Sanctioned Projects Under JnNURM for Surat City - Progress Till Jan End 2016 (Rs.

in Cr)
Sr. No. Name of Project Project Cost Physical Status Expenditure till
Sanctioned by Govt of (Independently date
India evaluated)

Sub-Mission-I : Urban Infrastructure & Urban Governance


1 Upgradation of Anjana Sewage Treatment Plant 10.98 100% 15.72

2 Augmentation of Adajan Sewerage System 11.93 100% 12.57

3 Augmentation of Bhesan Sewage Treatment Plant 15.09 100% 27.77

4 Secondary Sewage Treatement Plant at Bamroli (100 MLD) 13.22 100% 18.57

5 Proposed Sewerage system for T.P. Schemes No. 1, 2, 3, 4, 34.37 100% 50.58
5, 6, 7 and 13 for Vesu of SUDA AREA (Phase -I up to 2019
AD)
6 Proposed Sewerage system for T.P. Schemes No. 8, 9, 10, 21.28 100% 34.09
14, 15, 16 of Pal-Palanpor of SUDA area

7 SewerageSystem for New Eastern Zone of SMC 110.65 100% 108.22

8 Automation/ SCADA of existing sewage pumping stations 30.63 100% 34.28


and sewage treatment plants of SMC.

9 Sewerage System in new Northern Zone area of Surat 184.04 100% 177.59
Municipal Corporation
10 Storm Water Drainage Scheme in Vesu 49.95 100% 60.61

11 Storm Water Drainage Scheme of Surat city for SMC area. 116.62 100% 147.25

12 Storm Water System for New Eastern Zone of SMC 34.26 100% 36.41

13 Water Supply Distribution systems for T.P. Schemes No. 1 19.19 100% 17.52
to 7 of Vesu of SUDA area (Phase -I up to 2019 AD)

14 Water Supply Distribution systems for T.P. Schemes No. 8, 9.95 100% 10.84
9, 10, 14, 15, 16 of Pal-Palanpor of SUDA area (Phase -I up to
2019 AD)

15 Augmentation of Sarthana, Katargam and Rander water 140.68 100% 148.96


works of SMC.
16 Water supply scheme for new North Zone of SMC 167.43 100% 163.50

17 Water supply distribution system for south east zone areas 201.09 98% 218.86
of SMC
18 Proposed Bridge across River Tapi joining Dabholi and 65.00 100% 93.82
Jahangirpura
19 Fly-over bridge near Nana Varachha 7.58 100% 8.70

20 Fly-over bridge on Kapodara fire station junction 9.32 100% 9.80

21 Bridge across Kankara Khadi between Udhna Magdalla road 8.41 100% 9.02
and Bamroli

22 Construction of 4 lane Railway over bridge on Sachin 20.77 100% 17.05


Magdala State Highway in SUDA area

23 BRTS plan for Surat 469.02 100% 477.05

24 Upgradation of Solid Waste Management in Surat City 52.50 100% 58.94

25 WTP,Transmission line & storage reservoir for water supply 49.14 92% 43.90
system of east zone of Surat
26 Augmentation of Karanj sewerage treatment plant under 57.23 100% 75.17
east drainage zone of Surat
27 Water Supply System for West & South West Zone of SMC 94.94 50% 29.15

Total (Sub-Mission-I) 2005.27 2105.94


Sanctioned Projects Under JnNURM for Surat City - Progress Till Jan End 2016 (Rs. in Cr)
Sr. No. Name of Project Project Cost Physical Status Expenditure till
Sanctioned by Govt of (Independently date
India evaluated)

Sub-Mission-II : Basic Services to Urban Poor (BSUP)

28 DPR-I : Detail Project for Slum Relocation 62.74 100% 68.09


Total Housing for Urban Poor:5572 Nos.
( 20 Different sites)
29 DPR-II : Detail Project for Slum Relocation 56.45 100% 69.60
Total Housing for Urban Poor:5424 Nos.
(Bhestan)
30 DPR-III : E.W.S. Housing at Kosad, Surat Total housing units 72.03 100% 83.25
:5280 Nos
31 DPR-IV : E.W.S. Housing at Kosad, Surat Total housing 91.49 100% 112.72
units :6752 Nos
32 DPR-V : Housing for Urban Poor at Kosad Total housing 98.87 91% 107.75
units :7392 Nos
33 DPR-VI: Construction of Housing Units for Urban Poor at 11 61.66 100% 86.40
various locations of Surat

34 DPR-VII : Construction of Housing Units for Urban Poor at 114.24 100% 147.49
15 various locations of Surat

35 DPR-VIII:Redevelopment of Bhimnagar Vasahat 29.48 100% 35.68


R.S.No.150,Udhana Udyognagar Sangh,Surat

36 DPR-IX: Construction of Housing Under Redevelopment 23.76 100% 28.93


Scheme at Kamrunagar Vasahat, Surat

37 DPR-X:Construction of 2240 Houses at Four Locations of 60.95 100% 74.55


Surat City For Rehabilitation of Urban/Poor ,Surat.

38 DPR-XI Upgradationof environment at kosad & Bhestan 10.58 94% 9.75

39 DPR-XII Redevelopment at Ektanagar adajan 17.02 100% 24.09

Total (Sub-Mission-II) 699.27 848.30

Total (Rs.in Crores) 2704.54 2954.24