may be forwarded, copied, published,
 reproduced, displayed, sold, or redistributed in any medium without proper authorization

Your Account Manager: Muntahani Zakiya (AE) Wulandari | wulandari@bcicentral.com

https://app-leadmanager.bcicentral.com/main/search 113/113

You might also like