You are on page 1of 2

AQUATIC CENTRE AQUATIC CENTRE

COMPANYbudget
Construction AQUATIC CENTRE
SPORTS
Based in Lorient,
Usetotal
of bio-based our company
materials Use of sustainable wood and
The cost of the operation
specializes in the design and *swimming
recycled plastic
CONSTRUCTION
and photovoltaic
amounts panels
to 174.7 million
manufacture of large ecological
euros The
aquatic center will be directly
buildings.
The futureWe choose
aquatic a bioclimatic
centre will be an The wood structuring the framework PROJECT
accessible from the Stade de France by
design, the
example use of bio-based
of energy performance. comes from sustainably managed
a footbridge, the cost of which of 20
materials
More thanand thetons
1200 useof
ofbio-based
local forests of French and European origin
million euros is included in the 147
resourceswill
materials as abe
priority. These choices
incorporated and its exclusively. Similarly, the furniture in
million euros that represents the cost
allowcovered
roof a high energy performance
with photovoltaic for
panels restaurants, bars and entrances will be
of the construction site. In Olympic
a low
on ecological
5000 footprint
m2 will make it one of the made from wood while the stands will
configuration, it will accommodate
largest urban solar installations in be built of recycled plastic collected in
6000 spectators for an area of 2.6
France . . the schools of Saint-Denis (about 8.5
hectares
tons).
HERITAGE *water-polo
After the Games, it will become a
public sports facility in a department,
Seine-Saint-Denis. From summer 2025,
the Olympic and diving pools will be
accessible for the sum of 4.80 euros
for adults from 16 years old, 3.60
euros for children from 3 to 15 years
old, students and job seekers of 1.50
euros and free for children from 0 to 2
years old

You might also like