Professional Documents
Culture Documents
AutoCAD Project Assignment (Okt 2021 - Feb 2022)
AutoCAD Project Assignment (Okt 2021 - Feb 2022)
OBJECTIVE:
A drawing is a blueprint of a building or civil engineering works and act as communication tools
between the construction industry players. There is many information can be retrieved from the
blueprint of the particular project.
In this activity, the students are requiring to study the element of architectural, structural and civil
engineering infrastructure in the blueprint of a building. They also need to identify the difference
between architectural, structural and civil engineering drawing. The students also are trained to
communicate using this medium and at the same time they need to explain the drawing to ensure that
they understand what they draw and produce. This is important because before we decide to
construct the structure, supposedly we must do understand on how to read and draw the drawing.
LEARNING OUTCOMES:
1. Able to understand the basic and theoretical aspects of real architectural, structural and civil
engineering drawing.
2. Able to describe the basic element of architectural, structural and civil engineering in the perspective
blueprint.
3. Able to produce basic architectural, structural and civil engineering drawing by using CAD system.
SCENARIO:
i) Each group is required to find a set of drawing consist of architectural, structural and civil engineering
drawing from the construction industry’s player. The students need to work in a group of THREE - FOUR
members. Every group must reproduce a set of drawing consist of architectural, structural and
infrastructure drawing by using AutoCAD software accordance to the selected drawing.
iii) Based on the project searched, define and describe the project in term of type of project, parties
involved and the list of principal drawing available. The principal drawings of the structure built are
often described as being the architectural, structural and civil engineering drawings are listed below:
Activity I-O
Structure structured
Solution known
Duration days/week
i) Front page – Consist of name of project, name of group members, ID number, group, name of
lecturer, date of submission.
iii) Content of information - Type of project, parties involved and the list of principal drawing -
description of architectural, structural and civil engineering drawings).
iv) List of drawing - Produce/ draw by using AutoCAD. Proper arrangement of the drawing.
v) Conclusion – Discussion on what you have gained (knowledge, experience and etc.) throughout
the process of completing the project.
vi) References - Any books, notes, etc which is been referred in completing this project.
vii) Appendix - Attachment of drawing which has been referred and CD (softcopy of project)
Font: Times New Roman (12 font size), Title should be in upper case and bold.
Page Numbers: Page number should be placed on the right side at the bottom of the page.
SUBMISSION