You are on page 1of 7
Technical Proposal for Natural Gas Power Plant: 8 x 4.3 MWe s. Technical data 4900 kWel; 11000 V, 0 He; Natural gas, MWWMl MN = 80, Mw iM Design conattions Fuel gas data: Cond arose Haris rors 5/80 MlMetane eer 1 » sate oa ao Leveeaontevie: (ngs) 020 Esha tarp. sar bat exchange ra 12 Gredersty gins) 080 ovens derance-o8) ‘rom =o tac a ng Genset nae reozesav, past [Nip se0 Cornuanon rer tnd i vis Bore Stoke Capea neni (dn?) 260(320/272 Carpesin ao ry ‘2 san ton spec: il “ Nea hte coum a illo inv as Enghemanegenentsysen nm renee ean otnge ange emer Mrsrha) too 410/50 Speed in 100 s Energy balance ose ™ 100 2 ei sener COP ee 190 55201 wn 4300 ss 2160 Gener efeencyvineasPhi= he ps m9 or ona Ergoe pone ce 150 $0481 won a0 Eran inet water het en a8) eat Inreslr Theat so) 8 Ube ht ors) 6 het ot se ea exchange res) as hast rperanre ra 0 thet mate oat on) 2s Centum nats ow -180 3048 ben) 2s Faction eat erin gorrso, en ao 20/90 Fut eosinetion en sox} 10238 siecres macnn arma ete ms sagvaaeias2 Se enc pm m2 ‘system parameters eriionarfov(onh ane oat™ EK igh team Centntn eevee rn See ta 38 inset 218 wet : 2xcopena gs co a eb a 02 inte! 201200 Pret pe cnsttsancaba ten bal asir0 ‘toe re! mene Uesyimd 2/30 coer bere ery Ue coe gin be are ba ‘te Brahe aaee ome ba seen 03 Cooling system ‘ize conten engine jacket water inerosier mV 0/35 Water vlume engine act intercoler, ier 570/51 KVS | Cv value engine jacket water / intercooler: [eh 63/62 aces ater colt epee n/ rei 73/0 Inereclercolant temperature / out re 40/40 Engine jacket water flow rate from /to: rn?) 105/130 Water flow rate engine jacket water / intercooler, [oh 124/85, Water pressure lous engine jacket water eros: el waa Lae ci trp. engine in ax. be low rt evan) 20/128 Proposal Report for 18 MWe Power Plant setup at Cairn India Site. BLACK STONE TERRY ENGINEERING COMPANY SYSTEM INTEGRATORS & EPC CONTRACTORS Natural gas Fired Power Plant 34.70 MW with 8 x MWM TCG 2032V16 gas generating sets This power plant was commissioned in November 2012 with six units of MWM 4.3 MW gas generators. In year 2014 two more MWM 4.3 MW units were added to the plant along with 8 steam heat recovery boilers (one for each generating set), and 4.45 MW steam turbine with complete water treatment and steam system making this plant as Combined Cycle Power Plant with total net capacity of 34.70 MW at 34 kV. Electric production was stopped in December 2017 and plant is kept hot and powered. Authorized MWM service company has made all services to these units using only original MWM parts. Today total operating hours for 6 older units is around 12 000 hours and for two newer units around 7000 hours. Equipment is in excellent condition as you can see attached very recent pictures. No any unnormal problems has occurred during operation. Power Plant in Nut Shell: Sr.No. | Description of Parameter Details 1 Type of gas engines MWM TCG 203216 2 Number of generating units installed 8 3 Manufacturing year of first 6 units 2012 4 Electrical Power of each unit of first 6 units 4,3 MWe 5 Manufacturing year of remaining 2 units 2014 6 Electrical Power of two new units 4.45 MWe 7 Net Electrical Output of All 8 units combined 34.4 8 Steam Production at 100% load 22 TPH at 18 bar (352 °C) 9 Net Electrical Efficiency in combination cycle 46.00% 10 Net Electrical Efficiency in single cycle 42.00% 11 Natural Gas Consumption at 100% load (approx.) 8536 Nm#/hour 12 Engine Manufacturer Name wm 13. Engine Rotational Speed (RPM) 1000 14 Number of Cylinders in each engine 16 15 Alternator Manufacturer AvK 16 Alternator Model Avk DIG 156 m6 17 Alternator Rated Power 5336 kVA @ 0.8 pf 18 Alternator Operating parameters 1AKV, 50 Hz @ 750 RPM Proposal Report for 18 MWe Power Plant setup at Cairn India Site. BLACK STONE TERRY ENGINEERING COMPANY SYSTEM INTEGRATORS & EPC CONTRACTORS Image of power plant from inside with 3 engines in view Proposal Report for 18 MWe Power Plant setup at Cairn India Site. BLACK STONE TERRY ENGINEERING COMPANY SYSTEM INTEGRATORS & EPC CONTRACTORS Close up of engine from engine side Proposal Report for 18 MWe Power Plant setup at Cairn India Site. BLACK STONE TERRY ENGINEERING COMPANY SYSTEM INTEGRATORS & EPC CONTRACTORS Close Up of Generating set control panels Power plant cooling system Proposal Report for 18 MWe Power Plant setup at Cairn India Site. BLACK STONE TERRY ENGINEERING COMPANY SYSTEM INTEGRATORS & EPC CONTRACTORS RO filtration plant for cooling plant Proposal Report for 18 MWe Power Plant setup at Cairn India Site. BLACK STONE TERRY ENGINEERING COMPANY SYSTEM INTEGRATORS & EPC CONTRACTORS vvyvy ne Key points for consideration Plant is ready to be dismantled and shipped, 4.10 5 units will be required to meet the needs Dismantling of each unit will take around 5-7 days of time. Dismantling & packaging of 4-5 units will take around 30 days of time. Transit from the source to Kandla Port will take around 32-35 days. Unpacking of unit and preparation of site will take 45-60 days. Installation & Commissioning of units on site will take 45-60 days. Complete project will take around 6-8 months for completion. Proposal Report for 18 MWe Power Plant setup at Cairn India Site. BLACK STONE TERRY ENGINEERING COMPANY SYSTEM INTEGRATORS & EPC CONTRACTORS

You might also like